QTS Phoenix Data Center Campus Arizona: 1GW Hyperscale & AI Infrastructure Footprint

Status: Operational / Multi-Phase Expansion Under Construction   |   Location: Multi-campus Phoenix metro footprint: 40th St Campus (Central Phoenix near Sky Harbor Airport) & Glendale West Valley Mega-Campus (Glendale, AZ)


Project Overview

The QTS Phoenix Data Center expansion represents one of the largest digital infrastructure developments in the Southwestern United States, significantly strengthening the Phoenix metropolitan area’s position as a leading hyperscale and AI data center market. The expansion builds upon QTS’s original 85-acre 40th Street campus in central Phoenix, where the PHX1 and PHX2 facilities together provide up to 210 MW of capacity for cloud, enterprise, and colocation customers. To meet the rapidly growing demand for hyperscale computing and artificial intelligence infrastructure, QTS has expanded its presence across Maricopa County with a 375+ acre mega-campus in Glendale. The new development is designed to accommodate major hyperscale cloud providers, enterprise customers, and large-scale AI training superclusters requiring high-density computing environments. The campus is engineered to support advanced liquid-cooled infrastructure capable of handling next-generation GPU deployments and AI workloads with elevated rack power densities. Reliable power delivery is provided through robust utility interconnections with Salt River Project (SRP) and Arizona Public Service (APS), ensuring scalable electrical capacity for future expansion. In addition, the campus benefits from high-capacity carrier-neutral fiber connectivity, enabling low-latency access to major cloud platforms, network providers, and enterprise ecosystems. By combining large-scale power infrastructure, advanced cooling technologies, and strategic connectivity, the QTS Phoenix expansion is positioned to support the growing demand for artificial intelligence, cloud computing, and high-performance digital infrastructure across North America.


Quick Facts

FieldValue
Project NameQTS Phoenix Data Center Campus Arizona: 1GW Hyperscale & AI Infrastructure Footprint
LocationMulti-campus Phoenix metro footprint: 40th St Campus (Central Phoenix near Sky Harbor Airport) & Glendale West Valley Mega-Campus (Glendale, AZ)
StatusOperational / Multi-Phase Expansion Under Construction
CommissioningInitial Phases Operational (DC1–DC3); Ongoing multi-phase expansion active through 2026–2028+
Total IT Load~750 MW – 1,000+ MW Combined Metro Capacity
Total Capacity~1 GW+ across central Phoenix (PHX1/PHX2 up to 210+ MW) and Glendale West Valley expansion (750+ MW across 375+ acres)
Tier LevelTier III / Tier IV Equivalent (Hyperscale & AI-Optimized Specifications)
Project TypeMaster-Planned Hyperscale & AI Data Center Supercluster Campus

City Profile

HeaderDetails
City NamePhoenix
Populationapprox 28,184$
Urban Agglomeration$approx 198,651$
City GDP$approx $10.91$ Billion USD
Per Capita Income$48,362 USD.
City TierSecondary U.S. Data Center Market
Key StrengthsVibrant Economy:

Companies Involved

HeaderDetails
Developer / Operator QTS Data Centers
Strategic Infrastructure Partner Blackstone (Parent Private Equity / Capital Partner), Salt River Project (SRP) / Arizona Public Service (APS) (Power Utilities)
Construction Contractor DPR Construction / Corgan (Architectural & General Contracting Partners)
MEP Engineering Specialized High-Density AI, Liquid Cooling, and Electrical Transmission Engineering Teams
Network Connectivity Carrier-neutral facility with redundant, low-latency fiber paths connecting directly to Phoenix IX, major West Coast peering hubs, and cross-border telecommunication corridors.
Power Infrastructure Dual-fed high-voltage dedicated sub-transmission lines from local utilities (SRP/APS), backed by N+1/2N diesel generator plants with 48-hour fuel reserves and grid-scale energy storage integration options.

Technical Specifications

HeaderDetails
Power Capacity210 MW (Central Phoenix PHX Campus) + 750 MW (Glendale West Valley Campus)
UPS RedundancyHigh-efficiency static 2N / Block Redundant N+1 UPS configurations
Cooling System Ultra-efficient water-free and closed-loop non-evaporative chilled water systems, paired with Direct-to-Chip (DTC) liquid cooling and Rear-Door Heat Exchangers (RDHx) for high-density AI rack configurations (40kW–100kW+ per rack).
Connectivity Multiple diverse underground fiber conduit entry vaults with direct dark fiber feeds to local and regional internet exchange hubs.
PUE Target ~1.15 – 1.20
Energy Mix Integrated Arizona solar power purchase agreements (PPAs), regional clean energy options, and utility grid power.

Milestones

HeaderDetails
Announcement Initial Site: 2019 / Glendale Expansion: 2023–2024
Construction Start Phase 1 Groundbreaking: 2020 / Glendale Groundbreaking: 2024
Phase 1 Go-Live Operational (PHX1/PHX2 DC1–DC3 operational)
Full Buildout 2027–2029 (Multi-building rolling completion across Glendale and Phoenix sites)

Investment Details

HeaderDetails
Total InvestmentEstimated $3,000,000,000 USD to $5,000,000,000+ USD across full multi-campus regional buildout
Funding Blackstone capital backing, QTS corporate debt financing / ABS issuances, and hyperscale anchor tenant lease commitments.