Digital Edge

Digital Edge

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Digital Edge Palava 270MW Hyperscale Data Center Campus Mumbai 30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava NA Announced / Initial Planning & Site Preparation Scalable multi-stage power blocks engineered to deliver up to 270MW of total capability at full buildout.
Digital Edge SEL3: $582M 60MW Incheon AI Hyperscale Hub 422 Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea 2027 - Q4 Active / Under Heavy Structural Fabrication (Tracking June 2026) 60 MW net critical IT capacity dedicated to SEL3, supporting advanced rack densities exceeding 10kW per cabinet
Digital Edge SEL2: 36MW Incheon AI-Ready Hyperscale Hub Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea 2024 - Q4 Active / Operational & Fully Leased (Tracking June 2026) 36 MW net critical IT capacity optimized for high-power density applications
Digital Edge SEL5: 60MW Ansan AI Hyperscale Project Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea 2029 - Q4 Active / Secured Land & Early Civil Design Planning (Tracking June 2026) 60 MW net critical IT capacity supported by a dedicated 90 MVA utility allocation built to mitigate localized cluster spikes
EEC Hyperscale Data Center Campus Digital Edge Eastern Economic Corridor (EEC), Chon Buri Province, Thailand The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. Under Construction (Greenfield Project) 100 MW (IT Load for the flagship campus).
Digital Edge CGK Campus GIIC Industrial Estate, Kota Deltamas, Bekasi Q2 2027 Announced / Phase 1 Under Construction 500 MW (Current Phase) / 1,000 MW (Full Buildout)