NTT HKG1 Hong Kong: 53MW Financial Data Center Hyperscale Campus

Status: Operational   |   Location: 6 Chun Kwong Street, Tseung Kwan O Industrial Estate, N.T., Hong Kong


Project Overview

NTT Financial Data Center (HKG1 / FDC) is a flagship 53 MW data center campus located on a 30,000 m² company-owned site in the Tseung Kwan O Industrial Estate, Hong Kong. Purpose-built to support mission-critical financial services, enterprise computing, cloud platforms, and high-performance digital workloads, the campus comprises two independent data center towers, FDC1 and FDC2, along with a dedicated command and control tower, providing more than 70,000 m² of gross floor space and capacity for over 7,000 server racks. Strategically positioned adjacent to the Hong Kong Stock Exchange hosting site, HKG1 is designed to deliver ultra-low-latency connectivity for financial institutions, trading platforms, and global enterprises. The facility features Tier IV-ready fault-tolerant architecture with 2N power redundancy, ensuring exceptional reliability and continuous availability for mission-critical operations. Supporting power densities of up to 24 kVA per rack, the campus is optimized for high-density computing environments. Advanced cooling infrastructure includes UPS-backed water-cooled chillers and Computer Room Air Handler (CRAH) units, delivering energy-efficient temperature management while maintaining operational resilience. Combined with comprehensive physical security, carrier-neutral connectivity, and strategic proximity to Hong Kong's leading financial ecosystem, NTT HKG1 is one of Asia's premier data centers for financial, cloud, and enterprise digital infrastructure.


Quick Facts

FieldValue
Project NameNTT HKG1 Hong Kong: 53MW Financial Data Center Hyperscale Campus
Location6 Chun Kwong Street, Tseung Kwan O Industrial Estate, N.T., Hong Kong
StatusOperational
CommissioningFDC1: 2013 / FDC2: 2015 (Operational)
Total IT Load53.0 MW (FDC1: 23 MW / FDC2: 30 MW)
Total Capacity53.0 MW critical IT capacity across 70,000+ m² gross floor area housing 7,000+ racks in two data center towers
Tier LevelTier IV Ready Infrastructure (Certified Tier IV Design for FDC1 by Uptime Institute) / ISO 27001 & ISAE 3402 Certified
Project TypePurpose-Built Financial Services Colocation, Cloud & High-Density Compute Campus

City Profile

HeaderDetails
City NameTseung Kwan
Population~410,000
Urban Agglomeration~7.5 million (Hong Kong Metropolitan Area)
City GDPNot reported separately; part of the Hong Kong economy (approx. USD 410 billion)
Per Capita Income~USD 54,000
City TierTier 1 – Global Financial & Technology Hub
Key StrengthsModern planned township; proximity to Hong Kong's central business districts; excellent transport connectivity via MTR and highways; growing data center and digital infrastructure cluster; advanced telecommunications network; high-quality residential and commercial developments; skilled workforce; strong business environment and reliable utilities.

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner CLP Power Hong Kong Limited & Hong Kong Science and Technology Parks Corporation (HKSTP)
Construction Contractor Leading Regional Mission-Critical Civil & EPC Contracting Partners
MEP Engineering NTT Global Technical Engineering Division & Specialized APAC Mission-Critical Engineers
Network Connectivity Carrier-neutral site with multiple subterranean fiber entry vaults, direct dark fiber routes to Hong Kong Stock Exchange, and Asia-Pacific subsea landings.
Power Infrastructure Powered by dual high-voltage substations through diversified transmission paths, backed by 2N static UPS systems and continuous-rated diesel generators.

Technical Specifications

HeaderDetails
Power Capacity53.0 MW total critical IT capacity (FDC1: 23 MW, FDC2: 30 MW)
UPS RedundancyFault-tolerant 2N concurrently maintainable UPS power topology supported by continuous-rated standby generators with bulk fuel storage.
Cooling System UPS-powered continuous cooling featuring N+1 water-cooled chillers, CRAH/CRAC units, and water storage loops.
Connectivity Carrier-neutral design featuring diversified fiber entry points, dual Meet-Me-Rooms, and direct local/international carrier access.Carrier-neutral design featuring diversified fiber entry points, dual Meet-Me-Rooms, and direct local/international carrier access.
PUE Target 1.30–1.35
Energy Mix High-efficiency utility grid power integration combined with energy-saving cooling automation and green building technology.

Milestones

HeaderDetails
Announcement 2010
Construction Start 2011
Phase 1 Go-Live 2013 (FDC1 Launch - 23 MW)
Full Buildout Operational (FDC2 Expansion live - 30 MW)

Investment Details

HeaderDetails
Total Investment$500,000,000+ USD (~$4,000,000,000+ HKD)
Funding Direct corporate capital expenditure & infrastructure development financing managed by NTT DATA / NTT Communications