EcoDataCenter Östersund Data Center Campus: 150MW Sustainable HPC Hub
Status: Under Construction / Phased Campus Buildout | Location: Municipality of Östersund, Jämtland County, Sweden
Project Overview
EcoDataCenter 2 in Östersund, Sweden, is a flagship 150 MW sustainable data center campus purpose-built to support the next generation of high-performance computing (HPC), artificial intelligence (AI), machine learning, and other compute-intensive digital workloads. Designed with sustainability at its core, the campus is constructed using climate-friendly mass timber and other low-carbon building materials, significantly reducing its environmental footprint compared to conventional data center developments. The facility operates entirely on 100% renewable electricity supplied through local hydropower and wind energy generated by Jämtkraft, enabling customers to deploy large-scale digital infrastructure with minimal carbon emissions. Engineered for advanced AI and GPU-based computing, EcoDataCenter 2 is equipped with direct liquid cooling infrastructure and immersion cooling readiness, supporting high-density rack deployments required for modern AI training, inference, and HPC applications. Beyond energy efficiency, the campus embraces a circular economy approach by recovering excess heat generated from IT operations and exporting it to its partner WA3RM, where it is reused to power commercial greenhouse food production, transforming waste energy into a valuable community resource. Strategically located in northern Sweden, the campus also benefits from a naturally cool climate that further enhances operational efficiency and cooling performance. Combining renewable energy, innovative cooling technologies, sustainable construction, and circular resource management, EcoDataCenter 2 represents one of Europe’s most environmentally advanced AI-ready data center campuses and a benchmark for sustainable digital infrastructure development.
Quick Facts
| Field | Value |
| Project Name | EcoDataCenter Östersund Data Center Campus: 150MW Sustainable HPC Hub |
| Location | Municipality of Östersund, Jämtland County, Sweden |
| Status | Under Construction / Phased Campus Buildout |
| Commissioning | Groundbreaking: 2024 / Phase 1 Go-Live: 2026 / Full Buildout: 2026–2028+ |
| Total IT Load | ~120 MW Critical IT Load |
| Total Capacity | 150 MW Total Utility Power Allocation across a 32-acre (~13-hectare) campus footprint |
| Tier Level | Tier III / Tier IV Equivalent Architecture (ISO 27001, ISO 14001, ISO 9001, EcoVadis Platinum Certified) |
| Project Type | Purpose-Built Hyperscale, Sustainable High-Density AI/HPC Factory & Circular Energy Hub |
City Profile
| Header | Details |
| City Name | Östersund |
| Population | ~53,000 |
| Urban Agglomeration | ~65,000 |
| City GDP | Part of Jämtland County economy (estimated SEK 35–45 billion) |
| Per Capita Income | ~SEK 450,000 (≈ USD 43,000) |
| City Tier | Tier 3 – Regional Technology & Sustainable Infrastructure Hub |
| Key Strengths | Regional capital of Jämtland County; abundant renewable hydropower; cool climate ideal for energy-efficient data centers; reliable power infrastructure; strong sustainability focus; growing digital infrastructure ecosystem; skilled workforce; excellent transport connectivity; strategic location for green technology and cloud infrastructure investments. |
Companies Involved
| Header | Details |
| Developer / Operator | EcoDataCenter |
| Strategic Infrastructure Partner | Jämtkraft (Local Power Utility) & WA3RM (Circular Industrial Food Production Partner) |
| Construction Contractor | Specialized Nordic Mission-Critical Engineering & EPC Contractors |
| MEP Engineering | EcoDataCenter In-House Infrastructure & Thermal Engineering Teams |
| Network Connectivity | Carrier-neutral platform with dual diverse underground fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); low-latency connection to Nordic backbones and international carrier networks. |
| Power Infrastructure | Dual high-voltage grid connections supplied by Jämtkraft, static N+1 / 2N uninterruptible power supply (UPS) systems, automated switchgear, and backup diesel generator plants fueled by Hydrotreated Vegetable Oil (HVO100). |
Technical Specifications
| Header | Details |
| Power Capacity | 150 MW Total Utility Capacity Allocation |
| UPS Redundancy | 2(N+1) / 2N Distributed Redundant Static UPS Architecture |
| Cooling System | Direct Liquid Cooling (DLC), Immersion Cooling readiness, air-side free-cooling, and closed-loop waste heat export integration for WA3RM circular greenhouse farming. |
| Connectivity | Carrier-neutral facility providing high-speed cross-connects and direct fiber connectivity to Scandinavian Internet Exchanges. |
| PUE Target | < 1.15 Annualized Operational Design PUE |
| Energy Mix | 100% Green Renewable Energy (Hydroelectric & Wind Power) sourced via Jämtkraft. |
Milestones
| Header | Details |
| Announcement | April 2023 |
| Construction Start | 2024 |
| Phase 1 Go-Live | 2026 (20 MW Initial Phase) |
| Full Buildout | 2026–2028+ (Phased Multi-Building Expansion) |
Investment Details
| Header | Details |
| Total Investment | Estimated SEK 2.5 Billion to SEK 4.0 Billion (~$240M–$380M USD) |
| Funding | Corporate Capital Expenditure & Sustainable Infrastructure Financing by EcoDataCenter / Areim |