Ascenty Vinhedo Campus
Status: Operational (Phase 1 & 2) / Under Expansion (Phase 3+) | Location: Vinhedo (Near Campinas/Greater São Paulo), Brazil
Project Overview
The Ascenty Vinhedo Campus, located in the municipality of Vinhedo in the greater São Paulo State region, is currently recognized as the largest data center campus in Latin America. The development is a joint venture between two global infrastructure powerhouses, Digital Realty and Brookfield, solidifying its position as the premier destination for hyperscale and major cloud provider deployments in the region. While the initial phases (Vinhedo 1 and 2) are already fully operational with over 61 MW of capacity, the current project focuses on the strategic expansion to add three more large data centers (Vinhedo 3, 4, and 5), bringing the total planned IT load of the campus to a massive 114 MW.
The campus's location is highly strategic, situated approximately 70 kilometers from the city of São Paulo, mitigating the higher operational costs and space constraints of the city proper while remaining highly connected to the main commercial and digital ecosystem. The facility is a certified Tier III environment, guaranteeing high resilience and 100% infrastructure availability. A key differentiator for Ascenty is its robust connectivity ecosystem. The campus is a central node on Ascenty's proprietary 5,000+ km fiber-optic network, offering direct, low-latency connections to the main Internet Exchange Points (IX.br) in São Paulo and Campinas, as well as private connections to all major cloud providers (AWS, Azure, Google Cloud, etc.).
Furthermore, Ascenty has made a significant commitment to ESG (Environmental, Social, and Governance) principles. All their operations, including the Vinhedo Campus, are powered by 100% renewable energy and are carbon neutral. The cooling systems employ advanced techniques like closed-loop chilled water systems, resulting in an effective Water Usage Effectiveness (WUE) of zero, a critical environmental achievement in a region where water management is paramount. This massive, sustainable, and highly connected campus underscores the accelerating digital transformation and cloud adoption driving the growth of the Latin American market.
Quick Facts
| Field | Value |
| Project Name | Ascenty Vinhedo Campus |
| Location | Vinhedo (Near Campinas/Greater São Paulo), Brazil |
| Status | Operational (Phase 1 & 2) / Under Expansion (Phase 3+) |
| Commissioning | Vinhedo 1 (2019), Vinhedo 2 (2020). Expansion phases ongoing. |
| Total IT Load | 114 MW |
| Total Capacity | Planned 5-building campus |
| Tier Level | Tier III |
| Project Type | Hyperscale Data Center Campus (Latin America's Largest) |
City Profile
| Header | Details |
| City Name | vinhedo (campinas metropolitan region |
| Population | City Population * |
| Urban Agglomeration | 2,093,118 in the 2022 Census |
| City GDP | 154,100 |
| Per Capita Income | high per capita earnings |
| City Tier | Tier 2 |
| Key Strengths | Strategic location (70 km from São Paulo, near Campinas), lower costs than São Paulo city, major logistics hub, high quality of life. |
Companies Involved
| Header | Details |
| Developer / Operator | Ascenty (A Digital Realty and Brookfield Company) |
| Strategic Infrastructure Partner | Direct connection to local power grid |
| Construction Contractor | Not publicly specified. |
| MEP Engineering | NA |
| Network Connectivity | Ascenty's proprietary 5,000+ km fiber-optic network |
| Power Infrastructure | NA |
Technical Specifications
| Header | Details |
| Power Capacity | V1: 27 MW; V2: 34 MW. V3-V5 Expansion: +44 MW (Total 114 MW) |
| UPS Redundancy | Tri-bus redundancy system |
| Cooling System | Dual coil cold water chiller system; Isolated technical corridors; Closed-loop cooling (for Water Usage Effectiveness - WUE = 0) |
| Connectivity | Carrier-Neutral; Direct connection with PIX Campinas and PIX São Paulo (IX.br); Direct connection with major Cloud Providers (AWS, Azure, Google Cloud, Oracle) |
| PUE Target | Average PUE well below market average (Commitment to operational efficiency) |
| Energy Mix | 100% Renewable Energy |
Milestones
| Header | Details |
| Announcement | Vinhedo 1 opened (2019); Vinhedo 2 opened (2020); Expansion phases ongoing. |
| Construction Start | Ongoing construction for future phases (V3, V4, V5) |
| Phase 1 Go-Live | V1 and V2 are operational. |
| Full Buildout | Total of 5 data centers, reaching 114 MW capacity. |
Investment Details
| Header | Details |
| Total Investment | V1/V2 initial investment approx. US$150 million+ (BRL 200M for V2). Total campus investment significantly higher. |
| Funding | Backed by Digital Realty (Global Data Center Leader) and Brookfield Infrastructure |