Microsoft Zaragoza Data Center Campus: €6.7B Hyperscale Cloud Hub Aragon Spain

Status: Permitted / Under Construction & Site Preparation   |   Location: Rda. Externa Anillar (Z-40) 50007 Zaragoza Spain


Project Overview

The AWS Pecos County Data Center (Building B) is a major compute block within Amazon Web Services’ planned off-grid hyperscale mega-campus in Pecos County, West Texas, designed to support the rapidly expanding infrastructure requirements of artificial intelligence, cloud computing, high-performance computing, and other data-intensive workloads. Developed as part of Amazon’s strategy to secure dedicated large-scale computing capacity, Building B is specifically engineered to address one of the most significant challenges facing hyperscale data center development in Texas: limited grid availability and lengthy transmission interconnection queues within the ERCOT market. Instead of depending entirely on conventional utility-grid infrastructure, the facility is designed around dedicated behind-the-meter energy generation associated with the GW Ranch project site, creating a direct power architecture capable of supporting the substantial electricity requirements of next-generation AI and cloud computing systems. This approach can provide greater control over energy availability while reducing exposure to regional transmission constraints that can delay conventional data center projects. Building B is also designed around the extreme thermal requirements of modern AI accelerators, incorporating custom liquid-cooling architectures capable of supporting high-density GPU and accelerator deployments. Direct liquid cooling enables efficient heat removal from densely concentrated computing equipment, allowing higher rack power densities while maintaining reliable operating temperatures and sustained performance. The facility reflects a broader industry shift toward integrated AI infrastructure, where power generation, electrical distribution, cooling systems, computing capacity, and site development are planned as a unified platform. Its West Texas location provides access to expansive land resources and a large-scale energy environment suitable for hyperscale expansion. By combining dedicated behind-the-meter generation, off-grid-oriented infrastructure, advanced liquid cooling, and AI-focused compute architecture, AWS Pecos County Building B represents an emerging model for developing massive computing facilities beyond traditional grid-dependent frameworks. The facility is positioned to support large-scale AI model training, cloud services, machine learning, and other computationally intensive applications requiring substantial power and high-density infrastructure.


Quick Facts

FieldValue
Project NameMicrosoft Zaragoza Data Center Campus: €6.7B Hyperscale Cloud Hub Aragon Spain
LocationRda. Externa Anillar (Z-40) 50007 Zaragoza Spain
StatusPermitted / Under Construction & Site Preparation
CommissioningPhased Delivery Target (Phase 1 Target 2026–2027 / 10-Year Multi-Site Buildout)
Total IT Load~300.0 MW Critical IT Power Capacity (Scaled Campus Capacity across Region)
Total Capacity~143.4 Hectares Total Land Area across Primary Zaragoza Sites (~59 ha at Puerto Venecia, ~84.4 ha at La Muela)
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant Enterprise Architecture
Project TypePurpose-Built Master-Planned Hyperscale, Azure Cloud Region & AI Compute Infrastructure

City Profile

HeaderDetails
City NameZaragoza
Population675,000
Urban Agglomeration800,000
City GDP€20 billion
Per Capita IncomeRoughly €23,000 per capita.
City TierTier 2 city in Spain
Key StrengthsStrong industrial base, especially in automotive, logistics, and renewable energy sectors.

Companies Involved

HeaderDetails
Developer / Operator Microsoft Corporation
Strategic Infrastructure Partner Government of Aragón, Red Eléctrica de España (REE), Local Renewable Energy Providers
Construction Contractor Leading European Mission-Critical General Contractors & Engineering Firms
MEP Engineering Microsoft Cloud Operations & Innovation (CO+I) Global Engineering Teams
Network Connectivity Dual path-diverse subterranean dark fiber vaults, dedicated Meet-Me-Rooms (MMRs), ultra-low latency direct links to major Iberian internet exchanges (MADIX, CATNIX) and European cross-border fiber routes.
Power Infrastructure Direct high-voltage transmission grid interconnections, static 2N / N+1 uninterruptible power supply (UPS) systems, automated transfer switchgear (ATS), and multi-megawatt emergency back-up diesel generators with on-site fuel reserves.

Technical Specifications

HeaderDetails
Power Capacity~350 MVA Grid Capacity Allocation across Planned Substation Additions
UPS RedundancyConcurrently Maintainable 2N / N+1 UPS Architecture
Cooling System Closed-loop adiabatic chilled water systems and direct air economization designed for zero-water or low-water usage, with Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters.
Connectivity Sub-millisecond optical fiber links connecting Zaragoza campus nodes to Microsoft's Madrid Cloud Region and major trans-European backbones.
PUE Target < 1.20 Annualized Operational Design PUE
Energy Mix 100% Renewable energy power purchase agreements (PPAs) utilizing local wind and solar assets across Aragón, advancing Microsoft's 2030 Carbon Negative objective.

Milestones

HeaderDetails
Announcement 2023–2024
Construction Start 2025–2026
Phase 1 Go-Live Target 2026–2027
Full Buildout Long-Term Phased Campus Expansion (2026–2034)

Investment Details

HeaderDetails
Total Investment~€6,690,000,000 EUR (~$7.2 Billion USD Total Multi-Year Commitment)
Funding Corporate Capital Expenditure (Microsoft Corporation)

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.