Samsung SDS Chuncheon Data Center: Technical Specs

Status: Operational (Main Campus) / Under Expansion (New AIDC Module)   |   Location: 409-14 Yetgyeongchun-ro, Chiljeon-dong, Chuncheon-si, Gangwon-do 24239, South Korea


Project Overview

The Samsung SDS Chuncheon Data Center is a flagship Software-Defined Data Center (SDDC) developed to support disaster recovery, cloud computing, enterprise IT services, and highly automated digital infrastructure operations in Chuncheon, South Korea. The facility is designed around a software-defined architecture that enables greater flexibility in managing computing, storage, networking, and other critical infrastructure resources, allowing workloads to be efficiently allocated according to changing business and operational requirements. One of the campus’s distinctive architectural features is its rounded Y-shaped building design, which is engineered to take advantage of the surrounding mountain breezes and improve natural airflow around the facility. This approach helps reduce the cooling burden placed on mechanical systems and can contribute to lower overall cooling energy consumption. The facility is also designed with efficiency and operational resilience in mind, supporting mission-critical applications that require reliable availability and disaster recovery capabilities. As demand for artificial intelligence computing continues to grow, the Chuncheon campus is undergoing an expansion to accommodate modular AI Data Center infrastructure on adjacent land. The AIDC development is being pursued in partnership with Samsung C&T and is intended to provide additional capacity for high-density AI and accelerated computing workloads. Modular deployment allows the campus to expand computing infrastructure in stages while adapting capacity to customer demand and evolving technology requirements. The combination of software-defined infrastructure, energy-conscious architectural design, disaster recovery capabilities, and AI-focused expansion positions the Samsung SDS Chuncheon Data Center as an evolving digital infrastructure hub. The development reflects the broader transition of established enterprise data centers toward flexible, automated, and AI-ready facilities capable of supporting increasingly demanding workloads while maintaining operational efficiency and resilience.


Quick Facts

FieldValue
Project NameSamsung SDS Chuncheon Data Center: Technical Specs
Location409-14 Yetgyeongchun-ro, Chiljeon-dong, Chuncheon-si, Gangwon-do 24239, South Korea
StatusOperational (Main Campus) / Under Expansion (New AIDC Module)
CommissioningSeptember 2019 (Phase 1 Operation) / Fall 2027 (AIDC Expansion Pilot Target)
Total IT Load~15 MW Critical IT Load (Initial Campus) + 2.4 MW Modular AI Expansion
Total Capacity37,475 m² Site Area / 18,542 m² Gross Floor Area (GFA)
Tier LevelTier III / Tier IV Equivalent Software-Defined Infrastructure
Project TypeSoftware-Defined Data Center (SDDC), Enterprise Cloud & High-Density AI Infrastructure

City Profile

HeaderDetails
City NameChuncheon
Population~291,000 (October 2025)
Urban Agglomeration~300,000+
City GDPNot separately reported
Per Capita IncomeNot separately reported
City TierTier 2 – Regional Technology, Education & Digital Infrastructure Hub
Key StrengthsTechnology and ICT, higher education, research, biotechnology, tourism, government services, transportation connectivity, and growing digital infrastructure. Chuncheon is also home to Naver's data center GAK Chuncheon, strengthening its position as a Korean data center and technology location. Naver Datacenter Gak Chuncheon

Companies Involved

HeaderDetails
Developer / Operator Samsung SDS
Strategic Infrastructure Partner Samsung C&T, Samsung Electronics, Gangwon State Government, Chuncheon City Municipal Government
Construction Contractor Samsung C&T (Construction & Engineering Division)
MEP Engineering Samsung SDS Thermal Management & Mission-Critical MEP Engineering Teams
Network Connectivity High-speed dedicated dark fiber rings, carrier-neutral network infrastructure, path-diverse underground entry vaults, and direct interconnection with Samsung SDS Dongtan, Suwon, and Sangam facilities.
Power Infrastructure Dual-feed high-voltage utility substation connections, static 2N / N+1 UPS systems, and emergency diesel generator redundancy.

Technical Specifications

HeaderDetails
Power Capacity~25 MVA Total Dedicated Utility Connection
UPS RedundancyConcurrently Maintainable Tier III N+1 / 2N Static UPS Architecture
Cooling System Natural free-air cooling utilizing Chuncheon's cooler climate (1.4°C cooler average), Y-shape building airflow optimization, direct/indirect evaporative cooling, and liquid cooling capability for AI rack modules.
Connectivity Ultra-low latency fiber routes to Seoul Metropolitan Area (Gyeonggi/Gangnam) and regional cloud nodes.
PUE Target 1.20 Design PUE (Certified Green Data Center Platinum Grade)
Energy Mix High-efficiency regional grid power integrated with natural air cooling and modular energy conservation systems.

Milestones

HeaderDetails
Announcement February 2018 (Original Campus) / July 2026 (AIDC Modular Expansion)
Construction Start Late 2018 (Phase 1) / Summer 2026 (AIDC Expansion)
Phase 1 Go-Live September 2019
Full Buildout Fall 2027 (AIDC Modular Pilot Phase Target)

Investment Details

HeaderDetails
Total Investment~$150,000,000 $250,000,000 USD (Cumulative Masterplan Capital Investment)
Funding Corporate Capital Expenditure (Samsung SDS / Samsung C&T)