Sify Infinit Spaces 130MW AI-Ready Hyperscale Data Center, Chennai

Status: Under Construction / Expansion Phase (Financing secured June 2026)   |   Location: Chennai, Tamil Nadu


Project Overview


Quick Facts

FieldValue
Project NameSify Infinit Spaces 130MW AI-Ready Hyperscale Data Center, Chennai
LocationChennai, Tamil Nadu
StatusUnder Construction / Expansion Phase (Financing secured June 2026)
CommissioningPhase-wise modular activation scheduled to roll out to capture immediate South Indian high-density demand.
Total IT Load130.0 MW (Full master-planned site capacity across a three-tower architectural layout)
Total CapacityEngineered specifically for extreme-density AI workloads, utilizing India’s first NVIDIA-certified DGX-Ready configurations.
Tier LevelTier III concurrent maintainability standard, structured for mission-critical hyperscale resilience.
Project TypeGreenfield/Expansion AI-Ready Hyperscale Data Center

City Profile

HeaderDetails
City NameChennai
Population~7.09 million (2021)
Urban Agglomeration~11 million (Chennai Metropolitan Area)
City GDP~$78.6 Billion USD (Estimated for Chennai, making it a key economic center)
Per Capita IncomeHigh (Relative to national average)
City TierTier 1 (Major metro and economic hub)
Key StrengthsMajor subsea cable landing station hub for South Asia, strong IT/ITES presence, established industrial and manufacturing base, skilled workforce.

Companies Involved

HeaderDetails
Developer / Operator Sify Infinit Spaces
Strategic Infrastructure Partner International Finance Corporation (IFC - providing direct $71M debt alongside a $300M mobilization framework).
Construction Contractor Leading domestic industrial EPC firms specialized in rapid-deployment modular technology frames.
MEP Engineering Specialised liquid-to-air heat exchange engineering firms focusing on ultra-high kW rack configurations.
Network Connectivity Deeply dense fiber ecosystem integrating multiple diverse global subsea cable landing stations adjacent to the Chennai coastline with low-latency private cloud on-ramps.
Power Infrastructure High-voltage dual-feed utility connections supported by dedicated on-site sub-stations and isolated power distribution architectures.

Technical Specifications

HeaderDetails
Power CapacityUp to 130.0 MW Total Campus Capacity across three towers.
UPS RedundancyIsolated parallel 2N block redundant configuration coupled with high-capacity fast-acting battery energy storage systems (BESS).
Cooling System NVIDIA-certified Liquid Cooling infrastructure supporting up to 130+ kW per rack, combining closed-loop direct-to-chip (DLC) lines with high-efficiency variable-speed chilled water plants.
Connectivity 4+ diverse fiber paths entering independent Meet-Me-Rooms (MMR) with direct sub-millisecond interconnects to national exchanges.
PUE Target < 1.35 (Targeted via automated liquid cooling thermal loops and optimized variable-flow mechanical environments).
Energy Mix Sustainability-linked design structured around long-term green tariffs, captive open-access solar procurement, and hybrid clean energy matching.

Milestones

HeaderDetails
Announcement Q2 2025
Construction Start Active / Ongoing
Phase 1 Go-Live H2 2026 / Early 2027 (Modular Tower 1 Launch)
Full Buildout 2027

Investment Details

HeaderDetails
Total Investment$371M USD total financing package allocated globally between the Navi Mumbai and Chennai AI expansions.
Funding Sustainability-linked corporate debt framework led by IFC ($71M direct loan + $300M mobilized institutional debt).