Ekibastuz Data Center Valley: Firebird AI Specs

Status: Under Construction / Early Buildout Phase   |   Location: Ekibastuz Industrial Zone, Pavlodar Region, Kazakhstan


Project Overview

The Ekibastuz Data Center Valley is a major hyperscale artificial intelligence infrastructure development in Ekibastuz, Kazakhstan, being developed by U.S.-based Firebird in partnership with Kazakhtelecom. Planned with an initial capacity of approximately 125 MW, the project is designed to support the rapidly expanding demand for artificial intelligence, high-performance computing, and large-scale GPU infrastructure in Central Asia. The development forms part of a long-term $30 billion investment vision aimed at establishing Ekibastuz as a significant regional hub for advanced digital infrastructure and AI computing. The campus is expected to leverage the region’s substantial industrial power infrastructure, providing the high-capacity electricity required to operate dense NVIDIA GPU clusters and other accelerated computing systems. These resources are intended to support computationally intensive applications, including foundation model training, AI inference, machine learning, and sovereign AI workloads requiring secure and locally hosted computing environments. Its location in Ekibastuz provides access to an established industrial energy ecosystem, which can help support the substantial power requirements associated with next-generation AI data centers. The project also has the potential to strengthen Kazakhstan’s domestic digital infrastructure by providing scalable computing capacity for government institutions, enterprises, technology companies, and AI developers. As AI adoption accelerates globally, the Ekibastuz Data Center Valley represents an emerging model in which large-scale computing facilities are developed alongside existing energy infrastructure to address the power demands of advanced AI systems. By combining hyperscale data center capacity, dense GPU deployments, and strategic energy resources, the project is positioned to contribute to Kazakhstan’s ambitions to become a regional center for AI, cloud computing, and digital innovation.


Quick Facts

FieldValue
Project NameEkibastuz Data Center Valley: Firebird AI Specs
LocationEkibastuz Industrial Zone, Pavlodar Region, Kazakhstan
StatusUnder Construction / Early Buildout Phase
CommissioningInitial Phase Targeted for 2026–2027 Rollout
Total IT Load~125.0 MW Initial Critical IT Load (Scalable to 1,000 MW / 1 GW)
Total CapacityPurpose-built AI factory supporting up to 75,000+ next-gen NVIDIA GPUs
Tier LevelTier III / Tier IV Equivalent Fault-Tolerant AI Architecture
Project TypePurpose-Built Sovereign AI Cloud, High-Performance Supercomputing & GPU Megacampus

City Profile

HeaderDetails
City NameEkibastuz
Population~132,000 in the city proper (2021 baseline)
Urban Agglomeration~145,000 for the broader city/municipal area
City GDPNot separately reported
Per Capita IncomeNot separately reported
City TierTier 2 – Major Industrial & Energy Hub
Key StrengthsCoal mining, electricity generation, industrial infrastructure, rail connectivity, large-scale energy resources, available industrial land, and established heavy-industry capabilities.

Companies Involved

HeaderDetails
Developer / Operator Firebird Cloud Operations Management
Strategic Infrastructure Partner Ministry of AI & Digital Development Kazakhstan, NVIDIA, CoreWeave, U.S. BIS Export Control Licensing
Construction Contractor Specialized EPC Contractors & Industrial Infrastructure Partners
MEP Engineering Firebird Thermal Systems & Kazakhtelecom Engineering Teams
Network Connectivity Carrier-neutral facility with path-diverse underground fiber vaults, dedicated Meet-Me-Rooms (MMRs), and high-capacity links via Kazakhtelecom's national fiber backbone.
Power Infrastructure Direct high-voltage transmission interconnections with the Ekibastuz power hub, backed by static 2N / N+1 UPS systems and emergency backup generator reserves.

Technical Specifications

HeaderDetails
Power Capacity~150 MVA Initial Dedicated Substation Capacity (Scalable to 1,200 MVA)
UPS RedundancyConcurrently Maintainable 2N / N+1 Static UPS Systems
Cooling System Direct-to-chip (DLC) closed-loop liquid cooling infrastructure, rear-door heat exchangers (RDHx), and dry coolers for extreme-density AI rack heat dissipation.
Connectivity Ultra-low latency fiber routes connecting Central Asia, Europe, and Asia-Pacific digital corridors.
PUE Target < 1.15 Annualized Operational Design PUE
Energy Mix Direct grid connection to Ekibastuz power stations integrated with regional renewable energy developments.

Milestones

HeaderDetails
Announcement August 2026
Construction Start Mid 2026
Phase 1 Go-Live Late 2026 / Early 2027
Full Buildout 2028–2030 Campus Scale-up

Investment Details

HeaderDetails
Total Investment~$30,000,000,000 USD (Masterplan Planned Infrastructure Target)
Funding Private Equity & Institutional Capital (Firebird, NVIDIA, CoreWeave, Global Tech Funds)