STT Chennai 7: 45MW AI-Ready Data Centre Campus Launch

Status: Active Phase 1 Operation / Phase 2 Scaling (June 2026 update)   |   Location: Siruseri IT Park, Chennai, Tamil Nadu, India.


Project Overview

The STT Chennai 7 facility at the Siruseri Tech Park represents a major milestone in STT GDC India's long-term national infrastructure expansion strategy. Designed specifically to support the next generation of artificial intelligence (AI) applications, the facility is engineered to handle high-density GPU clusters, accelerated computing environments, and compute-intensive Large Language Model (LLM) training workloads. As AI adoption accelerates across industries, demand for scalable, power-efficient, and low-latency digital infrastructure continues to grow, making STT Chennai 7 a strategically important addition to India's expanding data center ecosystem. The campus is being developed as part of STT GDC India's broader investment initiative under a ₹4,200 crore expansion agreement with the Government of Tamil Nadu. This partnership aims to strengthen the state's position as one of India's leading digital infrastructure hubs while attracting investments in cloud computing, AI, semiconductor design, and advanced enterprise technologies. The project is expected to contribute significantly to regional economic development through job creation, technology innovation, and improved digital connectivity.


Quick Facts

FieldValue
Project NameSTT Chennai 7: 45MW AI-Ready Data Centre Campus Launch
LocationSiruseri IT Park, Chennai, Tamil Nadu, India.
StatusActive Phase 1 Operation / Phase 2 Scaling (June 2026 update)
CommissioningPhase 1 (7.2 MW) went live in early 2026; continuous scaling underway to reach full capacity.
Total IT Load45.0 MW (Full campus critical IT capacity at buildout)
Total CapacityEngineered across multiple hyper-dense blocks to host specialized high-performance computing (HPC) environments.
Tier LevelRated 3 / Tier III Compliant (Concurrently maintainable infrastructure with absolute single-point-of-failure elimination)
Project TypeAI-Native Hyperscale Colocation & Cloud Interconnect Hub

City Profile

HeaderDetails
City NameChennai
Population~7.09 million (2021)
Urban Agglomeration~11 million (Chennai Metropolitan Area)
City GDP~$78.6 Billion USD (Estimated for Chennai, making it a key economic center)
Per Capita IncomeHigh (Relative to national average)
City TierTier 1 (Major metro and economic hub)
Key StrengthsMajor subsea cable landing station hub for South Asia, strong IT/ITES presence, established industrial and manufacturing base, skilled workforce.

Companies Involved

HeaderDetails
Developer / Operator ST Telemedia Global Data Centres
Strategic Infrastructure Partner Electronics Corporation of Tamil Nadu Limited (ELCOT) / Government of Tamil Nadu.
Construction Contractor Sterling & Wilson / Leading domestic Tier-1 technology EPC partners.
MEP Engineering In-house STT GDC global technical design team integrated with specialized local engineering agencies.
Network Connectivity Dual-route redundant fiber entries, diverse Meet-Me-Rooms (MMR), and close proximity to global subsea cable landing stations in Chennai to ensure ultra-low latency profiles.
Power Infrastructure Powered by direct high-voltage utility lines backed by an on-site dedicated substational step-down infrastructure with radial N+N main incomer configurations.

Technical Specifications

HeaderDetails
Power Capacity45.0 MW Planned Campus Load Limit.
UPS RedundancyN+2C configuration for ultimate battery and static transfer reliability across all active data halls.
Cooling System Highly flexible chilled-water infrastructure designed to seamlessly support direct-to-chip (D2C) liquid cooling loops and rear-door heat exchangers (RDHx).
Connectivity 100% Carrier-neutral network fabric with direct high-capacity dark fiber cross-connects to major global cloud service providers.
PUE Target < 1.32 (Aimed at optimized energy deployment using variable-speed mechanical loops and automated airflow management solutions).
Energy Mix Supported by captive green energy procurement contracts and renewable open-access platforms to target net-zero carbon operational footprints.

Milestones

HeaderDetails
Announcement Q1 2024
Construction Start Q3 2024
Phase 1 Go-Live Q1 2026
Full Buildout Scheduled for gradual deployment scaling through late 2028.

Investment Details

HeaderDetails
Total Investment₹4,200 Crore INR
Funding Supported by institutional capital via the global KKR and Singtel consortium alongside internal corporate cash flows.

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.