AVAIO Taurus Brandon: $6B AI Data Center Campus 1GW MS

Status: Under Construction (Site Work / Foundation)   |   Location: Brandon (Rankin County)


Project Overview

AVAIO Digital Taurus is a $6 billion hyperscale campus that represents the third-largest private investment in Mississippi's history. Formally announced in August 2025 and having broken ground shortly after, the project is currently in the heavy site-work phase as of March 2026. Located in Brandon’s East Metropolitan Center, the campus is designed to be a "pole of gravity" for AI and cloud computing in the Southeast, offering a strategic alternative to the saturated markets of Northern Virginia and Dallas.

The Taurus campus is distinguished by its multi-fuel power strategy. While the initial phase is supported by a 116 MW grid agreement with Entergy Mississippi, the master plan includes a "behind-the-meter" (BTM) thermal generation facility capable of ramping to 500 MW using the nearby Gulf South Pipeline. This ensures the site can scale independently of long-term utility transmission timelines. Sustainability is central to the design, featuring a "Zero-Waste" water approach that utilizes rainwater recapture and water-efficient cooling to minimize impact on the local Rankin County aquifer.


Quick Facts

FieldValue
Project NameAVAIO Taurus Brandon: $6B AI Data Center Campus 1GW MS
LocationBrandon (Rankin County)
StatusUnder Construction (Site Work / Foundation)
CommissioningPhase 1: H1 2027; Full Buildout: 2030+
Total IT Load1.1 GW (Potential Master Plan)
Total Capacity~600,000 Sq. Ft. (Phase 1)
Tier Level~600,000 Sq. Ft. (Phase 1)
Project TypeHyperscale / AI-Ready Data Center Hub

City Profile

HeaderDetails
City NameBrandon
Population50,000 (Population estimate, adjust accordingly)
Urban Agglomeration60,000 (Urban area population, adjust accordingly)
City GDP$2.5 billion (Adjust based on the latest data)
Per Capita Income$45,000 (Based on the national average or city data)
City TierTier 3
Key StrengthsStrong agricultural base

Companies Involved

HeaderDetails
Developer / Operator AVAIO Digital
Strategic Infrastructure Partner Entergy Mississippi / Rankin First
Construction Contractor Yates Construction (Lead GC)
MEP Engineering Syska Hennessy / DLB Associates
Network Connectivity Multiple long-haul fiber routes (Dallas-Atlanta path)
Power Infrastructure Entergy MS (Initial) / On-site Natural Gas (Future)

Technical Specifications

HeaderDetails
Power Capacity1,036 MW (1.03 GW) Total Baseload Path
UPS Redundancy$N+1$ or $2N$ (Customizable per Tenant)
Cooling System Water-efficient Hybrid with Rainwater Recapture
Connectivity 4 Diverse Non-Single-Point-of-Failure entry points
PUE Target 1.15
Energy Mix Grid + 20MW On-site Solar + Potential 500MW Gas BTM

Milestones

HeaderDetails
Announcement August 19, 2025
Construction Start September 2025 (Groundbreaking)
Phase 1 Go-Live H1 2027 (Energized June 2027)
Full Buildout 2030 (Targeting 1GW+)

Investment Details

HeaderDetails
Total Investment$6 Billion
Funding AVAIO Digital / Institutional Infrastructure Funds