Iron Mountain AMS-1 Data Center Campus Expansion |
J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-acre campus) |
Q2 2027 (+10 MW Expansion Go-Live) / 2028–2030 (Full 43.1 MW Campus Target) |
Operational / Active Multi-Phase Campus Expansion |
43.1 MW Total Utility Capacity (13.1 MW Active / +10 MW Phase 2 / +20 MW Phase 3) |
|
|
Texas: $101B Project Kestrel 9GW Giga-Scale AI Factory Campus |
Multi-Thousand Acre Greenfield Site, Sweetwater, Texas |
2036+ (Long-term modular scaling across multi-year asset tranches) |
Pre-Construction / Substation Engineering & ERCOT Large-Load Review Phase |
9,000 MW (9 GW) maximum master-planned grid capacity allocation (~7,200 MW critical compute IT load) |
|
|
Sweetwater AI Factory: Nvidia & IREN's 5GW Texas DSX Mega-Campus |
Sweetwater, Nolan County, Texas, United States |
2032 - Q4 |
Active / Structural Civil Engineering & Substation Expansion (Tracking June 2026) |
Initial 1.4 GW operational cluster block scaling systematically into a long-term 5.0 GW total site utility envelope |
|