AWS Pecos County Data Center Building B: Off-Grid Hyperscale AI Campus West Texas

Status: Under Development / Site Preparation (Permitted Off-Grid Infrastructure)   |   Location: GW Ranch Development Area, Pecos County (Permian Basin Region), Texas, United States


Project Overview

The AWS Pecos County Data Center (Building B) is a major compute block within Amazon’s planned off-grid hyperscale mega-campus in Pecos County, West Texas, designed to support the rapidly expanding infrastructure requirements of artificial intelligence, cloud computing, and high-performance workloads. Developed as part of Amazon Web Services’ strategy to secure large-scale, dedicated computing capacity, Building B is specifically designed to address the power availability challenges affecting major data center developments across Texas, including lengthy transmission interconnection queues and infrastructure constraints within the ERCOT market. Rather than relying entirely on conventional utility-grid connections, the facility is structured around dedicated behind-the-meter energy generation associated with the GW Ranch project site, providing a direct power architecture intended to support the enormous electricity requirements of hyperscale computing and next-generation AI infrastructure. This configuration can allow the campus to operate with greater control over its energy supply while reducing dependence on constrained regional transmission infrastructure. Building B is also engineered around the increasingly demanding thermal requirements of modern AI accelerators, incorporating custom liquid-cooling architectures designed for high-density computing environments. Advanced liquid cooling enables more effective heat removal from densely packed GPU and AI accelerator clusters than conventional air-based systems, supporting higher rack power densities and sustained computational performance. The facility forms part of a broader shift toward purpose-built AI data centers where electrical generation, cooling infrastructure, computing systems, and site design are developed as an integrated platform. Its location in West Texas also provides access to a large-scale energy ecosystem and expansive land resources suitable for hyperscale development. By combining dedicated behind-the-meter generation, off-grid-oriented infrastructure, advanced liquid cooling, and AI-focused compute architecture, AWS Pecos County Building B represents an emerging model for deploying massive data center capacity outside traditional grid-dependent development frameworks. The facility is positioned to support large-scale AI model training, cloud services, and other computationally intensive workloads requiring substantial power and high-density infrastructure.


Quick Facts

FieldValue
Project NameAWS Pecos County Data Center Building B: Off-Grid Hyperscale AI Campus West Texas
LocationGW Ranch Development Area, Pecos County (Permian Basin Region), Texas, United States
StatusUnder Development / Site Preparation (Permitted Off-Grid Infrastructure)
CommissioningPhased Delivery Target (Phase 1 / Building B Target 2027–2028)
Total IT Load~500.0 MW Critical IT Power Capacity (Building B Allocation; Campus Potential Scaling Multi-GW)
Total Capacity~50,000 m² (~538,000 sq ft) gross building area (Building B footprint on multi-thousand acre master site)
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant Off-Grid Architecture
Project TypePurpose-Built Off-Grid Ultra-Dense AI Compute & Cloud Processing Facility

City Profile

HeaderDetails
City NameFort Stockton
Population~9,000
Urban Agglomeration~9,000 (no major separate urban agglomeration)
City GDPNot separately reported; primarily part of the broader West Texas economy
Per Capita Income~US$30,000–35,000 (estimated)
City TierTier 3 – Energy, Logistics & Emerging Digital Infrastructure Location
Key StrengthsStrategic West Texas location; intersection of major transportation routes including Interstate 10 and U.S. Highway 285; strong oil and gas industry; abundant renewable energy potential; proximity to large-scale solar and wind resources; relatively low land costs; access to regional utility infrastructure; suitable conditions for energy-intensive industrial and digital infrastructure projects.

Companies Involved

HeaderDetails
Developer / Operator Amazon Web Services
Strategic Infrastructure Partner Pacifico Energy (GW Ranch Power Development)
Construction Contractor Specialized U.S. Mission-Critical Hyperscale EPCs & Industrial Contractors
MEP Engineering AWS Infrastructure Engineering & Advanced Thermal Architecture Teams
Network Connectivity Subterranean dual path-diverse fiber conduits, dedicated internal Meet-Me-Rooms (MMRs), ultra-high-capacity long-haul dark fiber linkages connecting directly to major Texas internet exchanges (Dallas, Austin, Houston) and global AWS backbone networks.
Power Infrastructure Direct behind-the-meter off-grid power supply via on-site simple/combined-cycle gas turbines supported by planned local solar and battery energy storage systems (BESS), 2N / N+1 static UPS modules, automated switchgear (ATS), and emergency back-up generation arrays.

Technical Specifications

HeaderDetails
Power CapacityIntegrated with 7.65 GW Dedicated On-Site Power Generation Complex
UPS RedundancyConcurrently Maintainable 2N Static UPS Architecture
Cooling System Direct-to-Chip Liquid Cooling (DLC) loops combined with high-efficiency dry-cooler units engineered for minimal water consumption in arid West Texas environments.
Connectivity Ultra-low latency optical dark fiber trunks connecting Pecos County directly to AWS US-East and US-West regional hubs.
PUE Target < 1.18 Annualized Operational Design PUE
Energy Mix Direct natural gas generation with supplemental planned 750 MW solar PV arrays and 1.8 GW Battery Energy Storage System (BESS) integration.

Milestones

HeaderDetails
Announcement 2025–2026
Construction Start 2026
Phase 1 Go-Live Target 2027–2028
Full Buildout Active Multi-Phase Mega-Campus Buildout

Investment Details

HeaderDetails
Total Investment~$2,500,000,000 USD (Building B & Associated Phase Power Allocation)
Funding Corporate Capital Expenditure (Amazon.com, Inc. / Amazon Web Services)