Yotta Dhaka Hyperscale Data Center Campus D1 (28 MW)
Status: Under Construction / Commissioning Phase | Location: Hi-Tech Park, Kaliakair, Gazipur, Greater Dhaka
Project Overview
The Yotta Dhaka Hyperscale Data Center Campus (specifically focusing on its flagship D1 building) represents a major cross-border expansion by Yotta Data Services into the rapidly digitalizing South Asian frontier. Strategically situated within the specialized tech enclave of the Bangabandhu Hi-Tech City in Kaliakair, Gazipur—just on the outskirts of the greater Dhaka metropolitan area this 28 MW development is custom-engineered to address Bangladesh's urgent, soaring demand for sovereign cloud storage, regional data residency compliance, and modern artificial intelligence (AI) computational frameworks.
Architecturally, the campus layout moves away from temporary modular arrangements by building permanent, highly secure multi-story structures designed to attain formal Uptime Institute Tier IV certification. The main D1 building features heavily reinforced structural concrete floors engineered specifically to withstand seismic activities common to the region, alongside custom-tailored data hall floor plans built to easily accept ultra-dense hardware layouts. This structural grounding allows the facility to serve as a reliable platform for local government platforms, rapidly scaling fintech ecosystems, and international hyperscale cloud entities seeking low-latency localized delivery.
From a technical standpoint, the campus is engineered with heavy electrical and mechanical safeguards, including an isolated parallel UPS framework that guarantees continuous power delivery without interruption. The cooling infrastructure relies on a highly advanced closed-loop chilled water design tailored to manage high thermal output efficiently under tropical climatic conditions while strictly minimizing environmental impacts. Operating with a targeted Power Usage Effectiveness (PUE) design rating of 1.22, the D1 site stands out as a highly resource-efficient facility within the country's grid ecosystem. Directly connected to the main national fiber rings, the data center provides seamless carrier-neutral integration when the initial modules enter active services in mid-2026.
Quick Facts
| Field | Value |
| Project Name | Yotta Dhaka Hyperscale Data Center Campus D1 (28 MW) |
| Location | Hi-Tech Park, Kaliakair, Gazipur, Greater Dhaka |
| Status | Under Construction / Commissioning Phase |
| Commissioning | Phased launch starting mid-2026 |
| Total IT Load | 28 MW (Across the initial phase multi-building blueprint) |
| Total Capacity | 28 MW |
| Tier Level | Tier IV Standard |
| Project Type | Hyperscale & Sovereign AI Cloud Data Center |
City Profile
| Header | Details |
| City Name | Dhaka |
| Population | Approximately 10.2 million |
| Urban Agglomeration | Approximately 24 million |
| City GDP | Estimated at approximately USD 200 billion (metro economy) |
| Per Capita Income | Approximately USD 8,000 (metro-area estimate) |
| City Tier | Tier 1 |
| Key Strengths | Bangladesh’s economic and political capital; major financial and commercial hub; strong telecommunications and technology ecosystem; large consumer market; expanding digital infrastructure; growing demand for cloud and data center services. |
Companies Involved
| Header | Details |
| Developer / Operator | Yotta Data Services Private Limited |
| Strategic Infrastructure Partner | Bangladesh Ministry of Posts, Telecommunications and Information Technology |
| Construction Contractor | Leading Regional EPC & Civil Engineering Contractor |
| MEP Engineering | Yotta In-House Design & Advanced Engineering Division |
| Network Connectivity | Dual diverse fiber entry points linked directly to national internet exchanges and landing stations |
| Power Infrastructure | On-site dedicated step-down substation drawing from redundant regional transmission lines |
Technical Specifications
| Header | Details |
| Power Capacity | 28 MW Total Site Allocation |
| UPS Redundancy | Isolated Parallel N+1 configuration backed by intelligent high-density Lithium-Ion storage units |
| Cooling System | Closed-loop chilled water distribution optimized for variable high-density compute configurations |
| Connectivity | Carrier-neutral, multiple international internet gateways, low-latency transit routing |
| PUE Target | 1.22 |
| Energy Mix | High-ratio sustainable grid matching integrated with energy-efficient backup infrastructure |
Milestones
| Header | Details |
| Announcement | Strategic Expansion Framework updated mid-2025 / Early 2026 Development Update |
| Construction Start | Structural foundation and core outer shell works advanced through late 2025 / Q1 2026 |
| Phase 1 Go-Live | Mid-2026 (Launch of the flagship D1 building block) |
| Full Buildout | Late 2027 |
Investment Details
| Header | Details |
| Total Investment | ~ $230 Million USD (Projected long-term cumulative campus investment) |
| Funding | Corporate capital allocation supplemented by regional infrastructure lines |