IREN Wagga Wagga Data Center Campus |
301 Boiling Down Road, Rowan, Wagga Wagga, New South Wales 2650, Australia |
2033 |
In Planning |
900.0 MW Critical IT Load (1,200.0 MW Gross Power Allocation Master Plan) |
|
|
IREN Cáceres Data Center Campus 70MW Extremadura Spain |
Polígono Industrial Las Capellanías, 10005 Cáceres, Extremadura, Spain (Part of the CCGreen Eco-Industrial Master Plan) |
2030 |
Pre-Development & Site Permitting Phase (Acquired via Ingenostrum transaction in June 2026) |
100.0 MW Gross Utility Power Allocation |
|
|
IREN Zamudio Data Center 30MW Bilbao Bizkaia Spain |
Polígono Industrial de Pinto / Biscay Science & Technology Park, 48170 Zamudio, Bizkaia, Spain |
Q4 2029 |
Permitted / Pre-Construction Stage |
30.0 MW Initial Grid Allocation (10 MW Phase 1 Buildout) |
|
|
IREN Bundey Data Center Campus South Australia: 800MW AI Compute Specs |
Sutherlands Road & Powerline Road, Bundey, SA 5374, Australia |
Multi-Phase 800 MW Master Campus Rollout |
Planned / Under Development |
Up to 800 MW Dedicated Utility Substation Capacity Allocation |
|
|
Iron Mountain AMS-1 Data Center Campus Expansion |
J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-acre campus) |
Q2 2027 (+10 MW Expansion Go-Live) / 2028–2030 (Full 43.1 MW Campus Target) |
Operational / Active Multi-Phase Campus Expansion |
43.1 MW Total Utility Capacity (13.1 MW Active / +10 MW Phase 2 / +20 MW Phase 3) |
|
|
Texas: $101B Project Kestrel 9GW Giga-Scale AI Factory Campus |
Multi-Thousand Acre Greenfield Site, Sweetwater, Texas |
2036+ (Long-term modular scaling across multi-year asset tranches) |
Pre-Construction / Substation Engineering & ERCOT Large-Load Review Phase |
9,000 MW (9 GW) maximum master-planned grid capacity allocation (~7,200 MW critical compute IT load) |
|
|
Sweetwater AI Factory: Nvidia & IREN's 5GW Texas DSX Mega-Campus |
Sweetwater, Nolan County, Texas, United States |
2032 - Q4 |
Active / Structural Civil Engineering & Substation Expansion (Tracking June 2026) |
Initial 1.4 GW operational cluster block scaling systematically into a long-term 5.0 GW total site utility envelope |
|