STACK Infrastructure CHI01 Campus 1301 1441 Touhy Ave Elk Grove Village Illinois |
1301 Touhy Ave / 1441 Touhy Ave, Elk Grove Village, IL 60007, USA |
Q4 2022 |
Operational / Active Hyperscale & High-Density Enterprise Campus |
40.0 MW Contracted Utility Interconnect |
|
|
STACK Infrastructure CHI02 1830 Jarvis Ave Elk Grove Village Illinois |
1830 Jarvis Ave, Elk Grove Village, IL 60007, USA |
Q4 2028 |
Under Construction / Planned Hyperscale & AI Campus |
36.0 MW Contracted Utility Interconnect |
|
|
STACK SYD01 78 Lockwood Road Erskine Park 450MW Hyperscale Data Centre |
78 Lockwood Road, Erskine Park, NSW 2759, Australia |
Strategic Western Sydney hyperscale cloud ecosystem & generative AI compute hub |
Proposed / Public Exhibition & Planning Assessment Phase (SSD-82211208) |
Dedicated High-Voltage Utility Substation Allocation |
|
|
POR03 Campus 200MW Hillsboro Oregon STACK Infrastructure Hyperscale AI Data Center |
4735 NE Starr Blvd, Hillsboro, OR 97124, USA |
1,600,000 sq. ft. across 6 multi-story buildings on a 55-acre master-planned campus |
Operational / Active Multi-Building Expansion (POR03A–POR03D Operational/Phased) |
200.0 MW Allocated Utility Grid Power Supply |
|
|
STACK Infrastructure POR02A Data Center |
8135 NE Evergreen Pkwy, Hillsboro, OR 97124, USA |
240,000 sq. ft. purpose-built facility supporting high-density server rack environments |
Operational / Active Hyperscale Campus Facility |
30.0 MVA Dedicated Substation Utility Allocation |
|
|
STACK Tokyo TKY01 AI Hyperscale Data Center Campus – 36 MW |
STACK INFRASTRUCTURE 1 Chome-2 Hara 270-1335 Inzai |
2026 (36 MW / TKY01B) |
Phase 1 Operational / Phase 2 Under Construction |
36 MW total site power allocation |
|
|
STACK Tokyo TKY01B Hyperscale AI Data Center – 18 MW Capacity |
1 Chome-2 Hara, Inzai, Chiba 270-1335, Japan |
Q4 2027 (TKY01B Go-Live, 36 MW Total Campus) |
Under Construction / Groundbroken |
18 MW allocated critical power load |
|
|
STACK Infrastructure STO01 Stockholm Sovereign Data Center – 30 MW |
Smedbyvägen 6, 194 30 Upplands Väsby, Stockholm, Sweden |
2024 / 2025 (Complete 30 MW active across STO01A and STO01B) |
Fully Operational (STO01A) / Expansion Active (STO01B) |
35+ MVA dedicated grid transformation capacity |
|
|
STACK Infrastructure MIL02A Milan Data Center: 5.6MW Colocation Hub |
Via Marche 9, 27010 Siziano (PV), Lombardy, Italy |
Operational Active Building |
Fully Operational Hub |
5.6 MW Secured Critical IT Utility Allocation |
|
|
STACK Infrastructure AMS3 Amsterdam Data Center Campus: Hyperscale AI Hub |
Strategic Hyperscale Corridor, Amsterdam Metropolitan Area, Netherlands |
Phased Multi-Stage Expansion |
Planned / Under Development |
~50 MW – 100 MW Utility Power Allocation |
|
|
STACK Infrastructure Hillsboro: 148MW Pacific Northwest Hyperscale Campus |
4735 NE Starr Blvd & NE Brookwood Pkwy, Hillsboro, OR 97124, USA |
Operational (Phased buildouts active across campus properties) |
Operational / Active Campus Expansion |
148.8 MW gross critical IT capacity |
|
|
STACK Infrastructure TOR01 Toronto: 56MW Canadian Hyperscale Campus |
3650 Danforth Ave, Scarborough, Toronto, ON M1N 2E8, Canada |
2026–2027 (Delivery of TOR01B and TOR01C 24MW phases) |
Operational / Active Campus Expansion |
56.0 MW critical IT capacity |
|
|
Stack Infrastructure Stafford Technology Campus (STC Campus) |
500-acre tract adjoined by landfill/light industrial zones, Stafford County, Virginia, USA |
2033 (Complete realization of the 19-facility multi-sub-campus blueprint) |
Planned / Pre-construction Phase (Announced January 2025) |
1,800 MW gross ultimate grid-connected substation capacity (6 x 300MW) |
|