Apto Lacchiarella Data Center Campus: Technical Specs

Status: Announced / Pre-Construction & Permitting Phase   |   Location: Via SP105 / SP40 Junction Area, 20084 Lacchiarella, Metropolitan City of Milan, Italy


Project Overview

The Apto Lacchiarella Data Center Campus is a flagship 180 MW hyperscale data center development by Apto Digital Infrastructure, the European data center platform of PIMCO, located in Lacchiarella within the strategic South Milan digital corridor of Italy. The project represents a major multi-billion-euro investment and is being designed to meet the rapidly growing demand for high-density artificial intelligence computing, cloud infrastructure, and enterprise digital services. With 180 MW of planned capacity, the campus is engineered to accommodate power-intensive deployments, including dense GPU clusters required for AI model training, inference, machine learning, and other accelerated computing workloads. Its strategic location in the South Milan data center market provides access to established telecommunications networks, regional business centers, and Italy’s broader digital infrastructure ecosystem. The campus is also positioned to support sovereign cloud requirements, enabling organizations to deploy sensitive data and workloads within infrastructure governed by European and local regulatory frameworks. Advanced infrastructure is expected to support high-density computing environments while providing the scalability required by hyperscalers, cloud service providers, technology companies, and enterprises. The development’s large power capacity reflects the increasing electrical requirements of modern AI systems, where dense accelerator deployments require substantial energy and sophisticated cooling infrastructure. Its location within the Milan metropolitan area also strengthens connectivity to one of Italy’s most important commercial and technology hubs. By combining hyperscale capacity, AI-ready infrastructure, high-density GPU computing capabilities, and sovereign cloud potential, the Apto Lacchiarella campus represents a significant expansion of Italy’s digital infrastructure landscape. The project demonstrates the growing shift toward purpose-built facilities capable of supporting next-generation AI workloads while providing scalable capacity for global hyperscalers and enterprise customers.


Quick Facts

FieldValue
Project NameApto Lacchiarella Data Center Campus: Technical Specs
LocationVia SP105 / SP40 Junction Area, 20084 Lacchiarella, Metropolitan City of Milan, Italy
StatusAnnounced / Pre-Construction & Permitting Phase
CommissioningQ4 2027 Phase 1 Operation Target
Total IT Load~180.0 MW Critical IT Power (~220 MW Total Utility Power Capacity)
Total Capacity60,000 m² (~645,835 sq ft) total indoor floor space across three multi-story hyperscale structures
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant AI Hyperscale Architecture
Project TypeHyperscale Cloud, High-Performance Computing (HPC) & AI Infrastructure Super-Campus

City Profile

HeaderDetails
City NameLacchiarella
Population9,131 (December 2025)
Urban AgglomerationApproximately 3.5 million, Milan metropolitan area
City GDPNot separately reported
Per Capita IncomeNot separately reported
City TierTier 2, Milan Metropolitan Industrial and Infrastructure Location
Key StrengthsProximity to Milan, industrial and logistics activity, transport connectivity, access to the Lombardy business ecosystem, available land, and proximity to major technology and commercial markets.

Companies Involved

HeaderDetails
Developer / Operator Apto Digital Infrastructure
Strategic Infrastructure Partner Terna (Italian National Transmission Grid Operator), Enel Distribution, Municipality of Lacchiarella, Lombardy Region
Construction Contractor Specialized European Mission-Critical EPC Contractors
MEP Engineering Apto Mission-Critical Infrastructure Engineering Division & Specialized European MEP Consultants
Network Connectivity Carrier-neutral facility featuring path-diverse subterranean dark fiber entrance vaults, dual Meet-Me-Rooms (MMRs), and direct fiber trunks linking to Milan’s primary internet exchanges (MIX Milan) and international subsea cable backbones.
Power Infrastructure Dual high-voltage grid feeders connected to the Terna national transmission system, static 2N / N+1 UPS systems, automated fast-transfer switchgear, and emergency standby generators.

Technical Specifications

HeaderDetails
Power Capacity~220 MVA Dedicated Substation Grid Connection
UPS RedundancyConcurrently Maintainable Tier III 2N / N+1 Static UPS Architecture
Cooling System Direct-to-Chip (DLC) liquid cooling systems, rear-door heat exchangers (RDHx), dry coolers, and high-efficiency closed-loop chillers optimized for ultra-low water utilization.
Connectivity Sub-millisecond dark fiber latency routes connecting Lacchiarella to major data center hubs in Caldera Park, Settimo Milanese, and Frankfurt/Zurich corridors.
PUE Target < 1.18 Annualized Operational Design PUE
Energy Mix 100% renewable power procurement (backed by Power Purchase Agreements / PPAs for Italian solar and wind generation) with integrated district waste-heat recovery options.

Milestones

HeaderDetails
Announcement Private Equity / Institutional Capital (PIMCO Real Assets / Apto Capital Commitments)
Construction Start Late 2026
Phase 1 Go-Live Late 2026
Full Buildout 2029–2030 (Multi-Phase Rollout Across All 3 Buildings)

Investment Details

HeaderDetails
Total Investment~€1,200,000,000 – €1,500,000,000 EUR (~$1,300,000,000 – $1,600,000,000 USD Core Infrastructure Buildout)
Funding Private Equity / Institutional Capital (PIMCO Real Assets / Apto Capital Commitments)