YCO Malvar One Data Center Batangas: Tier III Dual-Certified Cloud Hub in Philippines

Status: Operational / Active Hyperscale Facility   |   Location: 1816B Angel Linao St, Paco, Manila, Metro Manila, Philippines


Project Overview

YCO Malvar One is a flagship hyperscale data center designed to deliver 12 MW of IT load capacity and strategically located on a 75 MW power-capable campus within the Light Industry & Science Park IV (LISP IV) in Malvar, Batangas, Philippines. Developed to support the country's rapidly expanding digital economy, the facility is purpose-built for hyperscale cloud deployments, enterprise colocation, artificial intelligence (AI) workloads, disaster recovery, and mission-critical business applications. Distinguished as the first dual-certified data center in the Philippines to achieve both TIA-942 Rated 3 and ISO 22237 certifications, Malvar One is engineered to meet internationally recognized standards for reliability, resilience, availability, and operational excellence. Positioned approximately 60 kilometers south of Metro Manila, the campus is intentionally located outside major flood-prone areas, congested urban zones, and commercial flight paths, providing enhanced business continuity and reduced environmental risk. The facility offers direct access to key regional fiber routes and multiple subsea cable landing stations, enabling low-latency connectivity to domestic and international networks while supporting carrier-neutral interconnection for cloud providers, telecommunications operators, and enterprise customers. Designed with scalable electrical and mechanical infrastructure, the campus accommodates high-density server deployments, redundant power distribution systems, energy-efficient cooling technologies, advanced fire detection and suppression systems, and multi-layer physical security with continuous monitoring. Its large power reserve allows for future expansion to meet increasing demand for digital infrastructure across Southeast Asia. Combining strategic geographic positioning, international certifications, resilient infrastructure, and robust network connectivity, YCO Malvar One serves as a critical edge computing, disaster recovery, and hyperscale colocation hub, providing secure, scalable, and future-ready digital infrastructure for organizations operating throughout the Philippines and the wider Asia-Pacific region.


Quick Facts

FieldValue
Project NameYCO Malvar One Data Center Batangas: Tier III Dual-Certified Cloud Hub in Philippines
Location1816B Angel Linao St, Paco, Manila, Metro Manila, Philippines
StatusOperational / Active Hyperscale Facility
CommissioningOperational (Commissioned 2023–2024)
Total IT Load12.0 MW Critical IT Power Capacity (30.0 MW Energized Utility Power Allocation)
Total Capacity5,392 m² (~58,039 sq ft) net technical whitespace
Tier LevelDual-Certified: ANSI/TIA-942 Rated 3 & ISO 22237 (Availability 3 / Protection 3)
Project TypePurpose-Built Master-Planned Hyperscale, Enterprise Colocation & Cloud Data Center

City Profile

HeaderDetails
City NameMalvar
Population~74,600 (2024 estimate)
Urban AgglomerationMetro Manila (~68 km north)
City GDPUSD 18+ billion
Per Capita Income~USD 5,000 (estimated)
City TierTier 2 – Emerging Industrial & Digital Infrastructure Hub
Key StrengthsStrategic location in Batangas' Northern Industrial Corridor; home to the LIMA Estate industrial and technology park; proximity to Metro Manila; access to the STAR Tollway; expanding fiber connectivity; reliable power infrastructure; growing manufacturing, logistics, cloud, and data center investments; attractive site for hyperscale and enterprise digital infrastructure.

Companies Involved

HeaderDetails
Developer / Operator YCO Cloud
Strategic Infrastructure Partner Meralco (Manila Electric Company) Utility Grid Network & SPPI (Science Park of the Philippines)
Construction Contractor Specialized Asian Mission-Critical EPC & General Contractors
MEP Engineering YCO Technical Infrastructure Teams & Master-Planned by Sasaki & Associates
Network Connectivity Carrier-neutral architecture, multiple path-diverse subterranean fiber entrance vaults, dedicated Meet-Me-Rooms (MMRs), direct interconnects to all major domestic telcos (PLDT, Globe, Converge), and proximity to the Nasugbu Submarine Cable Landing Station (CLS).
Power Infrastructure Dual high-voltage grid utility feeds from Meralco LISP IV substation, static 2N / N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt standby emergency diesel generator arrays with on-site fuel autonomy.

Technical Specifications

HeaderDetails
Power Capacity75.0 MW Total Campus Available Utility Power Capacity (30.0 MW Energized)
UPS Redundancy2N / N+1 Static UPS Architecture
Cooling System High-efficiency air-cooled chillers with variable speed drives, hot/cold aisle containment, smart BMS controls, and Direct Liquid Cooling (DLC) readiness for high-density compute racks.
Connectivity High-speed fiber backhaul connecting Batangas directly to Metro Manila CBDs (Makati, BGC) via SLEX/STAR Tollway fiber corridors and international subsea cable gateways.
PUE Target < 1.30 Annualized Operational Design PUE
Energy Mix Utility power grid supply integrated with renewable energy procurement strategies.

Milestones

HeaderDetails
Announcement 2021–2022
Construction Start 2022
Phase 1 Go-Live Operational
Full Buildout Active Multi-Building Expansion Capability

Investment Details

HeaderDetails
Total InvestmentEstimated $50,000,000 USD to $80,000,000 USD Capital Investment
Funding Joint Venture Private Infrastructure Equity (YCO Cloud / Capital Partners)