Kasi Cloud LOS1: 100MW Sovereign AI & Hyperscale Campus |
4 Edward Hotonu Street, Lekki Peninsula |
Post-May 2026 Phased Execution |
Live / Operational (Commissioned May 16, 2026) |
100 MW Ultimate Campus Power Envelope (8MW Critical Load per Floor) |
|
|
OADC Lagos Flagship Campus: 26MW Hyperscale & Subsea Gateway |
Elegushi Royal Beach Road / Yemi Adetayo Street, Lekki Peninsula II, Lagos 105102, Nigeria |
Operational / Phased Whitespace & High-Density Expansion Active |
Operational / Active Multi-Phase Hyperscale Expansion |
20 MW Critical IT Power Capacity / 26 MW Total Site Substation Load |
|
|
Rack Centre Lagos AI Data Center Campus: West Africa's 13.5MW Hub |
Plot 18 Jagal Cl, Jagal Road, Oregun, Lagos 101233, Lagos, Nigeria |
Active Multi-Building Hyperscale Expansion |
Active Expansion / Under Development |
~25 MVA Total Utility & On-Site Generation Capacity Allocation |
|
|
Africa Data Centres JHB3 Campus: 40MW AI-Ready Facility in South Africa |
17 Waterloo Road, Samrand Business Park, Centurion 0187, Johannesburg, South Africa |
Active Multi-Phase Development (Targeting 40 MW Total) |
Active Development / Phased Hyperscale Expansion |
40 MW Secured Utility Power Allocation |
|
|
Nigeria Data Centre 1 NDC1 10MW Lagos Data Center Nigeria |
Lagos Metropolitan Corridor, Lagos, Lagos State, Nigeria |
Q4 2028 |
Active Development / Engineering & Phase 1 Planning |
14.0 MW Total Utility Power Allocation |
|
|
eThekwini Data Center 400MW Kingsburgh Durban South Africa |
Ocean View Road / Mouth of Lovu River, Kingsburgh, Durban, KwaZulu-Natal, 4126, South Africa |
Q4 2030 |
Announced / Feasibility Stage |
400.0 MW Total Megawatt Grid Allocation |
|
|
Tetracore Atakobo Ogbere Tier III Data Center Nigeria |
Atakobo Industrial Park, Sagamu-Ore Expressway, Ogbere, Ogun State, Nigeria |
Q4 2029 |
Planned / Permitted |
~100.0 MW On-Site Independent Gas Power Generation |
|
|
MTN Newlands Data Centre 5MW Johannesburg Facility |
33 Brown Rd, Newlands, Johannesburg, 2092, South Africa |
Q4 2018 |
Operational |
5.0 MW Gross Power Supply |
|
|
BCX Crown Mines Data Centre 10MW Johannesburg |
2 Press Ave, Crown Mines, Johannesburg, Gauteng, 2092, South Africa |
Q4 2015 |
Operational |
10.0 MW Gross Utility Power Allocation |
|
|
MTN Doornfontein Data Centre 6MW Johannesburg |
31 Height St, Doornfontein, Johannesburg, 2028, South Africa |
Q3 2017 |
Operational |
6.0 MW Gross Power Supply |
|
|
OADC Parklands Data Centre 5MW Johannesburg |
17 Walters St, Rosebank, Johannesburg, 2196, South Africa |
Q4 2025 |
Operational |
5.0 MW Gross Power Supply |
|
|
Internet Solutions Johannesburg 4MW NTT DATA Facility |
158 Jan Smuts Avenue, Rosebank, Johannesburg, 2196, South Africa |
Q4 2014 |
Operational |
4.0 MW Gross Utility Power Allocation |
|
|
Imagine IPS Data Center 1MW Rosebank Johannesburg |
158 Jan Smuts Ave, Rosebank, Johannesburg, Gauteng, 2121, South Africa |
Q2 2011 |
Operational |
1.0 MW Gross Utility Power Supply |
|
|
Vox DataPro Johannesburg Data Centre 3MW Waverley |
Block D, Rutherford Estate, 1 Scott Street, Waverley, Johannesburg, 2090, South Africa |
Q3 2012 |
Operational |
3.0 MW Gross Power Allocation |
|
|
MTN Randburg Switch Data Centre 5MW Johannesburg |
Jan Smuts Ave & Selkirk Ave, Randburg, Johannesburg, 2194, South Africa |
Q4 2013 |
Operational |
5.0 MW Gross Utility Power Supply |
|
|
NexAxis Randview Datacentre 32MW Johannesburg |
1 Avon Rd, Randview Business Park, Ferndale Ext. 9, Randburg, 2194/2191, South Africa |
Q2 2026 |
Under Construction / DevelopmentA |
32.0 MW Gross Utility Power Allocation |
|
|
Telemedia Rivonia Teleport 2MW Johannesburg Facility |
17 9th Ave, Rivonia, Johannesburg, Gauteng, 2128, South Africa |
Q3 1985 |
Operational |
2.0 MW Gross Utility Power Allocation |
|
|
Equinix Cape Town Campus Data Center 170MW South Africa |
King Air Industria, Pallotti Road, Matroosfontein, Cape Town 7490, South Africa |
2031 Target |
Approved / Permitted (Site Preparation & Pre-Construction) |
170.0 MW Gross Utility Power Allocation |
|