KORE Digital 1560MW AI Green Data Center, Navi Mumbai

Status: Phase-I MOU Signed / In Development   |   Location: Strategic hyperscale zone, Navi Mumbai, Maharashtra, India.


Project Overview

Representing a significant shift from traditional telecommunications infrastructure to advanced high-performance digital infrastructure, KORE Digital's flagship data center has been purpose-built to support the rapidly evolving requirements of the artificial intelligence era. Designed from the ground up as an AI-ready campus, the facility is engineered to host high-density computing environments capable of supporting large-scale AI model training, cloud computing, high-performance computing (HPC), and other data-intensive workloads. The project reflects the growing demand for specialised infrastructure that can deliver the power, cooling, and scalability required by modern AI hardware. The development is backed by a strategic agreement with the Government of Maharashtra, reinforcing the state's ambition to become one of India's leading destinations for digital infrastructure investment. The collaboration is expected to strengthen Maharashtra's technology ecosystem by attracting hyperscale cloud providers, AI companies, enterprise customers, and global technology firms seeking reliable, future-ready data center capacity. In addition to supporting digital transformation initiatives, the project is expected to contribute to regional economic growth through infrastructure investment, employment generation, and technology innovation.


Quick Facts

FieldValue
Project NameKORE Digital 1560MW AI Green Data Center, Navi Mumbai
LocationStrategic hyperscale zone, Navi Mumbai, Maharashtra, India.
StatusPhase-I MOU Signed / In Development
CommissioningInitial phases scheduled to roll out modularly to meet immediate high-density AI compute demand.
Total IT Load1,560.0 MW (Full master-planned capacity for massive AI training and inference workloads)
Total CapacityMega-scale campus engineered to support extreme density layouts, optimized explicitly for multi-thousand GPU clusters.
Tier LevelTier III / Tier IV Compliant Architecture (Designed for mission-critical hyperscale uptime)
Project TypeGreenfield AI-Ready Hyperscale Green Data Center

City Profile

HeaderDetails
City NameNavi Mumbai
Population~1.12 million
Urban Agglomeration22+ million (Mumbai Metropolitan Region)
City GDPPart of the Mumbai Metropolitan Region economy, one of India's largest economic centers
Per Capita IncomeApproximately ₹350,000–₹450,000 per year
City TierTier 1
Key StrengthsPlanned urban infrastructure, IT parks, business hubs, JNPT port connectivity, excellent transportation network, educational institutions, growing data center ecosystem

Companies Involved

HeaderDetails
Developer / Operator KORE Digital Limited
Strategic Infrastructure Partner Government of Maharashtra (MOU framework ensuring fast-tracked regulatory and land approvals).
Construction Contractor Tier-1 industrial EPC conglomerates specialized in giga-scale technology infrastructure projects.
MEP Engineering Next-generation engineering partnerships focusing on high-capacity electrical distribution and closed-loop fluid transport systems.
Network Connectivity Ultra-low latency, carrier-neutral ecosystem integrating KORE's native dark-fiber networks with local landing stations for high-speed subsea backbones (including upcoming high-capacity regional cables).
Power Infrastructure Direct connection to high-voltage transmission lines with dedicated on-site green substations ensuring ultra-reliable power delivery.

Technical Specifications

HeaderDetails
Power Capacity1,560.0 MW Total Planned Power Architecture.
UPS RedundancyHigh-reliability, isolated parallel 2N configuration with fast-acting static transfer switches and advanced energy storage systems (ESS).
Cooling System Advanced liquid cooling ready (Direct-to-Chip and Immersion Cooling architectures) paired with hyper-efficient chilled water systems to manage extreme heat-flux densities.
Connectivity Multiple diverse fiber meet-me-rooms (MMR) with direct, low-latency paths to national internet exchanges and major hyperscale cloud zones.
PUE Target < 1.30 (Optimized for ultra-low overhead via specialized cooling topologies and automated thermodynamic monitoring).
Energy Mix AI Green Data Center blueprint utilizing a high percentage of renewable energy sourced via long-term green tariffs, open-access solar, and hybrid wind contracts.

Milestones

HeaderDetails
Announcement July 2026
Construction Start Q3 2026
Phase 1 Go-Live TBD (Modular scaling approach)
Full Buildout NA

Investment Details

HeaderDetails
Total Investment₹5,000 Crore (Approximately $600M+ USD allocated for Phase-I development framework).
Funding Corporate capital allocation, structured institutional debt, and strategic infrastructure finance routes.

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.