Vantage Data Centers Milan: 96MW Italian Hyperscale & AI Infrastructure Hub

Status: Active Operation (MXP1) / Active Expansion Construction (MXP2)   |   Location: Milan, Metropolitan City of Milan, Lombardy, Italy


Project Overview

Vantage Data Centers’ Milan regional footprint represents one of Southern Europe’s most significant hyperscale digital infrastructure developments and has been recognized by the Italian government as strategically important national infrastructure. The platform is anchored by the 30-acre MXP1 (Milan I) campus in Melegnano, which delivers approximately 64 MW of IT capacity across 517,000 square feet of space, and is complemented by the 32 MW MXP2 campus in Castelletto. Together, the two campuses provide a combined 96 MW of scalable digital infrastructure, supporting the growing demand for hyperscale cloud services, enterprise applications, and artificial intelligence workloads across Italy and the wider European market. Strategically located, the campuses offer low-latency connectivity to major digital hubs including Frankfurt, Zurich, and Munich, enabling seamless access to regional cloud platforms and network ecosystems. The facilities are engineered with an average power density of approximately 204 watts per square foot and can scale up to 300 watts per square foot to support liquid-cooled, high-density AI and GPU deployments. Reliable electrical infrastructure is provided through direct 220 kV utility substation connections, ensuring long-term power availability and operational resilience. Sustainability is a key focus of the development, with near-zero water utilization efficiency (WUE) technologies and operations powered by 100% renewable energy. By combining resilient power infrastructure, advanced AI-ready design, sustainable operations, and strategic connectivity, Vantage’s Milan campuses strengthen Italy’s role as an emerging hub for hyperscale cloud computing and next-generation artificial intelligence infrastructure.


Quick Facts

FieldValue
Project NameVantage Data Centers Milan: 96MW Italian Hyperscale & AI Infrastructure Hub
LocationMilan, Metropolitan City of Milan, Lombardy, Italy
StatusActive Operation (MXP1) / Active Expansion Construction (MXP2)
CommissioningMXP1 Phase 1 Operational / MXP2 Phase 1 Go-Live: Q2 2026
Total IT Load96 MW Total Critical IT Load (64 MW MXP1 Campus + 32 MW MXP2 Campus)
Total Capacity~120+ MW Gross Utility Supply across combined Milan regional campus infrastructure
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 14001, ISO 27001, ISO 50001 Targeted)
Project TypePurpose-Built Greenfield Hyperscale, Cloud & AI Infrastructure Supercluster

City Profile

HeaderDetails
City NameMilan
Population~1.4 million
Urban Agglomeration~3.2 million
City GDP~USD 220–240 billion
Per Capita Income~USD 60,000–65,000
City TierAlpha Global City
Key StrengthsGlobal financial and fashion capital

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner DigitalBridge, Silver Lake, PSP Investments, Enel, Terna (Italian National Transmission Grid Operator)
Construction Contractor Specialized European Data Center EPC & Mission-Critical Contractors
MEP Engineering Specialized High-Density Data Center & Mission-Critical Engineering Partners
Network Connectivity Carrier-neutral platform featuring sub-10ms connections to key trans-European networks (Frankfurt, Zurich, Munich), dual Meet-Me-Rooms (MMRs), three fiber points-of-entry (POEs), and direct interconnects to Milan Internet Exchange (MIX).
Power Infrastructure Dedicated on-campus 220kV high-voltage substation supplied directly by Enel and Terna, 400V electrical configuration, static 2N / N+1 UPS systems, and N+1 emergency standby generator sets.

Technical Specifications

HeaderDetails
Power Capacity96 MW Critical IT Power (64 MW MXP1 + 32 MW MXP2)
UPS RedundancyHigh-efficiency static N+1 / 2N UPS topology with 100% concurrent maintainability
Cooling System Closed-loop chilled water systems with air-side economizers, Computer Room Air Handling (CRAH) units in dual galleries, direct-to-chip (DTC) liquid cooling manifolds for high-density GPU racks, and near-zero Water Utilization Efficiency (WUE).
Connectivity Carrier-neutral access with multi-path fiber entry vaults, dark fiber routes, and direct cloud cross-connects.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% renewable energy procurement matched via European Power Purchase Agreements (PPAs) and Guarantees of Origin (GoO).

Milestones

HeaderDetails
Announcement Q3 2020 (MXP1 Initial Announcement) / October 2025 (MXP2 Expansion & €4B National Framework Announcement)
Construction Start 2021 (MXP1) / Late 2025 (MXP2 Groundbreaking)
Phase 1 Go-Live Operational (MXP1) / Spring 2026 (MXP2 Phase 1 Target)
Full Buildout 2027–2029 (Full 96 MW regional multi-campus completion)

Investment Details

HeaderDetails
Total InvestmentEstimated €4,000,000,000 EUR (~$4.3B–$4.6B USD) total long-term Italian digital infrastructure investment framework (€350M+ allocated to MXP2)
Funding Vantage corporate equity, DigitalBridge / Silver Lake consortium funding, and long-term hyperscale tenant lease agreements