Project Overview
Project Taurus is a flagship $1 billion adaptive-reuse data center development by Raeden in Northwest Colorado Springs, Colorado, focused on transforming an existing industrial property into a high-density digital infrastructure facility. The project repurposes a legacy semiconductor manufacturing complex that was previously operated as a former Intel fabrication facility and later occupied by 3G Venture II for cryptocurrency mining, providing a strategic opportunity to convert an underutilized industrial asset into a modern corporate data center. The development is planned to deliver up to 50 MW of critical IT load while reutilizing a site that was originally engineered for approximately 100 MW of power delivery, giving the project substantial electrical infrastructure that can support future expansion and high-density computing requirements. By leveraging existing utility infrastructure, buildings, and industrial systems, Project Taurus follows the growing industry trend toward adaptive-reuse data center development, potentially reducing the time, land requirements, and infrastructure challenges associated with constructing an entirely new greenfield campus. The facility is being engineered to accommodate enterprise, cloud, high-performance computing, and other demanding digital workloads that require reliable power and resilient thermal management. A key component of the design is its closed-loop water cooling system, which is intended to provide efficient heat removal while limiting dependence on continuous freshwater consumption. This approach is particularly relevant for high-density computing environments where increasing rack power levels generate significantly greater thermal loads. The project also incorporates strict acoustic mitigation controls to address potential noise impacts associated with large-scale mechanical and electrical equipment, an important consideration given its proximity to surrounding communities and commercial areas. By combining substantial electrical capacity, adaptive reuse of an existing industrial facility, closed-loop cooling, and comprehensive acoustic management, Project Taurus demonstrates how legacy industrial properties can be repositioned for next-generation computing infrastructure. The development represents a significant investment in Colorado Springs’ expanding digital infrastructure ecosystem and highlights the potential of existing industrial sites to support the growing demand for high-density data center capacity.
Quick Facts
| Field | Value |
| Project Name | Project Taurus Data Center Colorado Springs: 50MW Hyperscale Conversion Raeden |
| Location | 5655 Copper Gate Drive (off Garden of the Gods Road), Northwest Colorado Springs, El Paso County, CO 80919, United States |
| Status | Under Planning / Entitlements Phase (Major Modification Approval Appeal Process) |
| Commissioning | Phased Delivery Target (Phase 1 Target 2027) |
| Total IT Load | 50.0 MW Critical IT Power Capacity (Approved mechanical filings show scalability up to 100 MW) |
| Total Capacity | ~210,000 sq ft (~19,500 m²) adaptive-reuse industrial building on a multi-acre suburban site |
| Tier Level | Tier III Equivalent Concurrently Maintainable Architecture |
| Project Type | Industrial Adaptive-Reuse, Purpose-Built Enterprise & Cloud Compute Facility |
City Profile
| Header | Details |
| City Name | Colorado Springs |
| Population | ~500,000 |
| Urban Agglomeration | ~750,000 |
| City GDP | ~US$50 billion (estimated) |
| Per Capita Income | ~US$45,000–50,000 (estimated) |
| City Tier | Tier 2 – Technology, Defense & Digital Infrastructure Hub |
| Key Strengths | Major U.S. defense and aerospace center; strong military and government presence; growing technology and cybersecurity ecosystem; abundant land for infrastructure development; access to Interstate 25 and regional transportation networks; strong fiber connectivity; competitive operating costs compared with Denver; access to renewable energy resources; skilled workforce; favorable environment for enterprise, cloud, and data center infrastructure. |
Companies Involved
| Header | Details |
| Developer / Operator | Raeden Infrastructure |
| Strategic Infrastructure Partner | Colorado Springs Utilities (CSU) & City of Colorado Springs |
| Construction Contractor | Mission-Critical General Contractors & Industrial Adaptive-Reuse Engineering Specialists |
| MEP Engineering | Raeden Infrastructure Engineering Teams & DLAA (Acoustical Consultants) |
| Network Connectivity | Dual path-diverse subterranean fiber entry vaults, dedicated Meet-Me-Rooms (MMRs), direct access to regional carrier backbones along the Front Range urban corridor. |
| Power Infrastructure | Direct connection to Colorado Springs Utilities substation infrastructure, static 2N / N+1 uninterruptible power supply (UPS) modules, automated transfer switchgear (ATS), and multi-megawatt emergency back-up diesel generators housed in sound-attenuated enclosures. |
Technical Specifications
| Header | Details |
| Power Capacity | 50 MW Initial Utility Capacity Allocation (Site infrastructure capable of supporting up to 100 MW gross power) |
| UPS Redundancy | Concurrently Maintainable 2N / N+1 UPS Architecture |
| Cooling System | Closed-loop air-cooled chiller system requiring zero daily water consumption for IT equipment, leveraging over 5,000 hours of natural free-air cooling annually in Colorado's high-altitude climate. |
| Connectivity | High-speed optical dark fiber routes linking Colorado Springs directly to Denver network exchange points and national cloud corridors. |
| PUE Target | < 1.25 Annualized Operational Design PUE |
| Energy Mix | Utility grid power supplied by Colorado Springs Utilities, with options for corporate green power offset programs. |
Milestones
| Header | Details |
| Announcement | 2025–2026 |
| Construction Start | Target 2026 |
| Phase 1 Go-Live | Target 2027 |
| Full Buildout | Active Single-Building Industrial Adaptive-Reuse |
Investment Details
| Header | Details |
| Total Investment | ~$1,000,000,000 USD Total Project Capital Expenditure |
| Funding | Private Infrastructure Capital (Raeden) |