Vantage Data Centers’ WAW1 is a flagship hyperscale data center campus located on a 12-acre (5-hectare) site in Warsaw, Poland, serving as the company’s primary digital gateway into the rapidly growing Central and Eastern Europe (CEE) market. Strategically positioned approximately 30 minutes from Warsaw Chopin Airport, the campus provides excellent regional connectivity while supporting the increasing demand for cloud computing, enterprise colocation, and artificial intelligence infrastructure. WAW1 consists of two modern four-story data center facilities delivering a combined 48 MW of critical IT capacity across approximately 390,000 square feet of space. The campus is engineered to support high-density computing environments with an average power density of around 300 watts per square foot, making it well suited for hyperscale cloud platforms, GPU-intensive AI workloads, and high-performance computing applications. Reliable electrical infrastructure is provided through dedicated on-site utility sub-transmission connections supplied by E.ON/Innogy, ensuring resilient and scalable power delivery. To maximize operational efficiency and sustainability, the campus incorporates hyper-efficient closed-loop air-cooled chiller systems and a zero-water cooling architecture, significantly reducing water consumption while maintaining optimal thermal performance for mission-critical workloads. By combining scalable power infrastructure, AI-ready design, sustainable cooling technologies, and strategic connectivity, Vantage’s WAW1 campus strengthens Warsaw’s position as an emerging digital infrastructure hub and a k
| Field | Value |
|---|---|
| Project Name | Vantage Data Centers Warsaw WAW1: 48MW CEE Hyperscale Hub |
| Location | Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw, Poland (12-acre campus) |
| Status | Operational / Active Multi-Building Phase Expansion |
| Project Type | Greenfield Hyperscale, Cloud & Enterprise Data Center Campus |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Warsaw |
| Population | ~1.86 million |
| Urban Agglomeration | ~3.3 million |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.