CDC Data Centres Auckland: 220MW Hyperscale & Sovereign Cloud Hub
Status: Operational / Active Hyperscale Expansion & Development | Location: Dual-Campus Footprint: 29 Highgate Parkway, Silverdale 0932 & 32 Westpoint Drive, Hobsonville, Auckland 0618, New Zealand
Project Overview
CDC Data Centres' Auckland regional development represents New Zealand’s first and largest hyperscale data center ecosystem, strategically spanning two interconnected campuses in Silverdale (SD1) and Hobsonville (HV1 and HV2). Together, the campuses currently deliver approximately 98 MW of operational IT capacity, with a long-term master plan to expand beyond 220 MW, providing one of the country’s most scalable digital infrastructure platforms. Purpose-built to support government agencies, hyperscale cloud providers, critical national infrastructure, and large enterprise organisations, the Auckland campuses are designed with a strong focus on data sovereignty, operational resilience, and mission-critical reliability. Engineered to meet stringent government-grade security requirements, the facilities provide highly resilient power and cooling systems backed by 100% availability guarantees, ensuring continuous operation for essential digital services and high-value workloads. Sustainability is a core component of the development, with the campuses powered entirely by 100% renewable electricity and supported by net-zero carbon certification, helping customers achieve ambitious environmental and sustainability targets. The interconnected campuses feature low-latency dark fibre links that enable seamless data replication, disaster recovery, and workload mobility between sites, while providing access to major New Zealand internet service providers and international subsea cable networks for high-speed regional and global connectivity. Designed to accommodate the growing demands of artificial intelligence (AI), machine learning, and high-performance computing (HPC), the facilities are also equipped with high-density liquid cooling readiness to support next-generation GPU infrastructure. Combined with enterprise-grade security, scalable infrastructure, and robust connectivity, CDC Data Centres’ Auckland ecosystem delivers a future-ready platform for secure cloud, AI, and digital transformation initiatives across New Zealand and the wider Asia-Pacific region.
Quick Facts
| Field | Value |
| Project Name | CDC Data Centres Auckland: 220MW Hyperscale & Sovereign Cloud Hub |
| Location | Dual-Campus Footprint: 29 Highgate Parkway, Silverdale 0932 & 32 Westpoint Drive, Hobsonville, Auckland 0618, New Zealand |
| Status | Operational / Active Hyperscale Expansion & Development |
| Commissioning | Phase 1 Go-Live: 2022 / Active Expansion to 220 MW+ Total Regional Capacity |
| Total IT Load | 98 MW Operational Capacity (Scalable to 220 MW+ Total Master-Planned Capacity) |
| Total Capacity | 220 MW+ Total Regional Footprint across 22,000+ m² technical whitespace (Silverdale SD1: 22 MW → 60 MW+, Hobsonville HV1: 22 MW, Hobsonville HV2: 54 MW) |
| Tier Level | Tier III Certified Design & Constructed Facility (Uptime Institute Tier III Equivalent, ISO 27001, ISO 14001, SOC 2, Certified Toitū net carbonzero) |
| Project Type | Purpose-Built Greenfield Hyperscale, Sovereign Cloud, Government & National Critical Infrastructure Campus |
City Profile
| Header | Details |
| City Name | auckland |
| Population | ≈ 1.6 million |
| Urban Agglomeration | ≈ 1.8 million (Auckland metropolitan area) |
| City GDP | ≈ USD 140–150 billion (largest city economy in New Zealand, contributes ~38% of national GDP) |
| Per Capita Income | ≈ USD 140–150 billion (largest city economy in New Zealand, contributes ~38% of national GDP) |
| City Tier | Tier 1 / Alpha Global City |
| Key Strengths | Financial and commercial capital of New Zealand, strong logistics and port infrastructure, major hub for technology and digital services, growing data center and cloud market, highly skilled workforce, stable regulatory environment, excellent quality of life, and strategic gateway between Asia-Pacific markets. |
Companies Involved
| Header | Details |
| Developer / Operator | CDC Data Centres |
| Strategic Infrastructure Partner | Vector / Transpower (Electrical Power Utilities) & New Zealand Government Digital Transformation Framework |
| Construction Contractor | Specialized New Zealand & Australian Mission-Critical EPC Contractors |
| MEP Engineering | CDC Global Engineering & High-Density Thermal Design Teams |
| Network Connectivity | Dual geodiverse dark-fiber campus interconnects linking Silverdale and Hobsonville; direct access to major New Zealand fiber backbones, Southern Cross & Hawaiki subsea cables, and low-latency cloud on-ramps. |
| Power Infrastructure | Dual high-voltage grid substation feeds supplied by Vector, static 2N / N+1 block-redundant uninterruptible power supply (UPS) architecture, and emergency standby diesel backup generators with 72+ hours of on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | 98 MW Operational IT Power / 220 MW+ Total Master-Planned Capacity |
| UPS Redundancy | 2N / N+1 Static UPS Architecture |
| Cooling System | Closed-loop water-free/low-water cooling technology with indirect evaporative economizers, hot/cold aisle containment, and liquid-to-chip direct cooling capability engineered to support high-density AI nodes up to 30 kW+ per rack. |
| Connectivity | Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), diverse underground fiber entry vaults, and high-speed cross-connects across the Auckland digital network corridor. |
| PUE Target | < 1.20 Annualized Operational Design PUE |
| Energy Mix | 100% matched renewable energy (hydro, wind, geothermal) certified by Toitū net carbonzero program. |
Milestones
| Header | Details |
| Announcement | 2019–2020 |
| Construction Start | 2020 |
| Phase 1 Go-Live | 2022 |
| Full Buildout | 2026–2028+ (Phased delivery across SD1, HV1, and HV2 expansion blocks) |
Investment Details
| Header | Details |
| Total Investment | Estimated NZD $500,000,000 to NZD $1,000,000,000+ (Full Campus Masterplan) |
| Funding | CDC Data Centres (Infratil / Future Fund) corporate capital expenditure (CapEx) allocation |