Bridge Data Centres MY06 Johor Phase II: 100MW AI & Hyperscale Campus

Status: Operational / Active Multi-Phase AI Density Scaling   |   Location: 17 Jalan Digital 7, Sedenak Tech Park (Kidex Sedenak), 81000 Kulai, Johor, Malaysia


Project Overview

Bridge Data Centres’ MY06 Phase II is a flagship 100 MW hyperscale data center campus located on a 40-acre site within Sedenak Tech Park (STeP) in Johor, Malaysia, one of Southeast Asia’s fastest-growing digital infrastructure corridors. Strategically positioned near the Malaysia–Singapore border, the campus serves as a critical cross-border computing hub, enabling hyperscale cloud providers, multinational enterprises, and AI innovators to access scalable, cost-efficient infrastructure while maintaining low-latency connectivity to Singapore and the wider Asia-Pacific region. Phase II significantly expands the multi-building campus with infrastructure specifically engineered to support next-generation generative AI, machine learning, and high-performance computing (HPC) workloads, featuring high-density rack deployments, advanced power distribution, and state-of-the-art cooling technologies. The facility is powered by dedicated utility feeds from Tenaga Nasional Berhad (TNB), ensuring reliable and scalable power delivery to meet the demands of large-scale cloud and AI deployments. Designed as a carrier-neutral campus, MY06 offers access to major Malaysian and Singaporean fibre networks, enabling customers to build resilient, low-latency network architectures with seamless connectivity to regional internet exchanges and leading public cloud platforms through direct cloud on-ramps. To support increasingly power-intensive GPU clusters, the campus incorporates high-efficiency liquid-to-chip cooling systems, delivering superior thermal management, improved energy efficiency, and greater operational performance for high-density computing environments. Combined with resilient infrastructure, enterprise-grade security, sustainable design principles, and flexible expansion capabilities, Bridge Data Centres’ MY06 Phase II provides a future-ready platform for hyperscale cloud, AI, and enterprise customers driving digital transformation across Southeast Asia.


Quick Facts

FieldValue
Project NameBridge Data Centres MY06 Johor Phase II: 100MW AI & Hyperscale Campus
Location17 Jalan Digital 7, Sedenak Tech Park (Kidex Sedenak), 81000 Kulai, Johor, Malaysia
StatusOperational / Active Multi-Phase AI Density Scaling
CommissioningPhase 1 Go-Live: Late 2022 / Phase 2 Operational: 2023–2024 / AI Density Enhancements: 2025–2026
Total IT Load100 MW Total Critical IT Capacity (Combined Across Phase I and Phase II Buildings)
Total Capacity100 MW IT Load across 40 Acres (16.2 Hectares) Land Area with 3 Hyperscale Buildings
Tier LevelTier III Equivalent / Concurrent Maintainability (ISO 27001, ISO 14001, LEED Certified Design)
Project TypePurpose-Built Greenfield Hyperscale, Cloud Gateway & High-Density AI Data Center Campus

City Profile

HeaderDetails
City NameJohor Bahru
Population~1.7 Million
Urban Agglomeration~2.5 Million (Iskandar Malaysia region)
City GDPRM 150 Billion (State of Johor)
Per Capita Income~RM 42,000
City TierTier 1 (Malaysia) / Global Secondary Hub
Key StrengthsProximity to Singapore, abundant land, favorable power costs

Companies Involved

HeaderDetails
Developer / Operator Bridge Data Centres
Strategic Infrastructure Partner Tenaga Nasional Berhad (TNB Utility) & MDEC (Malaysia Digital Economy Corporation)
Construction Contractor Specialized Asian Mission-Critical EPC & Data Center Contractors
MEP Engineering Bridge Data Centres Global Design & High-Density Thermal Engineering Teams
Network Connectivity Multi-path underground fiber entry vaults; direct dark-fiber links across the Johor-Singapore Causeway and Second Link; carrier-neutral access to major regional ISPs and direct cloud on-ramps.
Power Infrastructure Dual high-voltage 275kV/132kV utility substation feeds supplied by TNB, static 2N / N+1 block-redundant UPS architecture, and N+1 emergency standby diesel generators with 48+ hours on-site fuel supply.

Technical Specifications

HeaderDetails
Power Capacity100 MW Total Campus IT Load Capacity
UPS Redundancy2N / N+1 Static UPS Architecture
Cooling System Efficient water-cooled/air-cooled chilled water system with N+2 redundancy, hot/cold aisle containment, and advanced cold-plate direct-to-chip and immersion liquid cooling capability for AI clusters up to 40 kW+ per rack.
Connectivity v
PUE Target < 1.25 Annualized Operational Design PUE
Energy Mix Matched renewable energy options via TNB's Green Electricity Tariff (GET) and Renewable Energy Certificates (RECs).

Milestones

HeaderDetails
Announcement Q4 2021 (Groundbreaking)
Construction Start Late 2021
Phase 1 Go-Live Late 2022
Full Buildout Operational / Continuous AI & Liquid Cooling Upgrades

Investment Details

HeaderDetails
Total InvestmentEstimated $600,000,000 USD to $800,000,000 USD (Full Campus Buildout)
Funding Bridge Data Centres / Chindata Group / Bain Capital corporate capital expenditure (CapEx) allocation