SUNeVision MEGA IDC Data Center Campus: Hong Kong's 180MW Flagship Hub

Status: Operational / Active Phased Development   |   Location: Tseung Kwan O Town Lot No. 131, Wan Po Road, Tseung Kwan O, New Territories, Hong Kong


Project Overview

SUNeVision’s MEGA IDC in Tseung Kwan O is Hong Kong’s largest purpose-built hyperscale data center campus, strategically developed to support the region’s rapidly growing demand for cloud computing, artificial intelligence (AI), machine learning (ML), high-performance computing (HPC), and next-generation digital services. As a cornerstone of SUNeVision’s extended MEGA Campus ecosystem, the facility delivers more than 180 MW of total IT power across approximately 1.2 million square feet of gross floor area, providing one of Asia’s largest hyperscale digital infrastructure platforms. Designed for high-density AI computing and exascale cloud deployments, the campus is engineered to accommodate advanced GPU clusters, enterprise workloads, and hyperscale cloud environments with highly resilient power, cooling, and network infrastructure. A key differentiator of MEGA IDC is its development on dedicated privately owned land, eliminating subleasing restrictions and providing customers with long-term operational flexibility and expansion opportunities. The campus is seamlessly interconnected through ultra-low-latency optical dark fiber backhaul to MEGA-i, Hong Kong’s leading carrier-neutral connectivity hub, enabling direct access to a dense ecosystem of telecommunications carriers, internet exchanges, cloud service providers, and content networks. It also benefits from direct connectivity to the Tseung Kwan O (TKO) Express subsea cable landing stations, providing high-capacity international network routes across Asia, North America, and Europe. Combining hyperscale scalability, strategic connectivity, resilient infrastructure, and AI-ready design, SUNeVision’s MEGA IDC serves as a future-ready digital infrastructure platform supporting Hong Kong’s position as one of Asia-Pacific’s leading cloud and interconnection hubs.


Quick Facts

FieldValue
Project NameSUNeVision MEGA IDC Data Center Campus: Hong Kong's 180MW Flagship Hub
LocationTseung Kwan O Town Lot No. 131, Wan Po Road, Tseung Kwan O, New Territories, Hong Kong
StatusOperational / Active Phased Development
CommissioningPhase 1 Go-Live: 2023 / Phased Buildout (2024–2026+)
Total IT Load180+ MW Critical IT Power Capacity Allocation
Total Capacity180+ MW Total Power Capacity across 1,200,000 sq ft (~111,500 m²) Gross Floor Area (GFA)
Tier LevelTier VIII / High-Tier Infrastructure Specifications (ISO 27001, ISO 14001, ISO 9001, ISO 20000, PCI-DSS, SOC 2 Type II Certified)
Project TypePurpose-Built Greenfield Hyperscale, High-Density AI/HPC Hub & Subsea Cable Landing Gateway

City Profile

HeaderDetails
City NameTseung Kwan
Population~410,000
Urban Agglomeration~7.5 million (Hong Kong Metropolitan Area)
City GDPNot reported separately; part of the Hong Kong economy (approx. USD 410 billion)
Per Capita Income~USD 54,000
City TierTier 1 – Global Financial & Technology Hub
Key StrengthsModern planned township; proximity to Hong Kong's central business districts; excellent transport connectivity via MTR and highways; growing data center and digital infrastructure cluster; advanced telecommunications network; high-quality residential and commercial developments; skilled workforce; strong business environment and reliable utilities.

Companies Involved

HeaderDetails
Developer / Operator SUNeVision Holdings Ltd.
Strategic Infrastructure Partner CLP Power Hong Kong Limited & Regional Subsea Cable Consortium Partners
Construction Contractor Sanfield (Management) Limited & Specialized Mission-Critical EPC Contractors
MEP Engineering SUNeVision In-House Global Engineering & Technical Infrastructure Teams
Network Connectivity Carrier-neutral ecosystem powered by SUNeVision MEGA Campus connectivity; direct optical fiber integration with MEGA-i (Chai Wan); direct access to domestic subsea fiber links (TKO Express), HKIX (Hong Kong Internet eXchange), and major subsea cable landing stations (HKIS-1).
Power Infrastructure Dedicated dual high-voltage 132kV on-site substations supplied by CLP Power, static distributed 2N uninterruptible power supply (UPS) systems, automated switchgear, and dedicated standby diesel/HVO generator plants with multi-day on-site fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity180+ MW Total Secured Utility Power Allocation
UPS Redundancy2N Redundant Static UPS System Configuration
Cooling System High-efficiency chilled-water plant with N+2 thermal redundancy, water-side economization, Direct-to-Chip Liquid Cooling (DLC) readiness (supporting densities up to 50–100+ kW per rack), and automated BMS environmental controls.
Connectivity Carrier-neutral access with direct express links to SUNeVision Cloud eXchange (SCX), offering low-latency cloud on-ramps (AWS, Azure, Google Cloud, Alibaba Cloud, Tencent Cloud) across Asia and Mainland China.
PUE Target < 1.30 Annualized Operational Design PUE
Energy Mix High-efficiency grid power with renewable energy certificate matching (CLP Renewable Energy Certificates) and rooftop solar PV arrays.

Milestones

HeaderDetails
Announcement December 2018 (Land Acquisition) / Development Phase: 2020–2022
Construction Start 2019
Phase 1 Go-Live 2023
Full Buildout Active Multi-Phase Building Expansion

Investment Details

HeaderDetails
Total InvestmentEstimated HK$ 10 Billion (~$1.28 Billion USD) Total Site & Infrastructure Development
Funding Corporate Capital Expenditure & Debt Financing by SUNeVision Holdings Ltd. / Sun Hung Kai Properties