Status: Operational | Location: 7100 Metropolis Drive & 7301 Metropolis Drive, Austin, TX 78703, USA
The CyrusOne Austin Campus, located at 7100 and 7301 Metropolis Drive in southeast Austin, Texas, represents a major enterprise colocation and hyperscale cloud development within the MetCenter business park. Situated near Austin-Bergstrom International Airport, the campus encompasses more than 172,000 square feet of hardened concrete data center infrastructure and provides approximately 27 megawatts of total critical power capacity for mission-critical corporate infrastructure, enterprise cloud deployments, high-density computing, and other demanding digital workloads. Electrical infrastructure is supplied through dual dedicated substation connections from Austin Energy, providing diverse power pathways and supporting continuous facility operations. The campus incorporates CyrusOne's Mass Modular design approach, combining scalable infrastructure with static uninterruptible power supply configurations and standby emergency diesel generators equipped with multi-day fuel reserves. These systems provide layered resilience and help protect critical computing environments against utility interruptions and other electrical events. The facility is also engineered around resource-efficient cooling strategies, utilizing waterless closed-loop chillers to maintain stable environmental conditions while minimizing or eliminating reliance on municipal water for routine cooling operations. This approach is particularly relevant for high-density computing environments where increasing rack power requirements create substantial thermal management challenges. As a major carrier-neutral connectivity gateway in the Austin market, the CyrusOne Austin Campus provides physically diverse subterranean fiber entrances designed to improve network resilience and connectivity availability. Direct cloud on-ramps enable customers to establish efficient connections to leading cloud platforms, while access to the CyrusOne National IX platform provides connectivity across major Texas technology hubs and broader network ecosystems. Its combination of scalable power infrastructure, resilient electrical systems, water-efficient cooling, and extensive network connectivity positions the CyrusOne Austin Campus as an important digital infrastructure asset supporting the continued expansion of enterprise cloud services, hyperscale computing, and high-density workloads across Central Texas.
| Field | Value |
|---|---|
| Project Name | CyrusOne Austin Campus Metropolis Drive 27MW Data Center |
| Location | 7100 Metropolis Drive & 7301 Metropolis Drive, Austin, TX 78703, USA |
| Status | Operational |
| Project Type | Enterprise Colocation, Hyperscale Campus & High-Performance Compute Hub |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Austin |
| Population | 1,000,000 |
| Urban Agglomeration | 2,400,000 |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.