DataBank Houston AI Data Center Campus: High-Density Colocation & Cloud Hub Texas |
Westway Park Campus (5150 & 5170 Westway Park Blvd, 11003 Corporate Centre Dr), Houston, TX 77041, United States |
Operational Campus with Active AI & High-Density Rack Enhancements |
Fully Operational Facilities with Active High-Density AI & Capacity Expansion |
~42.5 MW Total Campus Utility Grid Connection Allocation |
|
|
DataBank PHX2 Phoenix Sky Harbor Data Center: Carrier-Neutral Colocation Hub |
615 N 48th St, Phoenix, AZ 85008, USA |
Operational Active Facility |
Fully Operational Colocation Hub |
0.2 MW Secured Utility Power Allocation |
|
|
DataBank Virginia South Campus Culpeper: 192MW Sustainable AI Hub |
Technology Zone Industrial Park, Culpeper, Virginia 22701, United States |
Active Multi-Building Campus Expansion |
Under Construction / Active Phase 1 Development |
192 MW Secured Utility Power Allocation |
|
|
DataBank DFW4 Dallas Empire Central: 4MW Colocation Hub |
1100 Empire Central Place, Dallas, TX 75247, United States |
Operational / Active High-Density AI & Hybrid Cloud Modernization |
Operational / Fully Commissioned Colocation Facility |
4.0 MW Critical IT Power Capacity |
|
|
DataBank DFW3 Plano: 40MW Dallas-Fort Worth Colocation Facility |
8375 Dominion Pkwy, Plano, TX 75024, USA |
Operational (Multi-phase expansion active) |
Operational / Active Expansion |
40.0 MW critical IT capacity |
|
|
DataBank ATL1 Midtown Atlanta: 7.1MW High-Performance Computing Hub |
760 W Peachtree St NW, Atlanta, GA 30308, USA |
Operational |
Operational |
7.1 MW critical IT load |
|
|
DataBank 2100 M St DC: 2MW Network Edge Colocation Hub |
2100 M St NW, Washington, DC 20037, USA |
Operational (16,600 sq ft active whitespace) |
Operational |
2.0 MW gross facility capacity |
|
|
DataBank Columbus 251 Neilston Street Data Center |
251 Neilston St, Columbus, Ohio 43215, USA |
H2 2015 (Consolidated floor layout optimized to full baseline capacity limits) |
Operational |
2.0 MW dedicated critical utility power supply |
|
|
Red Oak $2B DataBank Expansion for Oracle AI Cluster |
Red Oak, texas |
Projected by 2028–2029 as the 292-acre campus scales to its full 180MW+ AI capacity footprint |
Under Construction / Financing Closed (May 2026) |
180.0 MW (Phase 1) |
|