Ascenty Vinhedo Campus Infrastructure |
Vinhedo (Near Campinas/Greater São Paulo), Brazil |
Total of 5 data centers, reaching 114 MW capacity. |
Operational (Phase 1 & 2) / Under Expansion (Phase 3+) |
V1: 27 MW; V2: 34 MW. V3-V5 Expansion: +44 MW (Total 114 MW) |
|
|
Rio de Janeiro AI City Data Center Campus |
Rio de Janeiro, Brazil |
Projected by 2032 (for 3.2 GW capacity) |
Announced/In Development |
1.8 GW (Initial IT Load) |
|
|
Scala Data Centers Tamboré | High-Performance AI-Ready Colocation Campus |
Tamboré, Barueri (Greater São Paulo), Brazil |
Expected by late 2020s |
Under Construction / Active Expansion (Multi-Phase) |
200+ MW (Planned total site capacity) |
|
|
Scala AI City Campus | Next-Generation AI Infrastructure & Cloud Hub |
Eldorado do Sul, Rio Grande do Sul, Brazil |
Phased development over 20 years |
Announced / Initial Development Phase |
5 GW Total Authorized Power Input |
|
|
Equinix SP7 IBX São Paulo | AI-Ready $110M Digital Infrastructure Expansion |
-23.589496 |
2027 |
Under Construction / Active Fit-out (April 2026) |
20.0 MW |
|
|
Elea BEL1: First 100MW Amazon AI Data Center Brazil |
Belém, Pará State |
2031 |
Announced / Permitting & Initial Site Prep |
100 MW total planned capacity |
|
|
Brazil: ByteDance $38.4B São Paulo Clean Energy Hyperscale Compute Hub |
Industrial Tech Corridor, Greater São Paulo Metropolitan Area |
Scheduled multi-phase rollouts expanding through 2033 to reach complete capacity limits |
Groundbreaking Complete; Civil Site Excavation and Structural Works Active |
1,000 MW ultimate site capacity (~850 MW usable net IT load) |
|
|
Equinix SP6 São Paulo: 20MW Flagship Brazil IBX Data Center |
Equinix Corporate Campus, Santana de Parnaíba, São Paulo Metropolitan Region, Brazil |
Late 2027 (Phased expansion across all upper-level server halls) |
Operational / Phase 1 Live |
20 MW gross utility substation capacity |
|