EdgeCore Louisa Campus Shannon Hill Regional Business Park Kents Store Virginia |
Shannon Hill Regional Business Park, Off I-64 / Route 250, Kents Store, VA 23084, United States |
Phased Multi-Year Development across 6 Buildings |
Under Development / Announced Gigascale Campus |
1.1+ GW Critical IT Power / ~1.3 GW Total Utility Power |
|
|
EdgeCore PHX04 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona |
EdgeCore 3856 S Everton Terrace 85212 Mesa Arizona, USA |
Active Multi-Phase Development |
Active Development / Phased Buildout |
100 MW Secured Utility Power Allocation (PHX04 Building Allocation) |
|
|
EdgeCore PH05 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona |
3856 S Everton Terrace, Mesa, AZ 85212, USA |
Active Multi-Phase Development |
Active Development / Phased Buildout |
100 MW Secured Utility Power Allocation (PH05 Building Allocation) |
|
|
EdgeCore PH03 Data Center: 72MW High-Density AI & Hyperscale Hub in Mesa, Arizona |
3856 S Everton Terrace, Mesa, AZ 85212, United States |
Operational Active Facility |
Fully Operational Hub |
72 MW Secured Utility Power Allocation |
|
|
EdgeCore DFW02 Dallas Hyperscale Campus: 216MW AI-Ready Data Center |
Mesquite, Dallas County, Texas 75149, United States |
Active Multi-Building Campus Expansion |
Under Construction / Active Phase 1 Development |
216 MW Secured Utility Power Allocation |
|
|
Mesa North 450MW AI Data Center EdgeCore Mesa AZ |
Elliot Tech CorridoR, Mesa, Arizona |
2028 |
Operating / Expanding (Revised Site Plan submitted March 2026) |
450 MW (Full Build-out) |
|
|
EdgeCore Dulles Hyperscale Project Virginia Funding $1.5B |
Dulles Technology Corridor, Sterling |
Comprehensive execution and twin-facility occupancy scheduled by late 2028 |
Active Construction Underway |
160 MW gross footprint capacity delivered via specialized heavy utility interconnections |
|