EdgeConneX WAW03 Warsaw Data Center Campus: 12MW Hyperscale & Edge Hub in Poland
Status: Fully Operational / Active Campus Expansion | Location: Posag 7 Panien 1, 02-495 Warsaw, Poland
Project Overview
EdgeConneX’s WAW03 (EDCWAW03) facility is a key hyperscale edge data center located on the company’s Warsaw campus in the Ursus district of Warsaw, Poland, serving as a strategic digital infrastructure hub for Central and Eastern Europe. Delivering 10.8 MW of critical IT capacity with scalability to 12 MW, the facility is purpose-built to support hyperscale cloud providers, content delivery networks (CDNs), telecommunications operators, AI platforms, and enterprise customers requiring secure, low-latency colocation services. Designed to Tier III standards, WAW03 incorporates N+1 static UPS redundancy, resilient electrical distribution, and raised-floor forced-air plenum cooling to ensure high availability, operational efficiency, and uninterrupted performance for mission-critical workloads. The data center is engineered to accommodate high-density deployments and offers flexible colocation environments, including dedicated suites and custom-built pods that can be tailored to customer requirements. As a carrier-neutral facility, WAW03 provides direct, low-latency fiber connectivity to Warsaw’s major interconnection hubs, including the LIM Building and EPiX, Poland’s largest Internet Exchange, enabling seamless access to cloud platforms, network providers, and regional digital ecosystems. Managed through EdgeConneX’s proprietary EdgeOS DCIM platform, the facility benefits from real-time infrastructure monitoring, predictive operational management, and optimized energy performance, making WAW03 a critical platform for digital transformation, cloud expansion, and next-generation AI infrastructure across Poland and the wider European market.
Quick Facts
| Field | Value |
| Project Name | EdgeConneX WAW03 Warsaw Data Center Campus: 12MW Hyperscale & Edge Hub in Poland |
| Location | Posag 7 Panien 1, 02-495 Warsaw, Poland |
| Status | Fully Operational / Active Campus Expansion |
| Commissioning | Phase Go-Live: Operational / Multi-Phase Expansion |
| Total IT Load | 10.8 MW Critical IT Load (scalable to 12 MW) |
| Total Capacity | 12 MW IT Power Capacity for WAW03 (Part of broader Warsaw multi-building campus) |
| Tier Level | Tier III Built Design / ISO 27001, SOC 2 Type 3, PCI-DSS Certified |
| Project Type | Purpose-Built Edge Hyperscale, High-Density Colocation & Cloud Interconnect Gateway |
City Profile
| Header | Details |
| City Name | Warsaw |
| Population | ~1.86 million |
| Urban Agglomeration | ~3.3 million |
| City GDP | ~USD 120 billion |
| Per Capita Income | ~USD 38,000 |
| City Tier | Tier 1 – Central European Financial & Technology Hub |
| Key Strengths | Capital and largest city of Poland; major financial and business center; rapidly growing technology and startup ecosystem; expanding hyperscale and colocation data center market; highly skilled workforce; excellent road, rail, and air connectivity; strong cloud and digital infrastructure; strategic gateway to Central and Eastern Europe; member of the European Union single market. |
Companies Involved
| Header | Details |
| Developer / Operator | EdgeConneX |
| Strategic Infrastructure Partner | PGE Polska Grupa Energetyczna / E.ON Polska & EPiX (Internet Exchange) |
| Construction Contractor | Specialized CEE Mission-Critical EPC Contractors & Engineering Partners |
| MEP Engineering | EdgeConneX In-House Global Engineering & Critical Facilities Teams |
| Network Connectivity | Carrier-neutral platform with dual subterranean path-diverse fiber entrance vaults; redundant Meet-Me-Rooms (MMRs); direct low-latency dark fiber links connecting to Warsaw carrier hubs (LIM Center), EPiX, and major transit providers (Arelion, Orange Poland, Megaport, T-Mobile PL, Hurricane Electric). |
| Power Infrastructure | Dedicated high-voltage utility grid feeds with N+1 power distribution architecture, static distributed uninterruptible power supply (UPS) modules, automated switchgear, and standby emergency diesel backup generators with multi-day on-site fuel autonomy. |
Technical Specifications
| Header | Details |
| Power Capacity | 12 MW Secured Utility Power Allocation (WAW03 Facility) |
| UPS Redundancy | N+1 Redundant Static Uninterruptible Power Supply (UPS) Architecture |
| Cooling System | High-efficiency N+1 CRAC/CRAH precision units with raised-floor plenum forced-air cooling, free-cooling economizers, hot/cold aisle containment, Direct-to-Chip Liquid Cooling (DLC) readiness, and EdgeOS automated DCIM monitoring. |
| Connectivity | Carrier-neutral access with direct low-latency cloud express on-ramps and cross-connect options across European networks. |
| PUE Target | < 1.30 Annualized Operational Design PUE |
| Energy Mix | High-efficiency utility power aligned with EdgeConneX's global commitment to 100% renewable energy sourcing for its data center platform. |
Milestones
| Header | Details |
| Announcement | 2021–2022 |
| Construction Start | 2022 |
| Phase 1 Go-Live | Operational |
| Full Buildout | Operational Active Campus |
Investment Details
| Header | Details |
| Total Investment | Estimated $80,000,000 USD to $120,000,000 USD Campus Expansion Investment |
| Funding | Corporate Capital Expenditure & Infrastructure Equity Financing by EdgeConneX / EQT Infrastructure |