Vantage Data Centers Salt Lake City Campus (Utah Regional Footprint)

Status: Active Development & Multi-Building Campus Construction   |   Location: Greater Salt Lake City Metro / Utah Data Center Corridor, Utah, USA


Project Overview

Vantage Data Centers is developing a large-scale hyperscale campus in the Salt Lake City region to support the growing demand for artificial intelligence, cloud computing, and enterprise machine learning infrastructure. Designed as a next-generation digital infrastructure hub, the campus is engineered to accommodate high-density computing environments capable of supporting advanced GPU clusters, large language model (LLM) training, and other compute-intensive AI applications. The development follows Vantage Data Centers’ standardized North American modular design, enabling rapid deployment, operational consistency, and scalable expansion as customer requirements grow. The facility is designed to deliver power densities of up to 300 watts per square foot, providing the flexibility needed for modern hyperscale cloud platforms and AI workloads. To efficiently manage the thermal demands of high-performance computing, the campus incorporates adaptive cooling technologies that support high-power GPU deployments while maintaining reliable performance and energy efficiency. Power is supplied through high-voltage utility connections from Rocky Mountain Power, ensuring a resilient and scalable electrical infrastructure for future growth. Sustainability is also a key component of the project, with the campus utilizing water-neutral closed-loop cooling architectures that significantly reduce local water consumption while maintaining efficient cooling performance. By combining scalable power infrastructure, AI-ready cooling technologies, modular construction, and sustainable operations, Vantage’s Salt Lake City campus is positioned to become a major digital infrastructure hub supporting next-generation cloud and artificial intelligence workloads in the western United States.


Quick Facts

FieldValue
Project NameVantage Data Centers Salt Lake City Campus (Utah Regional Footprint)
LocationGreater Salt Lake City Metro / Utah Data Center Corridor, Utah, USA
StatusActive Development & Multi-Building Campus Construction
CommissioningPhase 1 Go-Live: 2026
Total IT Load~150 MW – 200+ MW Total Critical IT Capacity
Total Capacity~250+ MW Total Utility Interconnection Capacity across multi-building footprint
Tier LevelTier III Equivalent / Concurrent Maintainability (LEED Silver / Gold Target)
Project TypeGreenfield Hyperscale & High-Density AI Data Center Campus

City Profile

HeaderDetails
City NameSalt Lake City
Population~210,000
Urban Agglomeration~1.3 million (Salt Lake City Metropolitan Area)
City GDPPart of the Salt Lake City metropolitan economy (approx. USD 120 billion)
Per Capita Income~USD 62,000
City TierTier 2 – Technology & Digital Infrastructure Hub
Key StrengthsGrowing technology and fintech ecosystem ("Silicon Slopes"); strategic western U.S. location; strong fiber connectivity; reliable power infrastructure; expanding hyperscale and colocation data center market; highly educated workforce; business-friendly policies; Salt Lake City International Airport; access to renewable energy and outdoor lifestyle attracting skilled talent.

Companies Involved

HeaderDetails
Developer / Operator Vantage Data Centers
Strategic Infrastructure Partner DigitalBridge / Silver Lake (Consortium Equity Partners) & Rocky Mountain Power (PacifiCorp Utility Provider)
Construction Contractor Mortenson Construction / DPR Construction / Laydon Construction
MEP Engineering Specialized High-Density Data Center & Mission-Critical MEP Partners
Network Connectivity Carrier-neutral facility featuring multiple diverse fiber entry vaults and direct low-latency connectivity to major Salt Lake City carrier exchange hubs and transcontinental dark fiber routes.
Power Infrastructure Dual high-voltage grid interconnections supplied by Rocky Mountain Power, "5 to make 4" distributed redundant UPS architecture, and N+1 emergency backup diesel generators with 24-hour on-site belly fuel storage.

Technical Specifications

HeaderDetails
Power Capacity250+ MW Total Substation Capacity
UPS RedundancyHigh-efficiency double-conversion 2N / "5 to make 4" distributed redundant UPS blocks
Cooling System Closed-loop chilled water system with air-cooled chillers, direct outside air economizers (near-zero water consumption), and direct-to-chip (DTC) liquid cooling manifolds for high-density GPU racks.
Connectivity Carrier-neutral access with multi-carrier fiber entry vaults and diverse underground conduit routes.
PUE Target ~1.18 – 1.22 Annualized PUE
Energy Mix Rocky Mountain Power grid interconnection matched with regional solar/wind Power Purchase Agreements (PPAs) supporting Vantage's 2030 net-zero carbon objective.

Milestones

HeaderDetails
Announcement 2023 / 2024
Construction Start Q4 2024 / Q1 2025
Phase 1 Go-Live Q2 2026 / Q3 2026
Full Buildout 2028–2029 (Multi-phase building expansions)

Investment Details

HeaderDetails
Total InvestmentEstimated $1,500,000,000 USD to $2,200,000,000+ USD across full multi-building campus buildout
Funding DigitalBridge, Silver Lake, PSP Investments equity capital, and corporate credit facilities

Stay Ahead in the Data Center World

Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.