QTS Dallas Data Center Expansion: 300MW Texas Hyperscale Hub

Status: Active Operation & Multi-Phase Campus Construction   |   Location: Multi-site DFW footprint: 6431 Longhorn Dr, Irving, TX 75063 & 303 Mason Rd, Wilmer, TX 75172, USA


Project Overview

QTS Data Centers is undertaking a major regional expansion across the Dallas–Fort Worth metroplex, reinforcing its position as one of the largest hyperscale digital infrastructure providers in Texas. The expansion is anchored by the company’s established Irving data center, which delivers approximately 140 MW of capacity across more than 700,000 square feet of space, and is complemented by the development of the new South Dallas Mega-Campus in Wilmer. Together, these multi-building campuses are designed to meet the rapidly increasing demand for hyperscale cloud services, enterprise workloads, and next-generation artificial intelligence infrastructure. The expansion adds more than 1.4 million square feet of new technical space, providing scalable capacity for hyperscale cloud providers and large-scale AI deployments. Engineered to support GPU-dense computing environments, the facilities incorporate advanced direct liquid cooling (DLC) technologies that efficiently manage the thermal demands of high-performance AI servers and next-generation accelerators. Reliable electrical infrastructure is provided through high-voltage utility interconnections with Oncor Electric Delivery, enabling long-term power scalability for future expansion phases. The campuses also benefit from extensive low-latency, carrier-neutral fiber connectivity across major Texas network corridors, ensuring fast access to cloud platforms, enterprises, and internet exchange points. By combining large-scale power infrastructure, AI-ready cooling technologies, and strategic connectivity, QTS’s Dallas–Fort Worth expansion is positioned to support the growing demand for artificial intelligence, cloud computing, and high-performance digital infrastructure across North America.


Quick Facts

FieldValue
Project NameQTS Dallas Data Center Expansion: 300MW Texas Hyperscale Hub
LocationMulti-site DFW footprint: 6431 Longhorn Dr, Irving, TX 75063 & 303 Mason Rd, Wilmer, TX 75172, USA
StatusActive Operation & Multi-Phase Campus Construction
CommissioningIrving Campus Operational (140 MW); South Dallas Wilmer Expansion Phase 1 Go-Live: 2025–2026
Total IT Load~250 MW – 300+ MW Combined Regional Critical IT Capacity
Total Capacity~350+ MW Total Utility Interconnection Capacity across Irving (140 MW) and Wilmer South Dallas Mega-Campus (200+ MW)
Tier LevelTier III Equivalent / Concurrent Maintainability (BREEAM & LEED Certified)
Project TypeBrownfield Expansion & Greenfield Hyperscale / AI Mega-Campus Development

City Profile

HeaderDetails
City NameTexas
Population~30.5 million (2025 est.)
Urban Agglomeration~27–28 million (major metro clusters combined)
City GDP~$2.4 trillion (2024 est., comparable to G7 economies)
Per Capita Income~$78,000
City TierTier 1 (Global Economic Powerhouse)
Key StrengthsEnergy (oil, gas, renewables), Data Centers & AI Infrastructure, Technology (Austin hub), Logistics & Trade (US–Mexico corridor), Manufacturing, Business-friendly policies, Large land & power availability

Companies Involved

HeaderDetails
Developer / Operator QTS Data Centers
Strategic Infrastructure Partner Blackstone (Parent Private Equity Partner) & Oncor Electric Delivery (Utility Provider)
Construction Contractor DPR Construction / JE Dunn Construction
MEP Engineering Specialized High-Density AI & Data Center Mission-Critical Engineering Partners
Network Connectivity Carrier-neutral deployment with redundant dark fiber loops connecting directly to Dallas Equinix DA1/DA2 network hubs and regional internet exchanges.
Power Infrastructure Dual high-voltage grid connections supplied by Oncor Electric, static 2N / N+1 UPS systems, and N+1 emergency backup diesel generators with dedicated fuel storage.

Technical Specifications

HeaderDetails
Power Capacity350+ MW Total Utility Interconnection (140 MW Irving + 200+ MW South Dallas Wilmer Campus)
UPS RedundancyHigh-efficiency 2N / Block Redundant UPS architecture with fast-start standby generator sets
Cooling System High-efficiency closed-loop liquid cooling, Direct-to-Chip (DTC) cooling manifolds, and water-free indirect evaporative cooling systems designed for high-density AI racks.
Connectivity Carrier-neutral access to 15+ major telecom providers, diverse entry vaults, and dark fiber routes.
PUE Target ~1.18 – 1.22
Energy Mix 100% renewable energy matching via Texas wind/solar Power Purchase Agreements (PPAs) and ERCOT grid power.

Milestones

HeaderDetails
Announcement 2022 (Wilmer Site Acquisition) / 2024 (DC1–DC3 Expansion Phases)
Construction Start Q4 2024 (Wilmer South Dallas Campus Groundbreaking)
Phase 1 Go-Live Q4 2025 / Q1 2026 (South Dallas DC1 Delivery)
Full Buildout 2027–2028 (Completion of full multi-building Wilmer campus buildout)

Investment Details

HeaderDetails
Total InvestmentEstimated $2,000,000,000 USD to $3,000,000,000+ USD across multi-campus expansion
Funding Blackstone capital backing, corporate debt facilities, and long-term hyperscale tenant leases