Zone Frontier Infrastructure

Zone Frontier Inc., formerly CleanCore Solutions Inc., develops data center campuses providing land, power, and infrastructure for AI and high performance computing workloads. Its portfolio includes a West Texas campus being developed with HST Technologies, with an initial 200 MW power target and potential expansion beyond 500 MW. In Minnesota, Zone Frontier is developing a campus with at least 55 MW of utility power capacity and 40 MW of critical IT load, with Cerebras Systems as the tenant. The company secured a long term lease covering approximately 4,077 acres in Potter County, Texas, including areas for data centers, solar generation, and battery storage.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Digital Realty LAX10 Los Angeles Carrier Hotel 600 West 7th Street, Los Angeles, California 90017, USA Operational Operational Z25.0 MW Critical IT Load (40.0 MW Gross Building Utility Power Allocation)
Pecem Data Center Campus Ceara Port Complex (CIPP), São Gonçalo do Amarante, Ceará 62670-000, Brazil 2031 Under Construction 1000.0 MW Combined Gross Utility Allocation (800.0 MW Total Critical IT Capacity)
Zone Frontier 500 MW Minnesota AI Data Center Campus USA Becker Industrial Corridor, Minnesota, USA Q4 2029 Announced / Under Development 500 MW
Zone Frontier 500 MW Potter County AI Data Center Campus Texas Potter County (Adjacent to 345kV Substation), Texas Panhandle, USA Q4 2029 Announced / Under Development 500 MW