Hut 8 Beacon Point: 1GW Texas AI Data Center

Status: Under Development / Early Construction Phase   |   Location: Callicoatte Road, Nueces County, Corpus Christi, TX 78410, USA


Project Overview

Hut 8’s Beacon Point AI Data Center Campus is a flagship 525-acre greenfield digital infrastructure development located near Corpus Christi in Nueces County, Texas. Designed as a next-generation artificial intelligence computing hub, the campus follows Hut 8’s power-first development strategy, prioritizing access to large-scale energy infrastructure required for advanced AI workloads. The project is supported by an executed 1,000 MW (1 GW) electrical interconnection agreement with AEP Texas, providing the foundation for future expansion and high-density computing operations. Built specifically to support generative AI training, inference, and large-scale machine learning applications, Beacon Point is engineered around NVIDIA’s DSX reference architecture for gigawatt-scale AI factories. The facility is designed to deliver ultra-high rack power densities required by modern GPU clusters and next-generation AI systems. The entire 704 MW IT capacity has been fully commercialized through 15-year triple-net (NNN) anchor lease agreements with a high-investment-grade tenant, creating a strong long-term revenue foundation with a base-term contract value of approximately $19.6 billion. By combining strategic power availability, advanced AI-ready infrastructure, and long-term hyperscale partnerships, Hut 8’s Beacon Point campus represents one of the largest planned AI data center developments in North America, positioned to support the growing global demand for accelerated computing and AI infrastructure.


Quick Facts

FieldValue
Project NameHut 8 Beacon Point: 1GW Texas AI Data Center
LocationCallicoatte Road, Nueces County, Corpus Christi, TX 78410, USA
StatusUnder Development / Early Construction Phase
CommissioningQ1 2027 (Initial Energization) / Q3 2027 (Initial Data Hall Delivery)
Total IT Load704 MW IT Capacity
Total Capacity1,000 MW (1 GW) Utility Interconnection Capacity across 525 acres
Tier LevelTier III / Tier IV Equivalent (Fault-Tolerant, High-Density Compute Architecture)
Project TypeGreenfield High-Density AI & HPC Data Center Campus

City Profile

HeaderDetails
City NameTexas
Population~30.5 million (2025 est.)
Urban Agglomeration~27–28 million (major metro clusters combined)
City GDP~$2.4 trillion (2024 est., comparable to G7 economies)
Per Capita Income~$78,000
City TierTier 1 (Global Economic Powerhouse)
Key StrengthsEnergy (oil, gas, renewables), Data Centers & AI Infrastructure, Technology (Austin hub), Logistics & Trade (US–Mexico corridor), Manufacturing, Business-friendly policies, Large land & power availability

Companies Involved

HeaderDetails
Developer / Operator Hut 8 Corp.
Strategic Infrastructure Partner AEP Texas (Electric Delivery Service) & Vertiv (Cooling & Power Systems)
Construction Contractor Jacobs (Engineering, Design, and Infrastructure Execution)
MEP Engineering Vertiv & Jacobs Engineering Group
Network Connectivity High-capacity dark fiber backbones offering multi-terabit carrier-neutral connectivity and direct fiber pathways to major Texas internet exchanges.
Power Infrastructure Direct high-voltage interconnection with AEP Texas providing up to 1,000 MW dedicated utility delivery, supported by private dual-feed sub-transmission substations, block-redundant UPS, and backup generation.

Technical Specifications

HeaderDetails
Power Capacity1,000 MW Utility Interconnection / 704 MW Contracted IT Load
UPS RedundancyDistributed Redundant / Block Redundant Uninterruptible Power Supply topology
Cooling System Direct Liquid Cooling (DLC) and high-efficiency chilled-liquid loops optimized for NVIDIA DSX high-density AI architectures.
Connectivity Carrier-neutral multi-path fiber architecture with low-latency link options across the ERCOT/AEP transmission grid region.
PUE Target < 1.15
Energy Mix Connected to AEP Texas grid, leveraging Texas' high regional generation from wind, solar, and natural gas resources.

Milestones

HeaderDetails
Announcement Corporate note offerings ($4.25B senior secured debt), investment-grade project-level debt, and equity capital
Construction Start 2025 – 2026 (Site Preparation & Substation Engineering)
Phase 1 Go-Live Q1 2027 (Power Energization) / Q3 2027 (Data Hall Delivery)
Full Buildout 2028 – 2029 (Complete 1 GW Multi-Phase Ramp)

Investment Details

HeaderDetails
Total Investment~$17,000,000,000 USD (~$17 Billion USD combined capital investment across Phases 1 & 2)
Funding Corporate note offerings ($4.25B senior secured debt), investment-grade project-level debt, and equity capital