Status: Proposed / Public Exhibition & Planning Assessment Phase (SSD-82211208) | Location: 78 Lockwood Road, Erskine Park, NSW 2759, Australia
The STACK Infrastructure 78 Lockwood Road Data Centre, designated as STACK SYD01, is a large-scale hyperscale data center campus proposed by STACK Infrastructure in Erskine Park, within the City of Penrith in Western Sydney, New South Wales 2759, Australia. Situated on a 7.72-hectare industrial parcel within the Fitzpatrick Industrial Estate at 78 Lockwood Road, the development occupies a strategic position within Western Sydney’s established data center infrastructure corridor, where it sits alongside major digital infrastructure facilities operated by companies including Digital Realty, Metronode, and Equinix. Classified as a State Significant Development under application SSD-82211208 within the New South Wales planning framework, the project is master-planned as a multi-building, multi-story campus with an operational capacity of up to 450.0 MW of total IT load capacity. The scale of STACK SYD01 is intended to support hyperscale cloud platforms, enterprise colocation, artificial intelligence infrastructure, high-performance computing, and other data-intensive workloads requiring substantial and resilient computing capacity. Representing an AU$3.7 billion development, the campus is engineered around Tier III-equivalent high-availability principles, incorporating redundant electrical and mechanical systems designed to support continuous operations and facilitate maintenance activities. An on-site high-voltage transmission substation is planned to provide the substantial electrical infrastructure required by the development, while 2N and block-redundant static UPS systems provide additional resilience for critical IT loads. Standby diesel generation infrastructure, with provision for up to 188 generator units, is designed to provide emergency backup during utility interruptions and other electrical contingencies. The cooling architecture combines advanced closed-loop precision cooling with liquid-to-chip cooling readiness, enabling the facility to accommodate the elevated rack densities and thermal requirements associated with AI clusters, GPU-accelerated computing, and next-generation hyperscale workloads. Dual carrier-neutral fiber routes are planned to connect the campus with Sydney’s major network exchanges, providing diverse connectivity options for cloud providers, telecommunications operators, enterprises, and digital service platforms. With its substantial planned IT capacity, dedicated high-voltage infrastructure, resilient electrical architecture, advanced cooling capabilities, and extensive fiber connectivity, STACK SYD01 is positioned to become a significant component of Western Sydney’s expanding hyperscale, cloud, and AI data center ecosystem.
| Field | Value |
|---|---|
| Project Name | STACK SYD01 78 Lockwood Road Erskine Park 450MW Hyperscale Data Centre |
| Location | 78 Lockwood Road, Erskine Park, NSW 2759, Australia |
| Status | Proposed / Public Exhibition & Planning Assessment Phase (SSD-82211208) |
| Project Type | Purpose-Built Hyperscale Cloud, High-Density AI Supercomputing & Wholesale Colocation Hub |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Sydney |
| Population | 5.3 million |
| Urban Agglomeration | 5.6 million |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.