Project Overview

The Samsung SDS Dongtan Data Center is a specialized high-performance computing facility in South Korea, developed to support computationally intensive workloads such as advanced artificial intelligence model training, large-scale big data analytics, scientific computing, and high-density enterprise research and development applications. Recognized as South Korea’s first data center dedicated exclusively to High-Performance Computing (HPC), the facility represents a significant step in the evolution of enterprise infrastructure toward specialized computing environments capable of handling workloads that demand substantially greater processing capacity than conventional data centers. The facility operates as part of the Samsung Cloud Platform (SCP), providing scalable computing resources and cloud-based infrastructure for organizations requiring advanced processing capabilities. Its architecture is optimized for intensive workloads involving large datasets, complex simulations, AI development, and other accelerated computing applications. A major strength of the Dongtan facility is its integration into a tri-data-center mutual active backup architecture involving Samsung SDS’s Suwon and Sangam data centers. This configuration is designed to enhance service continuity and resilience by distributing critical infrastructure and workloads across multiple locations, reducing dependence on a single facility and strengthening disaster recovery capabilities. The approach enables Samsung SDS to provide reliable computing and cloud services for mission-critical enterprise applications while maintaining operational flexibility. By combining dedicated HPC infrastructure, cloud-based computing capabilities, advanced AI workload support, and geographically distributed redundancy, the Samsung SDS Dongtan Data Center demonstrates the growing importance of purpose-built HPC facilities within modern digital infrastructure. The facility also provides a foundation for supporting increasingly sophisticated AI and data-intensive workloads as enterprises accelerate adoption of advanced computing technologies.


Quick Facts

FieldValue
Project NameSamsung SDS Dongtan Data Center: Technical Specs
Location14 Dongtan-daero 9na-gil, Hwaseong-si, Gyeonggi-do 18488, South Korea
StatusOperational (Primary HPC Cloud Hub)
CommissioningMarch 2023 (Commercial Operation Start)
Total IT Load~40 MW Dedicated Critical IT Power Capacity
Total CapacityMulti-story ultra-high-density campus designed as South Korea's first dedicated HPC facility
Tier LevelTier III / Tier IV Equivalent High-Performance Computing Architecture
Project TypeHigh-Performance Computing (HPC) Dedicated AI Cloud Data Center & R&D Supercomputing Hub

City Profile

HeaderDetails
City NameDongtan
PopulationDongtan is a district of Hwaseong, so a separate official city population is not consistently reported. Hwaseong had 1,037,353 residents including foreign residents in January 2025.
Urban AgglomerationApproximately 26 million, Seoul Capital Area
City GDPNot separately reported for Dongtan
Per Capita IncomeNot separately reported for Dongtan
City TierTier 1, Major Semiconductor, Technology and Digital Infrastructure Hub
Key StrengthsSemiconductors, electronics, advanced manufacturing, technology R&D, skilled workforce, smart city infrastructure, transport connectivity, and data centers

Companies Involved

HeaderDetails
Developer / Operator Samsung SDS
Strategic Infrastructure Partner Samsung Electronics, Samsung C&T, KEPCO, Hwaseong City Municipal Government
Construction Contractor Samsung C&T (Engineering & Construction Group)
MEP Engineering Samsung SDS Mission-Critical Thermal Engineering & SCP Infrastructure Teams
Network Connectivity Dedicated high-speed dark fiber trunks connecting Dongtan directly to Suwon, Sangam, and Chuncheon facilities, featuring path-diverse subterranean fiber vaults and 99.999% SLA network redundancy.
Power Infrastructure Dual high-voltage 154 kV grid connections, high-efficiency static 2N / N+1 UPS systems, automated switchgear, and emergency diesel generators.

Technical Specifications

HeaderDetails
Power Capacity~50 MVA Total Dedicated Utility Substation Capacity
UPS RedundancyConcurrently Maintainable Tier III / Tier IV 2N Static UPS Architecture
Cooling System Direct Liquid Cooling (DLC) infrastructure, rear-door heat exchangers (RDHx), dry coolers, and waste-heat recovery systems engineered for high-density GPU racks.
Connectivity Sub-millisecond fiber routes to Samsung Electronics R&D centers in Suwon, Giheung, and Hwaseong semiconductor complexes.
PUE Target < 1.13 Annualized Design PUE (1.23 Operational Design)
Energy Mix High-efficiency regional grid power supplemented by corporate renewable energy purchase programs and waste heat reutilization loops.

Milestones

HeaderDetails
Announcement March 2021
Construction Start Late 2021
Phase 1 Go-Live March 2023
Full Buildout Operational with Phased High-Density Expansion Modules

Investment Details

HeaderDetails
Total Investment~$300,000,000 – $400,000,000 USD (Estimated Facility Investment)
Funding Corporate Capital Expenditure (Samsung SDS)