OADC Lagos Flagship Campus: 26MW Hyperscale & Subsea Gateway

Status: Operational / Active Multi-Phase Hyperscale Expansion   |   Location: Elegushi Royal Beach Road / Yemi Adetayo Street, Lekki Peninsula II, Lagos 105102, Nigeria


Project Overview

Open Access Data Centres’ OADC Lagos (LOS1) is West Africa’s flagship open-access, carrier-neutral data center campus, strategically located on a 4-hectare site in Lekki Peninsula II, Lagos, Nigeria’s leading commercial and digital economy hub. Designed to serve as a critical regional connectivity gateway, the campus delivers up to 26 MW of total site power across approximately 7,200 m² of technical whitespace, with capacity to support more than 3,200 high-density server racks. Purpose-built for hyperscale cloud providers, telecommunications operators, enterprises, financial institutions, and content delivery networks, OADC Lagos provides highly resilient infrastructure capable of supporting mission-critical applications, artificial intelligence (AI), cloud computing, and high-performance digital services. A defining feature of the campus is its direct integration with the Google Equiano subsea cable landing station, enabling ultra-low-latency international connectivity between West Africa, Europe, and South Africa while significantly increasing network capacity and reducing data transmission delays. The facility also offers open-access duct infrastructure connected to major terrestrial fiber networks, ensuring carrier-neutral connectivity and flexible network diversity for customers. With on-site access to the Internet Exchange Point of Nigeria (IXPN) and direct cloud on-ramps to leading public cloud platforms, organizations can establish efficient hybrid and multi-cloud environments with improved performance and reliability. Supported by resilient power systems, advanced cooling technologies, enterprise-grade physical security, and scalable infrastructure, OADC Lagos (LOS1) provides a future-ready digital platform that strengthens West Africa’s connectivity ecosystem and enables businesses to accelerate digital transformation, cloud adoption, and next-generation AI workloads across the region.


Quick Facts

FieldValue
Project NameOADC Lagos Flagship Campus: 26MW Hyperscale & Subsea Gateway
LocationElegushi Royal Beach Road / Yemi Adetayo Street, Lekki Peninsula II, Lagos 105102, Nigeria
StatusOperational / Active Multi-Phase Hyperscale Expansion
CommissioningPhase 1 Go-Live: Q4 2022 / Phase 2 Expansion & Cable Landing Station Integration: 2024–2026
Total IT Load20.0 MW Critical IT Load (26 MW Gross Substation Site Load)
Total Capacity26 MW Site Power / 25 MVA Utility Capacity across 9,563 m² (102,935 sq ft) total area / 7,200 m² whitespace
Tier LevelTier III Certified Design & Constructed Facility (Uptime Institute Tier III, ISO 9001, ISO 14001, ISO 27001, ISO 45001, ISO 50001, PCI-DSS Certified)
Project TypePurpose-Built Greenfield Hyperscale, Cloud Gateway, Open Access Cable Landing Station (CLS) & Colocation Campus

City Profile

HeaderDetails
City NameLekki Penninsula II
PopulationPart of Lekki (city population ~400,000+)
Urban Agglomeration~20–22 million (Lagos Metropolitan Area)
City GDPPart of the Lagos metropolitan economy (estimated USD 250+ billion)
Per Capita Income~USD 5,000–6,000 (Lagos urban estimate)
City TierTier 2 – Emerging Commercial & Technology Hub
Key StrengthsPrime residential and commercial district; proximity to Victoria Island and Ikoyi; access to the Lekki-Epe Expressway; expanding digital infrastructure; growing data center and technology investments; high-end real estate; business-friendly environment; access to Lekki Deep Sea Port and Dangote Refinery developments.

Companies Involved

HeaderDetails
Developer / Operator Open Access Data Centres Limited
Strategic Infrastructure Partner Eko Electricity Distribution Company (EKEDC Utility) & IXPN (Internet Exchange Point of Nigeria)
Construction Contractor Specialized African & European Mission-Critical EPC Contractors
MEP Engineering OADC Global Engineering & High-Density Thermal Design Teams
Network Connectivity Direct Cable Landing Station (CLS) for the Google Equiano Subsea Cable; carrier-neutral access to 24+ network providers, IXPN peering, dark-fiber routes into Lagos core business districts, and low-latency regional DCI links.
Power Infrastructure Dual high-voltage 33kV utility substation feeds supplied by EKEDC, static 2N / N+1 block-redundant uninterruptible power supply (UPS) architecture, and N+1 emergency standby diesel generators with 72+ hours of on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity20 MW Critical IT Power Capacity / 26 MW Total Site Substation Load
UPS Redundancy2N / N+1 Static UPS Architecture
Cooling System Closed-loop chilled water and precision air-handling units in N+1 redundancy, hot/cold aisle containment, and high-density liquid-to-chip direct cooling capability engineered to support up to 25 kW+ per rack.
Connectivity Carrier-neutral platform with dual Meet-Me-Rooms (MMRs), open-access fiber ducts, and global cloud orchestration via WIOCC Pan-African network ecosystem.
PUE Target < 1.35 Annualized Operational Design PUE
Energy Mix High-reliability grid integration supplemented by gas-fired IPP generation and solar PV array installations on-site.

Milestones

HeaderDetails
Announcement Q4 2021
Construction Start Late 2021
Phase 1 Go-Live Q4 2022
Full Buildout Operational / Phased Whitespace & High-Density Expansion Active

Investment Details

HeaderDetails
Total InvestmentEstimated $200,000,000 USD to $300,000,000 USD
Funding Open Access Data Centres / WIOCC Group corporate capital expenditure (CapEx) allocation

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.