Polaris Forge 3 430MW High Density AI Factory Data Center

Status: Under Construction   |   Location: NorthaDakota


Project Overview

Polaris Forge 3 represents the massive expansion of the modern "AI Factory" blueprint. Developed by Applied Digital Corporation, this specialized facility is moving away from traditional enterprise data hosting toward high-density, high-performance computing (HPC) optimized exclusively for large-scale artificial intelligence training and inference workloads. Located on an expansive campus near Harwood, North Dakota, the facility is designed around an ultimate capacity of 430 MW of grid-connected utility power, driving 300 MW of net critical IT load to the server racks.  The site is being built following a structured, repeatable model proven during the deployment of Applied Digital's earlier phases. The physical envelope relies on multi-story, high-density construction featuring heavily reinforced walls and floor slabs capable of holding extreme equipment weights. It incorporates advanced liquid-to-chip cooling infrastructures to mitigate the immense thermal energy generated by next-generation GPU clusters. Financially backed by an active 15-year, take-or-pay colocation agreement with a premier U.S.-based investment-grade hyperscaler, this project solidifies the region as a primary powerhouse for the global AI infrastructure network.  


Quick Facts

FieldValue
Project NamePolaris Forge 3 430MW High Density AI Factory Data Center
LocationNorthaDakota
StatusUnder Construction
CommissioningAugust 2027 (Initial Operations)
Total IT Load300 MW (Net Critical IT Load)
Total Capacity430 MW (Gross Grid-Connected Utility Power)
Tier LevelTier III Equivalent (Concurrently Maintainable)
Project TypeAI Factory / High-Performance Computing (HPC) Colocation

City Profile

HeaderDetails
City NameHarwood
Population8,500 (approx.)
Urban Agglomeration9.4 million+ (Chicago Metropolitan Area)
City GDPPart of the Chicago metro economy valued at over USD 800 billion
Per Capita IncomePart of the Chicago metro economy valued at over USD 800 billion
City TierTier 3 City
Key StrengthsProximity to Chicago, strong residential community, transportation access, retail presence, quality infrastructure

Companies Involved

HeaderDetails
Developer / Operator Applied Digital
Strategic Infrastructure Partner Base Electron / Local Transmission Utility
Construction Contractor McGough Construction
MEP Engineering In-house Applied Digital Engineering Team & Standardized AI Partners
Network Connectivity Diverse Ultra-High-Throughput Fiber Paths (AI-Native Routing)
Power Infrastructure Dedicated 430 MW Substation Interconnect with Grid-Tied Utility Power

Technical Specifications

HeaderDetails
Power Capacity430 MW gross capacity
UPS RedundancyFully Redundant & Concurrently Maintainable Architecture
Cooling System Advanced Liquid Cooling & Eco-Efficient Multi-Story Airflow Systems
Connectivity High-bandwidth dark fiber pathways built for ultra-low latency cluster synchronization
PUE Target $< 1.20$
Energy Mix Grid-tied power matched with regional clean/renewable generation assets

Milestones

HeaderDetails
Announcement May 2026
Construction Start Mid-2026
Phase 1 Go-Live August 2027
Full Buildout Estimated 2029

Investment Details

HeaderDetails
Total Investment$7,500,000,000 USD
Funding Corporate Financing, Senior Secured Notes, and Institutional Credit Facilities