AWS Susquehanna: 1920MW Pennsylvania Nuclear AI Campus

Status: Active / Operational Phase & Expanding   |   Location: 1,200-acre site adjacent to Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pennsylvania, USA


Project Overview

Amazon Web Services’ (AWS) Cumulus Susquehanna Data Center Campus in Salem Township, Pennsylvania, represents a landmark milestone in zero-carbon hyperscale digital infrastructure. Originally acquired from Talen Energy’s affiliate Cumulus Growth for $650 million, the 1,200-acre master-planned campus is situated directly adjacent to the 2.5 GW Susquehanna Steam Electric Station nuclear power plant. Supported by a massive $20 billion long-term infrastructure commitment from AWS and a 1,920 MW Power Purchase Agreement (PPA) with Talen Energy running through 2042, the site serves as a vital computing core for AWS enterprise cloud services and high-density artificial intelligence workloads. The development establishes a unique dual-power distribution framework. While initial phases operated via direct behind-the-meter nuclear interconnections, the campus expanded into a robust front-of-the-meter retail utility model interfaced with PPL Electric Utilities and the PJM Interconnection grid. This configuration provides AWS with direct access to continuous, baseload 24/7 carbon-free nuclear energy while supporting grid stability across Pennsylvania. The multi-building campus is engineered to support next-generation AWS Trainium/Inferentia silicon as well as NVIDIA GPU clusters operating at extreme power densities. Sustainability and resource efficiency are central to the campus master plan. Server halls incorporate advanced closed-loop chilled water and direct-to-chip liquid cooling manifolds, drastically reducing evaporative water consumption compared to traditional cooling towers. The $20B capital deployment acts as a massive economic anchor for Luzerne County, supporting thousands of skilled trade construction positions and creating hundreds of permanent technical roles in power management, network security, and mission-critical engineering.


Quick Facts

FieldValue
Project NameAWS Susquehanna: 1920MW Pennsylvania Nuclear AI Campus
Location1,200-acre site adjacent to Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pennsylvania, USA
StatusActive / Operational Phase & Expanding
CommissioningH1 2025 (Initial Phase Live)
Total IT Load1,600 MW
Total Capacity1,920 MW (Long-term nuclear power purchase agreement capacity across campus expansion)
Tier LevelTier III Compliant System Architecture
Project TypeGreenfield Nuclear-Powered Hyperscale Cloud & High-Density AI Supercomputing Campus

City Profile

HeaderDetails
City Namepennsylvania
Population13.1 million (approx.)
Urban Agglomeration8.5 million+ (combined major metro population including Philadelphia and Pittsburgh regions)
City GDPApproximately USD 1.05 trillion
Per Capita IncomeApproximately USD 76,000
City TierTier 1 – Major U.S. Economic & Industrial State
Key StrengthsStrong manufacturing and industrial base

Companies Involved

HeaderDetails
Developer / Operator Amazon Web Services
Strategic Infrastructure Partner Talen Energy, PPL Electric Utilities, PJM Interconnection, Luzerne County Economic Development
Construction Contractor Leading North American Mission-Critical EPC Contractors
MEP Engineering AWS Infrastructure Design & Specialized Mission-Critical MEP Partners
Network Connectivity Dual subterranean concrete entry vaults, direct redundant dark fiber links into regional Pennsylvania corridors, and carrier-neutral Meet-Me-Rooms.
Power Infrastructure Direct multi-gigawatt connection to Talen Energy’s 2.5 GW Susquehanna Nuclear Station via dedicated high-voltage step-down switchyards.

Technical Specifications

HeaderDetails
Power Capacity1,920 MW gross contracted nuclear power allocation
UPS RedundancyN+1 block-redundant static UPS topology paired with modular emergency standby diesel generator arrays with bulk fuel storage.
Cooling System Closed-loop chilled water distribution combined with direct-to-chip liquid cooling manifolds designed for high-density AI clusters.
Connectivity Carrier-neutral design featuring four physically separated subterranean fiber vaults and dual fortified Meet-Me-Rooms.
PUE Target 1.14
Energy Mix 100% 24/7 carbon-free nuclear energy sourced directly from the Susquehanna Steam Electric Station.

Milestones

HeaderDetails
Announcement March 2024 (Campus Acquisition)
Construction Start Q2 2024
Phase 1 Go-Live H1 2025
Full Buildout 2032 (Final capacity ramp under long-term Talen power agreement)

Investment Details

HeaderDetails
Total Investment$20,650,000,000 USD ($650M initial campus acquisition + $20B site expansion commitment)
Funding Direct corporate capital expenditure via Amazon.com, Inc. balance sheet reserves