STT GDC Navi Mumbai Khairane AI Ready Data Center Expansion

Status: Early Construction & Site Development Phase   |   Location: TTC Industrial Area, MIDC, Khairane Village, Navi Mumbai


Project Overview

Triggered by a strategic land acquisition valued at approximately ₹282 crore from Repro India Ltd., registered in mid-2026, STT GDC India is significantly expanding its footprint within Navi Mumbai's rapidly growing data center corridor. The acquisition of a 14,093-square-meter parcel in Khairane provides the company with a strategically located site to develop a next-generation hyperscale facility purpose-built for the era of artificial intelligence, cloud computing, and high-performance digital infrastructure. The campus is being designed with ultra-high-density, AI-ready architecture capable of supporting advanced GPU clusters, large-scale AI training and inference workloads, enterprise cloud platforms, and mission-critical digital services. Its infrastructure will incorporate scalable power delivery systems, resilient network architecture, advanced cooling technologies, and flexible data hall configurations to accommodate the increasing power densities demanded by next-generation computing environments. Positioned close to Mumbai's major fiber routes, internet exchanges, and submarine cable landing stations, the facility will deliver ultra-low-latency connectivity to South Mumbai's financial district, enabling seamless operations for global hyperscale cloud providers, banking and financial institutions, fintech companies, content delivery networks, and enterprise customers. The expansion reinforces STT GDC India's long-term strategy of strengthening its presence in India's largest digital infrastructure market while creating future-ready capacity capable of supporting the country's accelerating adoption of AI, cloud services, digital transformation, and data-intensive enterprise applications.


Quick Facts

FieldValue
Project NameSTT GDC Navi Mumbai Khairane AI Ready Data Center Expansion
LocationTTC Industrial Area, MIDC, Khairane Village, Navi Mumbai
StatusEarly Construction & Site Development Phase
CommissioningPhased infrastructure rollouts slated across late 2026 and throughout 2027
Total IT LoadEstimated 40 MW – 50 MW (Expanding STT GDC’s active Navi Mumbai pipeline alongside existing Mahape facilities)
Total CapacityPart of STT GDC India’s massive multi-megawatt nationwide push scaling beyond its active 400 MW national baseline.
Tier LevelTier III / Tier IV Compliant Architecture
Project TypeGreenfield development on newly acquired industrial land with existing built-up conversion potential.

City Profile

HeaderDetails
City NameMumbai
Population~18.4 Million (Urban Agglomeration)
Urban Agglomeration~18.4 Million (Mumbai UA)
City GDPHighest in India (Financial & Commercial Capital)
Per Capita IncomeHigh (Economic Engine of India)
City TierTier 1 Data Center Hub
Key StrengthsIndias Primary financial hub, highest fiber density, 9+ subsea cable landing stations, strong power grid access

Companies Involved

HeaderDetails
Developer / Operator ST Telemedia Global Data Centres
Strategic Infrastructure Partner Supported via corporate development structures and capital acceleration following global investments from KKR and Singtel.
Construction Contractor Leading domestic industrial builders and specialized global mission-critical data center EPC firms.
MEP Engineering NA
Network Connectivity A carrier-neutral terminal engineered with heavily redundant, diverse underground fiber conduits feeding into international subsea cable landing stations based across the Navi Mumbai coast.
Power Infrastructure Highly reliable high-voltage grid interconnection through specialized state sub-stations, backed up by clean-burning automated industrial generator systems.

Technical Specifications

HeaderDetails
Power CapacityHighly advanced power distribution configurations tailored to manage extreme densities per rack demanded by next-gen AI processing units.
UPS RedundancyN+N or block redundant continuous UPS setups matching international uptime compliance.
Cooling System AI-ready cooling frameworks prepared for hybrid deployment, utilizing close-coupled chilled water containment and liquid immersion or direct-to-chip cooling setups to safely house heavy high-kW workloads.
Connectivity Multi-path Meet-Me-Rooms offering dense local interconnection, major internet exchange (IX) points, and multi-provider dark fiber paths.
PUE Target Targeting optimized power usage efficiency (PUE) via smart building management systems, variable speed airflow mechanics, and real-time environment analytics.
Energy Mix High focus on green power integration utilizing regional solar/wind power purchase agreements (PPAs) to support sustainable corporate carbon mandates.

Milestones

HeaderDetails
Announcement Mid 2026
Construction Start Late 2026
Phase 1 Go-Live Mid-to-Late 2027
Full Buildout NA

Investment Details

HeaderDetails
Total InvestmentMulti-million dollar rollout initiated by a ₹282 crore upfront land acquisition value, expanding into a heavy capital-expenditure facility build.
Funding Accelerated funding through institutional backing, ahead of planned public market digital infrastructure capital raises.