PDG MU1: 48MW Hyperscale Data Center Campus, Navi Mumbai

Status: Fully Operational / Phase 2 High-Density Expansion Active   |   Location: Midc Industrial Zone, Airoli, Navi Mumbai, Maharashtra 400708, India.


Project Overview

Situated in the highly connected Airoli technology corridor of Navi Mumbai, PDG MU1 is a multi-million-dollar flagship enterprise data center campus developed to support the rapidly growing infrastructure needs of global hyperscalers, cloud service providers, and large enterprises. Designed with scalability, resilience, and operational flexibility at its core, the campus is built to accommodate the increasing demand for AI computing, cloud platforms, digital services, and mission-critical enterprise applications. Its strategic location provides excellent connectivity to Mumbai's financial district, major telecommunications networks, and international subsea cable systems, making it an attractive destination for both domestic and international businesses. PDG MU1 combines internationally recognized engineering standards with highly resilient utility infrastructure to deliver reliable, high-performance colocation services. The campus incorporates redundant power distribution systems, advanced cooling technologies, and multiple layers of network connectivity to ensure maximum uptime and business continuity. These features enable customers to deploy critical IT workloads with confidence while meeting stringent performance and availability requirements.


Quick Facts

FieldValue
Project NamePDG MU1: 48MW Hyperscale Data Center Campus, Navi Mumbai
LocationMidc Industrial Zone, Airoli, Navi Mumbai, Maharashtra 400708, India.
StatusFully Operational / Phase 2 High-Density Expansion Active
CommissioningPhase 1 officially went live in December 2022; infrastructure continuously scaled to support heavy multi-megawatt hyperscale growth.
Total IT Load48.0 MW (Total master-planned campus IT load capacity across two buildings)
Total CapacitySpans a 6-acre digital campus site designed to house up to 10,000 server racks across two multi-story structural blocks.
Tier LevelTier III Certified (Uptime Institute Tier Standard - TCDD Certified Architecture)
Project TypeOperational Hyperscale Colocation & Multi-Cloud Interconnect Hub

City Profile

HeaderDetails
City NameMumbai
Population~18.4 Million (Urban Agglomeration)
Urban Agglomeration~18.4 Million (Mumbai UA)
City GDPHighest in India (Financial & Commercial Capital)
Per Capita IncomeHigh (Economic Engine of India)
City TierTier 1 Data Center Hub
Key StrengthsIndias Primary financial hub, highest fiber density, 9+ subsea cable landing stations, strong power grid access

Companies Involved

HeaderDetails
Developer / Operator Princeton Digital Group
Strategic Infrastructure Partner Maharashtra Industrial Development Corporation (MIDC).
Construction Contractor Leading Tier-1 domestic technology EPC and heavy industrial construction groups.
MEP Engineering Global mechanical design partnerships integrating smart high-capacity cooling manifolds and insulated busway structures.
Network Connectivity 100% Carrier-neutral network architecture featuring 3 geographically separated underground fiber entry points linked to national dark-fiber grids.
Power Infrastructure Empowered by independent utility feeds connecting directly to an on-site, highly insulated dedicated primary step-down substation.

Technical Specifications

HeaderDetails
Power Capacity48.0 MW Combined Campus Critical IT Load Profile.
UPS RedundancyDistributed 2N power distribution pathway configuration with completely isolated battery modules and dynamic fast-switching logic.
Cooling System Hyper-efficient chilled water loop configuration utilizing highly reliable magnetic-bearing chillers and intelligent hot/cold aisle physical isolation containment.
Connectivity Highly resilient, multi-operator Meet-Me-Rooms (MMR) with rapid cross-connect links directly to regional internet exchanges and subsea cable backbones.
PUE Target < 1.40 (Aimed at premium energy efficiency via automated building management systems and real-time smart thermodynamic tuning).
Energy Mix Strongly aligned with corporate sustainability goals, utilizing long-term open-access contracts to source clean solar and wind energy.

Milestones

HeaderDetails
Announcement Q1 2021
Construction Start H1 2021
Phase 1 Go-Live December 2022
Full Buildout Sequential building scale expansions driving modularly toward maximum campus load boundaries.

Investment Details

HeaderDetails
Total InvestmentApproximately $300 Million USD committed for the full development framework of the multi-building campus.
Funding Financed via parent capital allocations from Princeton Digital Group backed by institutional investments from Warburg Pincus and OTPP.

Stay Ahead in the Data Center World