Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Digital Edge Manila NARRA1 AI Data Center Campus – 10 MW 120 E Science Ave, Laguna Technopark, 4024 Biñan, Laguna, Philippines March 2023 (Operational across all 2,200 cabinet spaces) Fully Operational 10 MW total site power allocation
Digital Edge Navi Mumbai BOM1 Data Center Babasaheb Ambedkar Road, Ghansoli / Thane-Belapur Belt, Navi Mumbai, Maharashtra 400701, India Early 2027 Under Construction Phase 50.0 MW Gross Power Allocation / 40.0 MW Critical IT Power Load
Digital Edge CGK1 Data Center Cikarang GIIC Bekasi Greater Jakarta Indonesia Greenland International Industrial Center (GIIC), Cikarang, Bekasi 17530, Indonesia Q2 2027 (Campus Phase 1 Three-Building Buildout) Under Construction (Topped Out Q2 2026) 125 MW Gross Utility Power Capacity (CGK1 Building)
Digital Edge Ansan SEL2 AI Data Center: Greater Seoul South Korea Specs Seonggok-dong, Danwon-gu, Ansan-si, Gyeonggi-do, Greater Seoul, South Korea Multi-Phase 120 MW Master Campus Delivery Under Construction / Commissioning Phase ~140+ MVA Dedicated Substation Grid Capacity Allocation
Digital Edge Tokyo Data Center Campus (TYO Metro Facilities) 3-chōme-1-1 Sekiguchi, Bunkyo City, Tokyo 112-0014, Japan Fully Operational Active Multi-Site Campus Fully Operational Multi-Site Metro Campus ~45.0+ MW Total Combined Utility Power Allocation
Digital Edge Seoul Bupyeong Campus: 96MW AI-Ready Data Center in South Korea Bupyeong-gu, Incheon, Greater Seoul Metropolitan Area, South Korea Active Multi-Building Campus Expansion (SEL3 RFS Q4 2027) Phase 1 Operational (SEL2) / Phase 2 Under Construction (SEL3) 96 MW Secured Utility Power Allocation
Digital Edge Jakarta H1: $4.5B AI-Centric Megacampus Cikarang Digital Zone, Greater Jakarta, Indonesia Q2 2032 Under Construction (Groundbroken Q2 2026) 450 MW ultimate secured power allocation from the national grid
Digital Edge Palava 270MW Hyperscale Data Center Campus Mumbai 30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava NA Announced / Initial Planning & Site Preparation Scalable multi-stage power blocks engineered to deliver up to 270MW of total capability at full buildout.
Digital Edge SEL3: $582M 60MW Incheon AI Hyperscale Hub 422 Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea 2027 - Q4 Active / Under Heavy Structural Fabrication (Tracking June 2026) 60 MW net critical IT capacity dedicated to SEL3, supporting advanced rack densities exceeding 10kW per cabinet
Digital Edge SEL2: 36MW Incheon AI-Ready Hyperscale Hub Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea 2024 - Q4 Active / Operational & Fully Leased (Tracking June 2026) 36 MW net critical IT capacity optimized for high-power density applications
Digital Edge SEL5: 60MW Ansan AI Hyperscale Project Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea 2029 - Q4 Active / Secured Land & Early Civil Design Planning (Tracking June 2026) 60 MW net critical IT capacity supported by a dedicated 90 MVA utility allocation built to mitigate localized cluster spikes
EEC Hyperscale Data Center Campus Digital Edge Eastern Economic Corridor (EEC), Chon Buri Province, Thailand The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. Under Construction (Greenfield Project) 100 MW (IT Load for the flagship campus).
Digital Edge CGK Campus GIIC Industrial Estate, Kota Deltamas, Bekasi Q2 2027 Announced / Phase 1 Under Construction 500 MW (Current Phase) / 1,000 MW (Full Buildout)