Lumen Manchester 1 Data Center California |
19700 State Hwy 1 (Shoreline Hwy), Manchester, CA 95459, United States |
Q1 2020 |
Operational |
1.0 MW IT Power (1.5 MW Total Utility Power Capacity) |
|
|
Lumen Minnetonka 2 Data Center 5480 Feltl Rd Minnesota |
5480 Feltl Rd, Minnetonka, MN 55343, USA |
Q2 2014 |
Operational |
5.0 MW Total Facility Power / 3.0 MW Critical IT Load |
|
|
Lumen Minnetonka 1 Data Center 5500 Feltl Rd Minnesota |
5500 Feltl Rd, Minnetonka, MN 55343, USA |
Q2 2011 |
Operational |
6.5 MW Total Facility Power / 4.0 MW Critical IT Load |
|
|
Lumen Minneapolis 1 Data Center 222 S 9th Street Minnesota |
222 S 9th Street, Minneapolis, MN 55402, USA |
Q2 2012 |
Operational |
5.5 MW Total Utility Power Capacity / 3.5 MW Critical IT Load |
|
|
Lumen St. Louis 1 Data Center: 1MW Enterprise Colocation Hub 1015 Locust MO |
1015 Locust Street, St. Louis, MO 63101, Missouri, United States |
Fully Operational Active Facility |
Fully Operational Enterprise Colocation & Fiber Gateway |
2.5 MVA Primary Utility Grid Supply Allocation |
|
|
Lumen Lumen Portland 2 1.0MW Portland Oregon Edge Colocation Central Office Data Center |
707 SW Washington Avenue, Portland, OR 97205, USA |
4,663 sq. ft. total facility featuring 1,321 sq. ft. raised floor white space for custom server cabinets and cages |
Operational / Edge Colocation Node |
1.0 MW Utility Supply |
|
|
Lumen Richmond 1 Data Center Park Central Drive Henrico County Virginia |
8851 Park Central Dr, Suite B, Richmond, VA 23227, United States |
Operational Phase |
Operational / Active Colocation & Edge Facility |
2.0 MW Gross Power Allocation / 1.5 MW Critical IT Load |
|
|
Lumen Richmond 2 Data Center Staples Mill Road Henrico County Virginia |
8145 Staples Mill Road, Richmond, VA 23228, United States |
Operational Phase |
Operational / Active Colocation & Network Gateway Facility |
2.2 MW Gross Power Allocation / 1.8 MW Critical IT Load |
|
|
Lumen Miami 4 Data Center 50 NE 9th St 6th Floor Miami Florida Lumen Technologies |
50 NE 9th St, 6th Floor, Miami, FL 33132, United States |
Q2 2012 |
Operational |
5.0 MW Gross Utility Power Capacity |
|
|
Lumen San Antonio 2 Data Center 1203 N Frio Street |
1203 N. Frio Street, San Antonio, TX 78207, USA |
Q2 2012 |
Operational |
5 MW Gross Utility Power Capacity |
|
|
Lumen San Antonio 1 Data Center 5130 Service Center Drive |
5130 Service Center Drive, San Antonio, TX 78218, USA |
Q4 2010 |
Operational |
6 MW Gross Utility Power Capacity |
|
|
Lumen Austin 1 Data Center 4207 Smith School Rd |
4207 Smith School Road, Austin, TX 78744, USA |
Q2 2011 |
Operational |
5 MW Gross Utility Power Capacity |
|
|
Lumen Miami 1 Data Center 5MW Colocation |
100 Biscayne Blvd, Downtown Miami, FL 33132, USA |
Operational |
Operational |
5 MW Total Power Capacity |
|
|
Lumen Miami 5 Data Center 3MW Colocation |
1109 NW 22nd St, Miami, FL 33127, USA |
Operational |
Operational |
3 MW Total Power Capacity |
|
|
Lumen Melbourne 1 Data Center 2MW Colocation |
1110 Line Street, Melbourne, FL 32901, USA |
Q4 2012 |
Operational |
2 MW Total Utility Power Capacity |
|
|
Lumen Salt Lake City 2 Data Center 5035 Harold Gatty Dr Utah Specs |
5035 Harold Gatty Drive, Salt Lake City, UT 84116, Utah, United States |
Active Commercial Edge & Colocation Facility |
Operational |
~7.5 MW Substation Utility Allocation (Supports 3kW standard cabinets, 5kW high-density cabinets, and 3kW–15kW custom cage deployments) |
|