Vantage Lighthouse: $15B 1GW Stargate AI Campus WI

Status: Under Construction (Vertical Phase)   |   Location: 1 mile inland from Lake Michigan, Port Washington


Project Overview

Vantage Port Washington, codenamed Project Lighthouse, is a massive $15 billion AI campus serving as a primary Midwest hub for the OpenAI and Oracle "Stargate" expansion. Officially breaking ground on December 18, 2025, the project is one of the most significant infrastructure builds in Wisconsin's history. The 672-acre campus is designed to house nearly 1 gigawatt of AI compute capacity, specifically optimized for next-generation Large Language Model (LLM) training.

The "Lighthouse" design focuses on extreme density and resource preservation. It features a closed-loop liquid cooling system that targets near-zero Water Utilization Efficiency (WUE), protecting the nearby Lake Michigan ecosystem. To meet its massive power demand, Vantage and We Energies are adding nearly 2 GW of new zero-emission energy to the grid (solar, wind, and battery storage), with 70% dedicated to the campus and 30% provided to the local community. The project also includes $175 million in local infrastructure upgrades, including a new water tower and sewer interceptors.


Quick Facts

FieldValue
Project NameVantage Lighthouse: $15B 1GW Stargate AI Campus WI
Location1 mile inland from Lake Michigan, Port Washington
StatusUnder Construction (Vertical Phase)
CommissioningPhase 1: 2027; Full Buildout: 2028
Total IT Load902 MW (Targeting ~1.3 GW by late 2027)
Total Capacity2.5 Million Sq. Ft. (4 Data Centers)
Tier LevelTier III+ (AI-Optimized)
Project TypeHyperscale AI Training Center (Stargate Expansion)

City Profile

HeaderDetails
City NamePort Washington, WI
Population~12,500 (Small town with global scale infrastructure)
Urban AgglomerationMilwaukee-Waukesha-West Allis Metro Area
City GDPEstimated $2.7 Billion contribution to regional GDP
Per Capita Income~$67k
City TierTier 3 (Emerging High-Tech/AI Hub)
Key StrengthsNear-zero water waste cooling, stable grid, union labor.

Companies Involved

HeaderDetails
Developer / Operator VIRTUS Data Centers
Strategic Infrastructure Partner OpenAI / Oracle
Construction Contractor Whiting-Turner / Turner / McCarthy / Michels (JV)
MEP Engineering NA
Network Connectivity Multiple diverse fiber pathways (Dark & Lit)
Power Infrastructure We Energies (WEC Energy Group)

Technical Specifications

HeaderDetails
Power Capacity902 MW IT Load (1.3 GW Total Site Capacity)
UPS Redundancy$N+1$ across all electrical systems
Cooling System Liquid-to-Liquid Closed-Loop (Near-Zero Water Waste)
Connectivity One Point-of-Entry (POE) per building; 2+ paths per carrier
PUE Target 1.10–1.12
Energy Mix 70% New Zero-Emission On-site/Matched; 100% Annual Match

Milestones

HeaderDetails
Announcement May 2025
Construction Start December 9, 2025
Phase 1 Go-Live 2027
Full Buildout NA

Investment Details

HeaderDetails
Total Investment$15 Billion
Funding Vantage / DigitalBridge / Silver Lake