Project Overview

Unveiled in the presence of global leaders, Stargate UAE represents a cornerstone project within the U.S.–UAE AI Acceleration Partnership and signals the country’s ambition to become a global hub for sovereign artificial intelligence infrastructure. The $30 billion+ megacampus is being developed by G42 in collaboration with a powerful “Global Tech Alliance” that includes OpenAI, Oracle, NVIDIA, SoftBank, and Cisco. The initiative is designed to create a next-generation AI computing environment capable of supporting hyperscale model training, large-scale inference, and advanced data processing across the Middle East and beyond.

A key objective of Stargate UAE is to enable “Sovereign AI” capabilities, allowing the UAE and regional partners to develop and operate advanced AI models locally while maintaining full control over data governance, cybersecurity, and regulatory compliance. This infrastructure will support major regional AI models such as Jais, one of the world’s leading Arabic large language models, as well as next-generation systems like K2 Think, designed for high-performance reasoning and enterprise AI workloads.

The first phase of the project includes a 200-megawatt AI compute cluster scheduled to become operational in September 2026. The campus is engineered with a highly resilient “Tri-Fuel” power architecture combining dedicated nuclear energy from the Barakah Nuclear Energy Plant, utility-scale solar generation, and natural gas backup systems to guarantee uninterrupted 24/7 AI operations.

In March 2026, South Korea officially joined the initiative as a strategic technology partner, further expanding the project’s international collaboration and strengthening its role as one of the world’s most ambitious AI infrastructure developments.


Quick Facts

FieldValue
Project NameStargate UAE | $30B 5GW G42 & OpenAI AI Campus Abu Dhabi
LocationAbu Dhabi
StatusUnder Construction
CommissioningPhase 1 (200MW): Q3 2026; Full 5GW target: 2030+
Total IT Load5,000 MW (5 GW)
Total Capacity1.0 GW Initial Cluster; Scaling to 5.0 GW Campus
Tier LevelTier IV (Sovereign AI Infrastructure)
Project TypeNation-Scale AI Training & Sovereign Cloud Hub

City Profile

HeaderDetails
City NameAbu Dhabi
Population~1.6 Million (City)
Urban Agglomeration~3.8 Million (Emirate)
City GDP~$310 Billion USD (Emirate)
Per Capita Income~$82,000 USD
City TierTier 1 Global Hub
Key StrengthsNuclear Power, Sovereign Funding, Strategic Neutrality

Companies Involved

HeaderDetails
Developer / Operator Khazna Data Centers
Strategic Infrastructure Partner Abu Dhabi AI & Advanced Technology Council (AIATC) / Mubadala.
Construction Contractor G42 Infrastructure Division / Local & International EPC Partners.
MEP Engineering Integrated G42/Khazna Engineering + Oracle Cloud Design.
Network Connectivity Cisco-powered
Power Infrastructure 5 GW Total: Nuclear (Barakah), Solar, and Natural Gas backup.

Technical Specifications

HeaderDetails
Power Capacity5,000 MW (5 GW)
UPS RedundancyFault-tolerant design with integrated industrial-scale battery storage.
Cooling System Advanced liquid cooling and adiabatic free-cooling for high-density GPU racks.
Connectivity Global low-latency backbone designed for
PUE Target < 1.15 (Targeted average for extreme desert environment)
Energy Mix 100% Carbon-Neutral goal via Nuclear and Solar integration.

Milestones

HeaderDetails
Announcement May 22, 2025 (Formalized May 2025, Expanded Jan 2026)
Construction Start Late 2025
Phase 1 Go-Live Q3 2026 (200MW Cluster)
Full Buildout 2030-2032

Investment Details

HeaderDetails
Total Investment$30 Billion+
Funding Mubadala, MGX, Microsoft ($1.5B equity), and G42 Group resources.