NEOM Hyperscale Data Center: 500MW Sustainable Cloud Hub

Status: Under Construction / Early Phase Commissioning   |   Location: Oxagon, NEOM


Project Overview

The NEOM Hyperscale Data Center is a flagship infrastructure project located in the Oxagon district of Saudi Arabia’s futuristic city, NEOM. Designed to be the "digital backbone" of the region, this 500MW facility is engineered to support the cognitive cities of the future by integrating advanced AI, 5G, and IoT technologies into a single, seamless ecosystem. As a zero-carbon development, the project is powered exclusively by 100% renewable energy leveraging the region’s massive solar and wind potential and features a highly efficient liquid cooling system to handle the extreme desert climate while maintaining a target PUE of 1.15. The facility not only provides high-density compute for global hyperscalers like Oracle and Microsoft but also serves as a critical node for subsea cables connecting Europe, Asia, and Africa. By prioritizing data sovereignty and sustainable innovation, the NEOM data center stands as a global benchmark for large-scale, environmentally conscious digital infrastructure, aiming to accelerate the Kingdom’s Vision 2030 digital transformation goals.


Quick Facts

FieldValue
Project NameNEOM Hyperscale Data Center: 500MW Sustainable Cloud Hub
LocationOxagon, NEOM
StatusUnder Construction / Early Phase Commissioning
CommissioningPhase 1: 2025; Full Capacity: 2027
Total IT Load400 MW
Total Capacity500 MW
Tier LevelTier IV Certified
Project TypeHyperscale / Sovereign AI Data Center

City Profile

HeaderDetails
City NameNEOM
PopulationNEOM project aims for 1 million residents by 2030 and eventually 9 million by 2045
Urban Agglomeration90,000 residents by 2030
City GDPno specific GDP figure
Per Capita Incomenan
City TierGlobal Megacity / AI & Digital Hub
Key StrengthsUnlimited 100% renewable power, strategic location on the Red Sea (major subsea cable route), highly supportive regulatory environment (Vision 2030), and integrated digital infrastructure.

Companies Involved

HeaderDetails
Developer / Operator Tonomus
Strategic Infrastructure Partner Oracle Cloud / EzdiTek
Construction Contractor Bechtel Corporation
MEP Engineering AECOM
Network Connectivity Zain / STC / OneWeb
Power Infrastructure NEOM Enowa (Green Hydrogen & Solar)

Technical Specifications

HeaderDetails
Power Capacity500 MW Total
UPS Redundancy2N + 1
Cooling System Closed-loop Liquid Cooling & AI-optimized Airflow
Connectivity Blue-Raman Subsea Cable System; Low-Earth Orbit Satellite
PUE Target 1.15
Energy Mix 100% Renewable (Solar, Wind, and Green Hydrogen)

Milestones

HeaderDetails
Announcement Q4 2021
Construction Start Q2 2022
Phase 1 Go-Live Mid-2025
Full Buildout 2027

Investment Details

HeaderDetails
Total Investment$1 Billion+ (Initial Phase)
Funding Public Investment Fund (PIF)