Vantage Bordeaux AI & Cloud Data Center Campus (400MW)

Status: Announced / Pre-Construction   |   Location: Proximity to Bordeaux Metropolitan Area, bordeaux


Project Overview

The Vantage Bordeaux AI & Cloud Campus represents a landmark shift in the European data center landscape, moving massive compute power away from traditional "FLAP-D" markets (Frankfurt, London, Amsterdam, Paris, Dublin) into strategic regional hubs. Announced on February 24, 2026, this facility is a joint venture between global hyperscale provider Vantage Data Centers and Altarea, France’s leading low-carbon urban developer. The project is designed specifically to address the explosive demand for Artificial Intelligence (AI) and high-performance computing (HPC) workloads that require significant power density and cooling efficiency.

Spanning a massive site near Bordeaux, the campus has secured a direct 400MW power connection with the French utility grid, a rarity in an era of global power shortages. This massive capacity makes it one of the largest data center developments in France’s history. The choice of Bordeaux is strategic, offering lower latency to submarine cable landing stations and serving as a gateway for digital traffic between Southern Europe and the Atlantic.

The campus will feature multiple multi-story data center buildings, each engineered with high-density rack configurations capable of supporting liquid cooling—a necessity for modern AI GPUs. Sustainability is at the core of the build; the partnership with Altarea ensures the use of low-carbon construction materials and a design that targets a highly competitive PUE (Power Usage Effectiveness). Beyond the technical specs, the project is expected to be a major economic driver for the Nouvelle-Aquitaine region, creating thousands of construction jobs and hundreds of high-skilled permanent roles in digital infrastructure management.


Quick Facts

FieldValue
Project NameVantage Bordeaux AI & Cloud Data Center Campus (400MW)
LocationProximity to Bordeaux Metropolitan Area, bordeaux
StatusAnnounced / Pre-Construction
Commissioning2027 (Phase 1)
Total IT Load400 MW
Total Capacity400 MW (Grid-Secured)
Tier LevelTier III Equivalent
Project TypeHyperscale / AI-Ready Campus

City Profile

HeaderDetails
City NameBordeaux
Population257,068 (as of 2020)
Urban Agglomeration1,233,000 (Bordeaux Métropole)
City GDP$26.1 billion (approximate)
Per Capita Income$34,300 (approximate)
City TierTier 1
Key StrengthsBordeaux is known for its rich history, wine industry, cultural heritage, high-quality education, and strategic location in southwest France. It is a leading center for digital technologies and aerospace.

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner Altarea (Low-carbon urban development)
Construction Contractor TBA (Local French Prime Contractors)
MEP Engineering In-house Vantage Global Engineering
Network Connectivity Major European Carriers & Dark Fiber Providers
Power Infrastructure Secured 400MW via French National Grid (RTE/Enedis)

Technical Specifications

HeaderDetails
Power Capacity400 MW total site capacity
UPS Redundancy$N+1$ or $2N$
Cooling System Closed-loop chilled water with optional liquid-to-chip cooling
Connectivity Carrier-neutral with diverse fiber entry points
PUE Target PUE Target:
Energy Mix 100% Renewable energy certificates (RECs) and onsite solar potential

Milestones

HeaderDetails
Announcement February 24, 2026
Construction Start Q3 2026
Phase 1 Go-Live Late 2027
Full Buildout 2029

Investment Details

HeaderDetails
Total InvestmentEstimated €2.5 Billion - €3 Billion
Funding Private Equity / Corporate Balance Sheet

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.

Submit