Project Overview

Meta’s Mesa Building 5 is a key hyperscale expansion facility within the company’s 2.5+ million square foot master-planned data center campus in Mesa, Arizona. Purpose-built to support Meta’s next-generation artificial intelligence (AI) infrastructure, the facility is designed to power large-scale AI training clusters, deep learning models, generative AI applications, and the company’s global digital platforms, including social media, messaging, and immersive computing services. Building 5 incorporates advanced direct-to-chip liquid cooling technology and high-density power delivery systems to efficiently support the thermal and electrical demands of modern GPU-based AI workloads. Powered entirely by 100% certified renewable electricity sourced through regional solar energy projects and utility partnerships, the facility reflects Meta’s long-term commitment to sustainable digital infrastructure and carbon reduction. To minimize water consumption in Arizona’s arid climate, Building 5 utilizes highly efficient dry-cooling technology that delivers up to 60% greater water efficiency than conventional industry cooling systems. The facility also features resilient electrical infrastructure, redundant power and cooling systems, advanced physical security, automated infrastructure management, and high-capacity fiber connectivity for low-latency global communications. As part of Meta’s expanding Mesa campus, Building 5 strengthens the company’s ability to deliver scalable, energy-efficient, and AI-ready digital infrastructure capable of supporting rapidly growing compute demands and future technological innovation.


Quick Facts

FieldValue
Project NameMeta Mesa Building 5: Hyperscale AI & Cloud Infrastructure Hub in Arizona
Location3841 S Ellsworth Rd, Mesa, AZ 85212, USA
StatusActive Development / Phased Buildout
CommissioningPhase 1 Go-Live: Target 2025–2026 / Active Campus Expansion
Total IT Load~70 MW to 100 MW Critical IT Power Capacity Allocation (Building 5 Allocation)
Total Capacity~500,000 sq ft (~46,450 m²) gross facility footprint (Campus Total: >2.5 Million sq ft across 5+ buildings / 300+ MW capacity)
Tier LevelTier III Equivalent Hyper-Resilient Design / LEED Gold Certified / ISO 27001, ISO 14001, SOC 2 Type II Compliant
Project TypePurpose-Built Owner-Occupied Hyperscale AI Training, Inference & Social Infrastructure Hub

City Profile

HeaderDetails
City NameMesa (East Valley)
Population~512,000
Urban Agglomeration~4,900,000 (part of the Phoenix–Mesa–Scottsdale metro area)
City GDP~USD 30–35 Billion (estimated economic output within Mesa area)
Per Capita Income~USD 36,000
City TierTier 2 U.S. Technology & Suburban Economic Hub
Key StrengthsAerospace manufacturing, semiconductor ecosystem, data centers, healthcare services, higher education, logistics, tourism, proximity to Phoenix tech corridor

Companies Involved

HeaderDetails
Developer / Operator Meta Platforms, Inc.
Strategic Infrastructure Partner Salt River Project (SRP) Utility Network & City of Mesa Municipal Authorities
Construction Contractor DPR Construction / Specialized US Mission-Critical Contractors
MEP Engineering Sheehan Nagle Hartray Architects & Burns & McDonnell / Meta In-House Engineering
Network Connectivity Private enterprise dark fiber network; redundant subterranean fiber entrance vaults; direct high-speed optical backhaul connecting Mesa to Meta’s global backbone and North American cloud interchanges.
Power Infrastructure Dual dedicated 230kV high-voltage utility substations on-site, static distributed 2N / Block Redundant UPS architecture, automated switchgear, and multi-megawatt standby diesel generator backup arrays with multi-day on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity~70 MW to 100 MW Secured Utility Power Allocation (Building 5 Allocation)
UPS RedundancyBlock Redundant / 2N Static UPS Architecture
Cooling System Direct-to-Chip Liquid Cooling (DLC) readiness for high-density AI clusters, closed-loop dry-cooling chilled water systems (60% higher water efficiency than industry average), and automated BMS environmental controls.
Connectivity Proprietary fiber mesh backbone linking to regional internet exchange points and global Meta data center nodes.
PUE Target < 1.15 Annualized Operational Design PUE
Energy Mix 100% Certified Renewable Energy backed by dedicated local SRP solar and energy storage Power Purchase Agreements (PPAs).

Milestones

HeaderDetails
Announcement 2022 (Campus Expansion Phase)
Construction Start 2022–2023
Phase 1 Go-Live Target 2025–2026
Full Buildout Active Multi-Phase Building Construction

Investment Details

HeaderDetails
Total InvestmentEstimated $200,000,000 USD to $350,000,000 USD Building Capital Expenditure ($1+ Billion Total Campus Investment)
Funding Corporate Capital Expenditure (Meta Platforms, Inc.)