Status: Under Construction / Planned Hyperscale & AI Campus | Location: 1830 Jarvis Ave, Elk Grove Village, IL 60007, USA
STACK Infrastructure CHI02 is a 263,620 gross sq ft purpose-built hyperscale data center facility located on an 18-acre site at 1830 Jarvis Avenue in Elk Grove Village, Illinois, less than a mile from STACK’s existing CHI01 campus. The two-story facility delivers 36.0 MW of critical IT capacity and is engineered to support high-density cloud computing, machine learning, AI, and other power-intensive workloads. Direct power supply from a local ComEd substation provides the electrical infrastructure required for the facility’s substantial critical IT capacity and high-density deployments. CHI02 incorporates N+1 block-redundant electrical infrastructure, providing additional capacity for critical power systems and supporting operational resilience during maintenance or equipment events. Its zero-water closed-loop cooling loops are designed to manage heat without relying on ongoing water consumption for the cooling process, reducing the facility’s dependence on water resources while supporting high-density compute environments. The facility also incorporates dual subterranean Meet-Me-Rooms, providing diverse physical entry points for telecommunications networks and supporting carrier-neutral connectivity. Low-latency dark fiber connections to Chicago’s core network exchanges further link CHI02 with the region’s broader carrier and interconnection ecosystem, supporting cloud services, enterprise applications, AI workloads, and high-volume data exchange. Its proximity to STACK’s CHI01 campus creates a closely located infrastructure footprint within the established Elk Grove Village data center market, while the 18-acre site provides room for a substantial purpose-built deployment. By combining 36 MW of critical IT capacity, direct ComEd power, redundant electrical infrastructure, zero-water cooling, diverse network entry points, and dark fiber connectivity, STACK Infrastructure CHI02 provides a scalable platform for hyperscale cloud, machine learning, AI, and other high-density computing requirements.
| Field | Value |
|---|---|
| Project Name | STACK Infrastructure CHI02 1830 Jarvis Ave Elk Grove Village Illinois |
| Location | 1830 Jarvis Ave, Elk Grove Village, IL 60007, USA |
| Status | Under Construction / Planned Hyperscale & AI Campus |
| Project Type | Greenfield Hyperscale, AI Compute & High-Density Enterprise Colocation |
| Commissioning | 🔒 Subscriber Intelligence |
| Total IT Load | 🔒 Subscriber Intelligence |
| Total Capacity | 🔒 Subscriber Intelligence |
| Tier Level | 🔒 Subscriber Intelligence |
| Header | Details |
|---|---|
| City Name | Chicago |
| Population | ~2.7 million |
| Urban Agglomeration | ~9.4 million (Chicago Metropolitan Area) |
| Economic Profile | 🔒 Detailed city intelligence available to subscribers |
Developer, operator, infrastructure partners, contractors and engineering.
Power capacity, redundancy, cooling, connectivity, PUE and energy mix.
Announcement, construction start, go-live and full buildout.
Total project investment and funding intelligence.
Subscribe to our exclusive newsletter and get the latest insights on data center trends, market forecasts, and infrastructure innovations delivered straight to your inbox.