PDG Greater Jakarta JC4: 240MW AI Hyperscale Mega-Campus
Status: Active / Groundbroken & Under Early Structural Piling (Tracking June 2026) | Location: Jalan Digital Perdana, 82100 Kulai, Johor Darul Ta'zim, Malaysia
Project Overview
The Princeton Digital Group JC4 Data Center Campus is a newly launched, massive 240 MW digital infrastructure development spanning a prominent 106,217 square meter land parcel inside the Greenland International Industrial Center (GIIC) in Bekasi Regency, Greater Jakarta. Officially announced in April 2026 following a successful land acquisition and large-scale utility power allocation, JC4 expands PDG's total operating and development footprint in the Indonesian market to an immense 400 MW. Advancing directly into structural civil works and foundation piling in mid-2026, the mega-campus is strategically situated just 1.7 kilometers from PDG's existing JC3 site. This hyper-local proximity allows both massive complexes to leverage shared high-voltage electrical grid interconnects and sub-surface dark fiber infrastructure, significantly enhancing operational resilience while lowering localized engineering overhead. Comprising four independent, identical 60 MW data center buildings, the JC4 campus is purpose-built from the ground up to support extreme rack power densities and advanced direct-to-chip liquid cooling setups demanded by global hyperscalers running heavy generative AI clusters
Quick Facts
| Field | Value |
| Project Name | PDG Greater Jakarta JC4: 240MW AI Hyperscale Mega-Campus |
| Location | Jalan Digital Perdana, 82100 Kulai, Johor Darul Ta'zim, Malaysia |
| Status | Active / Groundbroken & Under Early Structural Piling (Tracking June 2026) |
| Commissioning | Phase 1 initial building structure and critical shell handover set for late 2027 |
| Total IT Load | ~192.0 MW net critical operational compute capacity across full buildout |
| Total Capacity | 240.0 Megawatts (240 MW) gross ultimate utility power envelope |
| Tier Level | Tier III Compliant (Concurrently maintainable infrastructure topology) |
| Project Type | Greenfield Multi-Building, High-Density AI-Factory & Hyperscale Cloud Hub |
City Profile
| Header | Details |
| City Name | Jakarta |
| Population | over 42 million |
| Urban Agglomeration | 42 million |
| City GDP | $420.192 |
| Per Capita Income | $9,789 |
| City Tier | Tier 1: Mega-City |
| Key Strengths | Largest digital market in Southeast Asia, high cloud demand, government support. |
Companies Involved
| Header | Details |
| Developer / Operator | Princeton Digital Group |
| Strategic Infrastructure Partner | PT Puradelta Lestari Tbk (Deltamas Industrial Estate Management) |
| Construction Contractor | Leading Regional Pan-Asian Civil & Structural Mission-Critical Engineering Builders |
| MEP Engineering | PDG Global Advanced Design & Thermal Infrastructure Solutions Group |
| Network Connectivity | Carrier-neutral ecosystem utilizing multiple physically isolated, concrete-hardened subterranean network paths tied directly back to Jakarta's central internet exchanges |
| Power Infrastructure | PT Perusahaan Listrik Negara (PLN) Transmission Grid (Dedicated high-voltage on-site utility substation infrastructure) |
Technical Specifications
| Header | Details |
| Power Capacity | 240 MW gross utility allocation delivered via specialized high-voltage sub-stations built to balance extreme localized cluster spikes |
| UPS Redundancy | 240 MW gross utility allocation delivered via specialized high-voltage sub-stations built to balance extreme localized cluster spikes |
| Cooling System | Next-generation hybrid mechanical design pre-engineered for direct-to-chip liquid cooling loops alongside adaptive air-handling infrastructure |
| Connectivity | 4 physically isolated, concrete-hardened network entries ensuring absolute fiber loop protection and multi-carrier route diversity |
| PUE Target | $\le 1.25$ design-optimized annualized operating profile exceeding local environmental performance guidelines |
| Energy Mix | High-efficiency mechanical designs using advanced refrigerant management systems, targeting comprehensive green building certifications |
Milestones
| Header | Details |
| Announcement | 2026 - Q2 |
| Construction Start | 2026 - Q2 |
| Phase 1 Go-Live | 2027 - Q4 |
| Full Buildout | 2030 - Q2 |
Investment Details
| Header | Details |
| Total Investment | Multi-hundred million dollar long-term capital allocation forming a core component of PDG's wider $5 Billion Asian financing roadmap |
| Funding | $750 Million USD |