Meta Lebanon AI Data Center Campus (1 GW)

Status: Under Construction (Groundbreaking: Feb 11, 2026)   |   Location: labanon city us


Project Overview

The Meta Lebanon Data Center Campus is a monumental $10 billion investment located within the LEAP Innovation District in Lebanon, Indiana. This project represents one of Meta’s most ambitious infrastructure builds to date, designed as a massive 1 Gigawatt (GW) AI factory. The campus is engineered to support the intense compute requirements of next-generation generative AI models while simultaneously powering Meta’s core suite of applications (Facebook, Instagram, and Threads).

Spanning a massive site in Boone County, the campus will feature multiple state-of-the-art data halls optimized for ultra-high-density AI hardware. A key technological highlight is the implementation of a water-efficient, closed-loop liquid cooling system that recirculates water, allowing the facility to operate with zero water consumption for the majority of the year. Meta has also committed over $120 million toward local public infrastructure, including extensive road upgrades, water systems, and new power transmission lines. In line with Meta’s sustainability goals, the campus will be 100% matched with clean energy and is pursuing LEED Gold certification.


Quick Facts

FieldValue
Project NameMeta Lebanon AI Data Center Campus (1 GW)
Locationlabanon city us
StatusUnder Construction (Groundbreaking: Feb 11, 2026)
CommissioningPhased rollout starting 2027/2028
Total IT Load1,000 MW (1 GW)
Total CapacityMulti-building Hyperscale Campus
Tier LevelTier III Equivalent
Project TypeHyperscale / Sovereign AI Factory

City Profile

HeaderDetails
City NameLebanon
Population2,000,000 (example
Urban Agglomeration2,500,000 (example)
City GDP$50 Billion (example)
Per Capita Income$25,000 (example)
City TierTier 1 (example)
Key Strengthseconomy, tourism hub, banking sector

Companies Involved

HeaderDetails
Developer / Operator Meta Platforms, Inc.
Strategic Infrastructure Partner Indiana Economic Development Corp (IEDC)
Construction Contractor To be finalized (Supporting 4,000+ jobs)
MEP Engineering Meta In-house Design
Network Connectivity Meta Private Global Fiber Network
Power Infrastructure Indiana Michigan Power (I&M) / AEP

Technical Specifications

HeaderDetails
Power Capacity1 GW Critical Load
UPS RedundancyN+1 Distributed Architecture
Cooling System Closed-loop Liquid Cooling (Recirculating)
Connectivity Carrier Neutral; High-Bandwidth AI Fabric
PUE Target 1.15
Energy Mix 100% Renewable Match (Solar/Wind)

Milestones

HeaderDetails
Announcement February 11, 2026
Construction Start February 11, 2026
Phase 1 Go-Live 2027 (Expected)
Full Buildout 2030

Investment Details

HeaderDetails
Total Investment$10 Billion
Funding Corporate Equity / Capital Expenditure