Digital Edge Palava 270MW Hyperscale Data Center Campus Mumbai |
30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava |
NA |
Announced / Initial Planning & Site Preparation |
Scalable multi-stage power blocks engineered to deliver up to 270MW of total capability at full buildout. |
|
|
Digital Edge SEL3: $582M 60MW Incheon AI Hyperscale Hub |
422 Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea |
2027 - Q4 |
Active / Under Heavy Structural Fabrication (Tracking June 2026) |
60 MW net critical IT capacity dedicated to SEL3, supporting advanced rack densities exceeding 10kW per cabinet |
|
|
Digital Edge SEL2: 36MW Incheon AI-Ready Hyperscale Hub |
Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea |
2024 - Q4 |
Active / Operational & Fully Leased (Tracking June 2026) |
36 MW net critical IT capacity optimized for high-power density applications |
|
|
Digital Edge SEL5: 60MW Ansan AI Hyperscale Project |
Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea |
2029 - Q4 |
Active / Secured Land & Early Civil Design Planning (Tracking June 2026) |
60 MW net critical IT capacity supported by a dedicated 90 MVA utility allocation built to mitigate localized cluster spikes |
|
|
EEC Hyperscale Data Center Campus Digital Edge |
Eastern Economic Corridor (EEC), Chon Buri Province, Thailand |
The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. |
Under Construction (Greenfield Project) |
100 MW (IT Load for the flagship campus). |
|
|
Digital Edge CGK Campus |
GIIC Industrial Estate, Kota Deltamas, Bekasi |
Q2 2027 |
Announced / Phase 1 Under Construction |
500 MW (Current Phase) / 1,000 MW (Full Buildout) |
|